IR 05000269/1987043

From kanterella
Jump to navigation Jump to search
Insp Repts 50-269/87-43,50-270/87-43 & 50-287/87-43 on 871110-12.No Violations or Deviations Noted.Weakness Re Failure to Maintain Adequate Control Room Log Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise
ML16161A917
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/25/1987
From: Decker T, Testa E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML16161A916 List:
References
50-269-87-43, 50-270-87-43, 50-287-87-43, NUDOCS 8712040410
Download: ML16161A917 (10)


Text

pjk REGU UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

I 101 MARIETTA STREET, ATLANTA, GEORGIA 30323 NOV 2 7 190 Report Nos.:

50-269/87-43, 50-270/87-43, and 50-287/87-43 Licensee:

Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:

50-269, 50-270 and 50-287 License Nos.:

DPR-38, DPR-47, and DPR-55 Facility Name: Oconee Nuclear Station Inspection Conducted:

November 10-12, 1987 Inspector: Ah E. D. Testa Date Signed Accompanying Personnel:

T. R. Decker W. M. Sartor J. L. Kreh P. H. Skinner F. W. Victor Approved by:

_

5_

6/

/ /

e

T. R. Decker, Section Chief Date Signed Emergency Preparedness Section Division of Radiation Safety and Safeguards SUMMARY Scope:

This routine, announced inspection was in the area of the annual emergency preparedness exercis Results:

No violations or deviations were identified; however, one exercise weakness was identified addressing the failure to maintain an adequate Control Room lo PDR ADOCK 05000269 G

PDR

REPORT DETAILS 1. Persons Contacted Licensee Employees

  • M. Tuckman, Station Manager
  • F. Owens, Compliance
  • D. Davidson, Compliance
  • P. Kusek, Information Center
  • D. Berkshire, Health Physicist
  • D. Simpson, Compliance
  • R. Leonard, Compliance
  • C. Jennings, Site Emergency Planner
  • D. Sweigart, Operations
  • J. McIntosh, Superintendent, Station Services
  • C. Yongue, Health Physicist
  • R. Harris, System Emergency Planner T. Barr, Training Manager W. Roach, Administrative Supervisor
  • W. McAlister, I&E Support Engineer Other licensee employees contacted included engineers, technicians, operators, mechanics, security force members, and office personne NRC Resident Inspectors J. Bryant
  • Skinner
  • Attended exit interview 2. Exit Interview The inspection scope and findings were summarized on November 12, 1987, with those persons indicated in Paragraph 1 abov The inspector described the areas inspected and discussed in detail the inspection finding No dissenting comments were received from the licensee. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio. Licensee Action on Previous Enforcement Matters No previous emergency preparedness enforcement matters remained outstandin. Exercise Scenario (82301)

The scenario for the emergency exercise was reviewed to assure that provisions were made to test the integrated capability and a major portion

of the basic elements defined in the licensee's emergency plan and organization pursuant to 10 CFR 50.47(b)(14), Paragraph IV.F of Appendix E to 10 CFR 50, and specific criteria defined in Section II.N of NUREG-065 The scenario was reviewed in advance of the scheduled exercise date. No major scenario problems were identifie The scenario developed for this small scale exercise was detailed, and exercised the onsite emergency organizatio The exercise was conducted from approximately 7:30 am to 11:30 am on November 11, 1987. The scenario involved Unit 1 operating with approximately 0.12% failed fue The unit experienced a loss of vacuum and the main turbine and main feedwater pumps both tripped on low vacuum. The reactor tripped when the main turbine and main feedwater pumps tripped. Cold emergency feedwater supplying the "18" steam generator caused a steam generator tube leak of approximately 450 gpm. Rapid main steam pressure increase on the trip caused a large body to bonnet leak on the "lB" main steam line atmospheric dump block valv Flow paths from the reactor coolant system to the environment and Turbine Building were thus establishe The licensee made a large commitment to training and personnel through the use of controllers, evaluators, and required personnel participating in the exercis The exercise used the onsite simulator as the Unit 1 Control Roo Its use provided a unique opportunity to evaluate player reaction to dynamically changing plant condition Players were able to demonstrate those actions that would be taken to cope with an emergency in the plan Use of the simulator provided a high degree of realism for this exercis The controllers provided adequate guidance throughout the exercise; however, some prompting was noted by the inspector. This item is discussed in detail in Paragraph 10, belo No violations or deviations were identifie. Assignment of Responsibility (82301)

This area was observed to assure that primary responsibilities for emergency response by the licensee were specifically established, and that adequate staff was available to respond to an emergency pursuant to 10 CFR 50.47(b)(1),

Paragraph IV.A of Appendix E to 10 CFR 50, and specific criteria defined in Section II.A of NUREG-065 The inspectors observed that specific emergency assignments were made for the licensee's onsite emergency response organization, and that adequate staff was available to respond to the simulated emergenc The initial response organization was augmented by designated licensee representatives; however, because of the scenario scope and conditions, long term or continuous staffing of the emergency response organization was not require Discussions with licensee representatives indicated that sufficient technical staff was available to provide for continuous staffing of the augmented emergency organization, if neede The inspector also observed activation, staffing, and operation of the emergency organization in the Technical Support Center (TSC)

and Operations Support Center (OSC).

At each response center, the required staffing and assignment of responsibility were consistent with the licensee's approved procedure No violations or deviations were identifie. Onsite Emergency Organization (82301)

The licensee's onsite emergency organization was observed to assure that the following requirements were implemented pursuant to 10 CFR 50.47(b)(2),

Paragraph IV.A of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.B of NUREG-0654:

(1) responsibilities for emergency response were unambiguously defined; (2) adequate staffing was provided to assure initial facility accident response in key functional areas at all times; (3) onsite and offsite support organizational interactions were specifie The inspectors observed that the initial onsite emergency organization was adequately defined, and that staff was available to fill key functional positions within the organizatio Augmentation of the initial emergency response organization was accomplished through mobilization of additional day-shift personne The on-duty simulator Shift Supervisor assumed the duties of Emergency Coordinator promptly upon initiation of the simulated emergency, and directed the response until formally relieved by the Station Manage No violations or deviations were identifie. Emergency Classification System (82301)

This area was observed to assure that a standard emergency classification and action level scheme was in use by the nuclear facility licensee pursuant to 10 CFR 50.47(b)(4), Paragraph IV.C of Appendix E to 10 CFR 50, and specific criteria promulgated in Section I.D of NUREG-065 An Emergency Action Level matrix was used to promptly identify and properly classify the emergency and escalate to more severe emergency classifications as the simulated accident sequence progresse Licensee actions in this area were timely and effectiv Observations confirmed that the emergency classification system was effectively used and was consistent with the Radiological Emergency Plan and Implementing Procedure The system appeared to be adequate for classification of the simulated accident sequence The emergency procedures provided for initial and continuing mitigating actions to be implemented throughout the exercis No violations or deviations were identifie. Notification Methods and Procedures (82301)

This area was observed to assure that procedures were established for notification of State and local response organizations and emergency personnel by the licensee, and that the content of initial and followup messages to response organizations were establishe This area was further observed to assure that means to provide early notification to the populace within the plume exposure pathway were established pursuant to 10 CFR 50.47(b)(5),

Paragraph IV.D of Appendix E to 10 CFR 50, and specific criteria defined in Section II.E of NUREG-065 An inspector observed that notification methods and procedures were established and available for use in providing information regarding the simulated emergency conditions to Federal, State, and local response organizations, and to alert the licensee's augmented emergency response organizatio Notification of the State of South Carolina, and local offsite organizations was completed within 15 minutes following declaration of each emergency classificatio No violations or deviations were identifie.

Emergency Communications (82301)

This area was observed to assure that provisions existed for prompt communications among principal response organizations and emergency personnel pursuant to 10 CFR 50.47(b)(6), Paragraph IV.E of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.F of NUREG-065 The inspector observed communications within and between the licensee's emergency response facilities (Control Room Simulator, TSC, and OSC), and between the offsite environmental monitoring teams and the TS The inspector observed that radio communications with offsite environmental monitoring field teams needs to be improve Specifically it was observed that offsite environmental monitoring field teams at times were located in "dead spots" and could not communicate reliably with the TS One radio used by a sampling team had to be "hot wired" in order to make the radio set functio The inspector also observed that the predesignated sample points were not used to direct field teams to sample location or report field team position Inspector Followup Item (50-269/87-43-01, 50-270/87-43-01, 50-287/87-43-01) Failure to demonstrate adequate radio communications with offsite radiological environmental field team *

No violations or deviations were identifie.

Emergency Facilities and Equipment (82301)

This area was observed to assure that adequate emergency facilities and equipment to support an emergency response were provided and maintained pursuant to 10 CFR 50.47(b)(8), Paragraph IV.E of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.H of NUREG-065 The inspectors observed activation, staffing, and operation of the emergency response facilities and observed the use of equipment at the facilities. Emergency response facilities used by the licensee during the exercise included the Simulator Control Room (CR),

Operations Support Center, and the Technical Support Cente Simulator Control Room - The inspector observed that following review and analysis of the sequence of accident events, Simulator Control Room operations personnel acted promptly to initiate required responses to the simulated emergenc Emergency procedures were readily available, routinely followed, and factored into accident assessment and mitigation exercise It was observed, however, that at times controllers were prompting the players by providing more information than the situation require Several examples demonstrating this observation included:

(1) the controller reminding the Operating Engineer that he needed a report status of IMS-98 as soon as possible, (2) when asked by a player if the simulator alarm on R-40 was valid with the "B" steam generator isolated the controller responded by saying the alarm was not valid, you have isolated the correct generator, (3) when asked by a player which side of IMS-98 was ruptured he was told by a controller that the hole was on the feedpump sid Inspector Followup Item (50-269/87-43-02, 50-270/87-43-02, 50-287/87-43-02) Exercise prompting by controllers in the Simulator Control Roo The location of the simulator limited the number of personnel and precluded overcrowding and maintained an ambient noise level required for the orderly conduct of operating under emergency condition It was observed by an inspector that a Shift Supervisor's bound log was available and a limited entry of initial Unit 1 operating information was mad No other sequence of events or Unit operating data were entered following exercise initiatio Based on the observation above, the following item is considered to be an exercise weaknes Exercise Weakness (50-269/87-43-03, 50-270/87-43-03, 50-287/87-43-03)

Failure to maintain an adequate control room log boo Simulator Control Room personnel demonstrated an understanding of the emergency classification system and the proficient use of specific

procedures to determine and declare the proper emergency classificatio b. Technical Support Center - The TSC was activated and promptly staffed following notification by the Shift Supervisor of the simulated emergency conditions leading to the Alert classificatio The facility staff appeared to be cognizant of their emergency duties, authorities, and responsibilitie Required operations at the facility proceeded in an orderly manner. The facility was provided with adequate equipment for support of the assigned staf Inspection disclosed the following additional findings, namely:

(1)

assumption of duties by the Emergency Coordinator was definite and firm; (2) briefings of the TSC staff were frequent and consistent with changes in plant status and related emergency conditions; (3)

accountability was implemented within the accepted time regime and was consistent with the scenario scop c. Operations Support Center -

The OSC was promptly staffed following activation of the emergency plan by the Emergency Coordinato The inspector observed that teams were assembled, briefed, and dispatche The OSC Supervisor appeared to be cognizant of his duties and responsibilitie Events postulated by the scenario would have contaminated a significant portion of the Turbine Dec Emergency Response personnel manning the TSC and OSC traversed this area and some were designated as contaminate The inspector noted that for at least 20 minutes, the step-off pad at the south entrance to the Unit-3 Control Room (entrance to the OSC)

was in place with no indication that it was being used for drill purpose Also, personnel periodically entered and exited the TSC without regard for friskin The inspector observed that exercise designated contaminated shoe covers were worn and carried through the TSC and placed on a counter top near the frisker in the facilit Inspector Followup Item (50-269/87-43-04, 50-270/87-43-04, 50-287/87-43-04) Radiological contamination control at the Operations Support Center and Technical Support Cente No violations or deviations were identifie.

Accident Assessment (82301)

This area was observed to assure that adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition were in use as required by 10 CFR 50.47(b)(),

Paragraph IV.B of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.I of NUREG-065 The accident assessment program included an engineering assessment of plant status, and an assessment of radiological hazards to onsite and offsite personnel resulting from the simulated acciden During the exercise, the engineering accident assessment team functioned effectively in analyzing plant status to provide recommendations to the Emergency Coordinator regarding mitigating actions required to reduce damage to plant systems and equipment, prevention of releases of radioactive materials, and termination of the emergency conditio Radiological assessment activities involved several group An inplant group was effective in estimating the radiological impact within the plant based upon inplant monitoring and onsite measurement Offsite radiological environmental monitoring teams were dispatched to determine the level of radioactivity in those areas within the influence of the plum No violations or deviations were identifie.

Exercise Critique (82301)

The licensee's critique of the emergency exercise was observed to determine that shortcomings identified as part of the exercise was brought to the attention of management and documented for corrective action pursuant to 10 CFR 50.47(b)(14), Paragraph IV.F of Appendix E, 10 CFR 50, and the specific criteria promulgated in NUREG-0654,Section I A formal critique was held on November 12, 1987, with exercise controllers and observers, licensee management, and NRC representative Required improvements identified during the exercise and plans for corrective action were discussed. Licensee action on such findings will be reviewed during subsequent inspection The licensee's critique was detailed, and addressed both substantive deficiencies and indicated improvement item The conduct and content of the critique were consistent with regulatory requirements and guidance cited abov No violations or deviations were identifie Oconee Nuclear Station 1987 Exercise I. SCOPE AND OBJECTIVES A. Scope The 1987 Oconee Nuclear Station exercise is designed to meet the exercise requirements of 1OCFR5O, Appendix E,Section IV.F. The Duke Power Technical Support Center, Operational Support Center, and control room will participate fully. The Duke Power Crisis Management Center and the state and counties will not participat On November 11, 1987, a simulated radiological accident will be held to test the integrated capabilities and a major portion of the basic elements within the emergency plans and organizations. This exercise will simulate emergency conditions which would require response by the on-site emergency organization Exercise objectives are provided in Section Exercise Objectives 1. Demonstrate the ability to declare emergency classification in accordance with procedure.

Demonstrate the ability to notify the State and the counties within 15 minutes after declaring an emergency or after changing the emergency classificatio.

Demonstrate the ability to alert, notify, and staff the TSC and OSC facilities after declaring an Alert or higher emergency clas.

Demonstrate the ability to notify NRC not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after declaring one of the emergency classe. Demonstrate assembly of station personnel within 30 minutes in a simulated emergency and provide accountability for any not present at the assembly location. Demonstrate access control measures to the plant sit. Test communications equipment among on-site emergency facilities including plant extensions, intercoms, and the on-site radio syste. Test off-site communications equipment to the county and state warning points and to NRC including the Selective Signaling System, outside telephone lines, and the NRC Emergency Notification Syste. Test the adequacy and operability of emergency equipment/supplie. Demonstrate precise and clear transfer of responsibility from the Shift Supervisor in the Control Room to the Emergency Coordinator in the TS. Demonstrate proper use of the message format and authentication methodology for messages transmitted to states and countie. Demonstrate the ability to provide accurate information to the news media in a timely manner and to provide effective rumor control according to the Crisis Management Implementing Procedure.

Demonstrate the ability to provide data to the TSC and OSC in accordance with station procedure. Evaluate the adequacy of the following assessment tools:

1. Drawings 2. Data Display Boards 3. Maps 15. Demonstrate the ability to continuously monitor and control emergency worker exposur. Demonstrate the ability to determine on-site radiation levels and airborne radioiodine concentration. Demonstrate the ability to develop off-site dose projections in accordance with procedure. Demonstrate adequate radio communications between the off-site monitoring teams and the TS.

Demonstrate the ability to locate a simulated, radioactive plume and to measure the off-site radiation level. Demonstrate the ability to provide timely and appropriate protective action recommendations to off-site officials in accordance with station procedure.

Demonstrate the ability to assess the incident and provide mitigation strategies in accordance with station procedure