IR 05000321/2016406

From kanterella
Jump to navigation Jump to search
NRC Material Control and Accounting Inspection Report 05000321/2016406 and 05000366/2016406
ML16349A021
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/14/2016
From: Shane Sandal
NRC/RGN-II/DRP/RPB2
To: Vineyard D
Southern Nuclear Operating Co
References
IR 2016406
Download: ML16349A021 (5)


Text

UNITED STATES ember 14, 2016

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000321/2016406 AND 05000366/2016406

Dear Mr. Vineyard:

On November 18, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a Material Control and Accounting inspection at your Edwin I. Hatch Nuclear Plant Units 1 and 2. On December 2, 2016 the NRC inspectors discussed the results of this inspection with Mr. Brinson and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report. The NRC inspector did not identify any findings.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA Frank Ehrhardt Acting for/

Shane Sandal, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos.: 50-321, 50-366 License Nos.: DPR-57, NPF-5 Nonpublic Enclosure:

NRC MC&A IR 05000321/2016406, 05000366/2016406 w/Attachment:

Supplemental Information cc w/ enclosure: See page 3 cc w/o enclosure: Distribution via Listserv ML16349A004 (Cover letter w/ enclosure)

ADAMS ACCESSION NUMBER: ML16349A021 (Cover letter)

Entire Report: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: Curt Rapp Cover Letter Only: Non-Sensitive Publicly Available Keyword:

SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: Curt Rapp OFFICE RII: DRP RII: DRP RII: DRP NAME DRetterer CRapp SSandal SIGNATURE DLR2 via email CWR1 FJE /RA for/

DATE 12/13/2016 12/13/2016 12/13/2016 cc:

Stephen P. McGavin Nuclear Fleet Security Director Southern Nuclear Operating Co., Inc.

40 Iverness Center Parkway Bin B042 Birmingham, AL 35242 Letter to David from Shane Sandal dated December 14, 2016 SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000321/2016406 AND 05000366/2016406 DISTRIBUTION:

M. Kowal, RII S. Price, RII S. Maxey, RII RIDSNRRDIRS OE Mail RidsNrrPMHatchResource PUBLIC