U.S. Nuclear Regulatory Commission Security Inspection Report 05000321/2016403 and 05000366/2016403 (Letter Only)
ML16319A188
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/10/2016
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Mcgavin S
Southern Nuclear Operating Co
References
IR 2016403
Download: ML16319A188 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 10, 2016 Mr. Stephen Fleet Security Director Southern Nuclear Operating Co., Inc.

Edwin I. Hatch Nuclear Plant 40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000321/2016403 AND 05000366/2016403

Dear Mr. McGavin:

On October 6, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Edwin I. Hatch Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results that were discussed on October 6, 2016, with Mr. G. Johnson and members of the Plant Hatch staff.

No NRC-identified or self-revealing findings were identified during this inspection.

However, inspectors documented two licensee-identified violations, which were determined to be of very low safety significance in this report. The NRC is treating these violations as a non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. If you contest these violations or significance of these NCVs, you should provide a response within 30 days of the date of this IR with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region II, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Plant Hatch.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket No. 50-321, 50-366 License No. DPR-57, NPF-5 Enclosure:

IR 05000321 and 05000366/2016403 w/Attachment: Supplemental Information (OUO)

cc: (See page 3) SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB2 RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2 SIGNATURE JCS3 FOR ICH JCS3 SRS5 BBD NAME I. Hall J. Shehee S. Sandal B. Desai DATE 11/ 10 /2016 11/10 /2016 11/10/2016 11/9&10 /2016 E-MAIL COPY YES NO YES NO YES NO YES NO cc:

Mr. Jonathan M. Merritt Site Security Manager (Nuclear)

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 Michael P. Long Fleet Cyber Security Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242 Mr. Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.

40 Inverness Center Parkway (Bin B042)

Birmingham, AL 35242