Category:Enforcement Action
MONTHYEARIR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000317/20160082016-11-0909 November 2016 NRC Triennial Fire Protection Inspection Report 05000317/2016008 and 05000318/2016008 and Exercise of Enforcement Discretion IR 05000317/20114032011-07-26026 July 2011 IR 05000317-11-403, IR 05000318-11-403; 01/26/2011-07/13/2011; Calvert Cliffs Nuclear Power Plant; Special Inspection, Dated July 26, 2011 (Letter Only) IR 05000317/20100042010-11-0404 November 2010 IR 05000317-10-004, 05000318-10-004; Constellation Energy Nuclear Group, LLC; 07/01/2010 - 09/30/2010; Calvert Cliffs Nuclear Power Plant (Cnpp), Units 1 and 2, NRC Integrated Inspection Report and Exercise of Enforcement Discretion ML0909003172009-03-31031 March 2009 EN-09-018 - Issuance of Final Significance Determination and Notice of Violation IR 05000317/20060122006-10-27027 October 2006 EA-06-198, Final Significance Determination for White Findings and Notice of Violation (NRC Inspection Reports Nos. 05000317/200612 and 05000318-2006012 - Calvert Cliffs Nuclear Power Plant) ML0425200562004-09-0707 September 2004 EA-04-110, Calvert Cliffs, White Finding ML0225302982002-09-0909 September 2002 EA-02-159, Calvert Cliffs, Notice of Violation and White Finding 2023-10-26
[Table view] Category:Inspection Report Correspondence
MONTHYEARML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding ML22320A0432022-11-15015 November 2022 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20164032016-11-10010 November 2016 Errata for Calvert Cliffs Nuclear Power Plant - Baseline Security Inspection Report 05000317/2016403, 5000318/2016403; Independent Spent Fuel Storage Security Inspection Report 07200008/2016401; and Exercise of Enforcement Discretion (Lette ML16159A2682016-06-14014 June 2016 Cover Letter - Calvert Cliff Nuclear Power Plant - NRC Security Baseline Inspection Report 05000317/2016201 and 05000318/2016201 ML12100A2172012-04-0909 April 2012 NRC Investigation Report No. I-2011-047, Letter to Constellation Energy IR 05000317/20114032011-07-26026 July 2011 IR 05000317-11-403, IR 05000318-11-403; 01/26/2011-07/13/2011; Calvert Cliffs Nuclear Power Plant; Special Inspection, Dated July 26, 2011 (Letter Only) ML1020704062010-07-26026 July 2010 Notification of Conduct of a Triennial Fire Protection Baseline Inspection While Transition to 10 CFR Part 50.48(c) Is in Progress ML0811601542008-04-23023 April 2008 Notification of Inspection of the Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Using Temporary Instruction 2515/171 IR 05000317/20074032007-06-15015 June 2007 IR 05000317-07-403, and IR 05000318-07-403, on 05/14/2007 - 05/17/2007, Calvert Cliffs Nuclear Power Plant, Material Control and Accounting (Mc&A) Program. Cover Letter IR 05000003/20180062006-10-12012 October 2006 IR 05000317-06-301 and IR 05000318-06/301 on 08/25, 08/28 - 09/01, 09/13 and 09/05-29/2006, Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Initial Operator Licensing Examination IR 05000317/20030062004-01-16016 January 2004 IR 05000317-03-006, 05000318-03-006; 9/28/2003-12/31/2003; Calvert Cliffs Nuclear Plant, Units 1 and 2; Operability Evaluations IR 05000317/20010122002-01-28028 January 2002 IR 05000317/2001-012, IR 05000318/2001-012, Calvert Cliffs Nuclear Plant Inc.; Calvert Cliffs Nuclear Power Plant, Units 1 & 2, Inspection on 11/11/2001 - 12/29/2001 Re Problem Identification and Resolution. Two Noncited Violations Noted ML0202805052002-01-28028 January 2002 IR 05000317/2001-012, IR 05000318/2001-012, on 11/11-12/29/2001, Calvert Cliffs Nuclear Plant, Inc.; Calvert Cliffs Nuclear Power Plant, Units 1 & 2. Problem Identification and Resolution. Three Non-Cited Violations Noted IR 05000317/20010132002-01-14014 January 2002 IR 05000317/2001-013, Calvert Cliffs Nuclear Plant, Inc, Calvert Cliffs Nuclear Power Plant Units 1&2, Supplemental Inspection on 12/10-12/13/2001 Re Degraded Cornerstone in Mitigating Systems & One Degraded Cornerstone 2023-10-06
[Table view] Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] Category:Inspection Report
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 IR 05000317/20230112023-05-10010 May 2023 Title 10 of the Code of Federal Regulations 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Report 05000317/2023011 and 05000318/2023011 IR 05000317/20230012023-04-24024 April 2023 Integrated Inspection Report 05000317/2023001 and 05000318/2023001 IR 05000317/20234022023-04-19019 April 2023 Security Baseline Inspection Report 05000317/2023402, 05000318/2023402 and Independent Spent Fuel Storage Installation Security Inspection 07200008/2023401, 07200078/2023401 (Cover Letter Only) IR 05000317/20220062023-03-0101 March 2023 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2022006 and 05000318/2022006) IR 05000317/20220042023-01-24024 January 2023 Integrated Inspection Report 05000317/2022004 and 05000318/2022004 IR 05000317/20220102022-12-19019 December 2022 Triennial Fire Protection Inspection Report 05000317/2022010 and 05000318/2022010 IR 05000317/20224022022-12-12012 December 2022 Security Baseline Inspection Report 05000317/2022402 and 05000318/2022402 (Cover Letter Only) IR 05000317/20220902022-12-0505 December 2022 EA-22-089: Calvert Cliffs Nuclear Power Plant, Unit 1 - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation: Inspection Report 05000317/2022090 ML22314A0872022-11-14014 November 2022 Notification of Conduct of Title 10 of the Code of Federal Regulations 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors, Inspection IR 05000317/20225012022-11-14014 November 2022 Emergency Preparedness Inspection Report 05000317/2022501 and 05000318/2022501 IR 05000317/20220032022-11-0707 November 2022 Integrated Inspection Report 05000317/2022003 and 05000318/2022003 and Preliminary White Finding and Apparent Violation IR 05000317/20224012022-09-0808 September 2022 Material Control and Accounting Program Inspection Report 05000317/2022401 and 05000318/2022401 (Cover Letter Only) IR 05000317/20220052022-08-31031 August 2022 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2022005 and 05000318/2022005) IR 05000317/20223012022-08-16016 August 2022 Initial Operator Licensing Examination Report 05000317/2022301 and 05000318/2022301 IR 05000317/20220022022-08-0808 August 2022 Integrated Inspection Report 05000317/2022002 and 05000318/2022002 IR 05000317/20220112022-07-18018 July 2022 Post-Approval Site Inspection for License Renewal - Phase 4 05000317/2022011 and 05000318/2022011 IR 05000317/20224202022-06-0707 June 2022 Plat Units 1 & 2 - Security Baseline Inspection Report 05000317/2022420 and 05000318/2022420 IR 05000317/20220012022-05-0202 May 2022 Integrated Inspection Report 05000317/2022001 and 05000318/2022001 IR 05000317/20210062022-03-0202 March 2022 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2021006 and 05000318/2021006) IR 05000317/20210042022-01-31031 January 2022 Integrated Inspection Report 05000317/2021004 and 05000318/2021004 IR 05000317/20210012022-01-24024 January 2022 Reissued Integrated Inspection Report 05000317/2021001 and 05000318/2021001 IR 07200008/20210012022-01-13013 January 2022 Independent Spent Fuel Storage Installation (ISFSI) NRC Inspection Report No. 07200008/2021001 IR 05000317/20210032021-11-0909 November 2021 Integrated Inspection Report 05000317/2021003 and 05000318/2021003 IR 05000317/20214012021-10-0505 October 2021 Security Baseline Inspection Report 05000317/2021401 and 05000318/2021401 (Cover Letter Only) IR 05000317/20210122021-10-0404 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000317/2021012 and 05000318/2021012 IR 05000317/20215012021-09-23023 September 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2021501 and 05000318/2021501 IR 05000317/20210052021-09-0101 September 2021 Updated Inspection Plan for the Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2021005 and 05000318/2021005) IR 05000317/20210022021-08-10010 August 2021 Integrated Inspection Report 05000317/2021002 and 05000318/2021002 IR 05000317/20210112021-07-29029 July 2021 Temporary Instruction 2515/194 Inspection Report 05000317/2021011 and 05000318/2021011 IR 05000317/20210102021-07-28028 July 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000317/2021010 and 05000318/2021010 IR 05000317/20213012021-07-26026 July 2021 Initial Operator Licensing Examination Report 05000317/2021301 and 05000318/2021301 ML21124A0372021-05-0404 May 2021 Integrated Inspection Report 05000317/2021001 and 05000318/2021001 IR 05000317/20200062021-03-0303 March 2021 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Reports 05000317/2020006 and 05000318/2020006) IR 05000317/20200042021-02-0202 February 2021 Integrated Inspection Report 05000317/2020004 and 05000318/2020004 and Independent Spent Fuel Storage Installation Inspection Report 07200008/2020002 IR 05000317/20200032020-11-13013 November 2020 Integrated Inspection Report 05000317/2020003 and 05000318/2020003 IR 05000317/20204022020-10-26026 October 2020 Security Baseline Inspection Report 05000317/2020402 and 05000318/2020402 IR 05000317/20204012020-10-15015 October 2020 Security Baseline Inspection Report 05000317/2020401 and 05000318/2020401 IR 05000317/20200112020-10-0101 October 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000317/2020011 and 05000318/2020011 IR 05000317/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000317/2020005 and 05000318/2020005) 2024-02-01
[Table view] |
Text
uly 26, 2011
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT - NRC SPECIAL INSPECTION REPORT NO. 05000317/2011403 AND 05000318/2011403; PRELIMINARY GREATER THAN GREEN FINDING
Dear Mr. Gellrich:
On July 13, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a Special Inspection at your Calvert Cliffs Nuclear Power Plant. The enclosed report documents the inspection results, which were discussed on July 13, 2011, with you and other members of your staff.
The special inspection team examined activities conducted under your licenses as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your licenses. The team reviewed selected procedures and records, observed activities, and interviewed personnel.
The enclosed report documents one finding that has the potential for greater than very low security significance (i.e., greater-than-Green as determined by the Baseline Security Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the team departed the site.
The finding had a cross-cutting aspect in the area of Human Performance (Work Practices) for failing to effectively communicate expectations regarding procedural compliance and personnel following procedures H.4(b). If you disagree with the cross-cutting aspect assigned to this finding, you should provide a response within 30 days of the date of this report, with the basis for your disagreement, to the Regional Administrator, Region I, and the NRC resident inspectors at Calvert Cliffs.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. In accordance with NRC Inspection Manual Chapter (IMC) 0609, we intend to complete our evaluation using the best available information and issue our final determination of security significance within 90 days of the date of this letter. The significance determination process encourages an open dialogue between the NRC staff and the licensee; however, the dialogue should not impact the timeliness of the staffs final determination.
Before we make a final significance decision regarding our preliminary greater-than-Green finding, we are providing you an opportunity to: (1) attend a Regulatory Conference where you can present to the NRC your perspective on the facts and the assumptions the NRC used to arrive at the finding and assess its significance, or (2) submit your position on the finding to the NRC in writing. If you request a Regulatory Conference, it should be held within 30 days of the receipt of this letter, and we encourage you to submit supporting documentation at least one week prior to the conference in an effort to make the conference more efficient and effective. If a Regulatory Conference is held, it will be closed for public observation because it involves sensitive security information. If you decide to submit only a written response, such submittal should be sent to the NRC within 30 days of the receipt of this letter. If you decline to request a Regulatory Conference or submit a written response, you relinquish your right to appeal the final Significance Determination Process determination, in that by not doing either, you fail to meet the appeal requirements stated in the Prerequisite and Limitation sections of Attachment 2 of IMC 0609.
Please contact Mr. James Trapp of my staff at (610) 337-5186 within 10 days of the date of this letter to notify the NRC of your intentions. If we have not heard from you within 10 days, we will continue with our significance determination and enforcement decision.
Because the NRC has not made a final determination in this matter, no Notice of Violation is being issued for this inspection finding at this time. In addition, please be advised that the number and characterization of the findings described in the enclosed inspection report may change as a result of further NRC review.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room located at NRC Headquarters in Rockville, MD, and from the Publicly Available Records (PARS) component of NRC=s document system, Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure and attachments will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Christopher G. Miller, Director Division of Reactor Safety Docket Nos. 50-317, 50-318 License Nos. DPR-53, DPR-69 Non-Public Enclosure: NRC Inspection Report No. 05000317/2011403, 05000318/2011403 Attachments: Supplemental Information Chronology of Events Special Inspection Team Charter cc w/encl; w/OUO-SRI:
D. Bartnik, Director, Nuclear Security T. Levering, Emergency Response Director, State of Maryland A. Lauland, Director, Department of Homeland Security, State of Maryland cc w/o encl; w/o OUO-SRI: Distribution via ListServ