August 23, 2016

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2016404

Dear Mr. Faulk:

On July 27, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Shearon Harris Nuclear Power Plant, Unit 1. The inspection covered one or more of the key attributes of the Security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results that were discussed on July 27, 2016, with Mr. B. Waldrep and other members of your staff.

No NRC-identified or self-revealing findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety

Docket Nos.: 50-400 License No.: NPF-63

Enclosure:

IR 05000400/2016404 w/Attachment:

Supplementary Information (OUO)

cc: (See page 3)

_______________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE JOB2 VIA EMAIL GTH1 BBD

NAME J. BROWN G. HOPPER BDESAI

DATE 8/ 23 /2016 8/23/2016 8/ 23/2016

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Mr. Edward T. ONeil Director, Nuclear Protective Services Duke Energy (EC5ZD)

526 South Church Street Charlotte, NC 28202 Letter to Mr. Linwood Faulk from Mr. Binoy B. Desai dated August 23, 2016

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000400/2016404

DISTRIBUTION:

E. Wharton, NSIR N Simonian, NSIR C. Johnson, NSIR D. Garner, NSIR D. Ditto, NMSS G. Hopper, RII, DRP J. Dodson, RII, SR PE D. Jackson, RII, PE M. Riches, RII, RI BC PSBs, RI, RIII, RIV S. Price, RII, ORA/RC L. Gibson, EICS RIDSNRRDIRS PUBLIC - OUO removed