IR 05000269/1987041

From kanterella
Jump to navigation Jump to search
Insp Repts 50-269/87-41,50-270/87-41 & 50-287/87-41 on 871019-23.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/Prevention & Seismic Monitoring Equipment
ML16161A914
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/12/1987
From: Conlon T, Harris J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML16161A913 List:
References
50-269-87-41, 50-270-87-41, 50-287-87-41, NUDOCS 8711200376
Download: ML16161A914 (11)


Text

Pa REcj UNITED STATES

.0 NUCLEAR REGULATORY COMMISSION

REGION II

/.

101 MARIETTA STREET, ATLANTA, GEORGIA 30323 Report Nos.:

50-269/87-41, 50-270/87-41, and 50-287/87-41 Licensee:

Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, License Nos.: DPR-38, DPR-47, and and 50-287 DPR-55 Facility Name:

Oconee 1, 2, and 3 Inspection Conducted:

October 19-23, 1987 Inspector: _

_

__/vt_

2/.' 7 J. R. Harfis Date Signed Approved by: C-4 (

,-6,.

"34/

T. E. Conlon, C ief Date Signed Plant Systems Section Division of Reactor Safety SUMMARY Scope:

This routine, announced inspection was in the areas of Fire Protection/Prevention and Seismic Monitoring Equipmen Results:

No violations or deviations were identifie PDR ADOCK 05000269 G

PDR

REPORT DETAILS 1. Persons Contacted Licensee Employees

  • R. J. Brackett, Station Manager
  • H. 0. Brandes, Analytical Engineer
  • S. R. Christopher, Analytical Engineer
  • W. J. Itin, Safety Supervisor
  • T. E. Kelly, Fire Protection Supervisor
  • J. T. McIntosh, Superintendent Station Services
  • T. C. Matthews, Compliance Specialist
  • M. S. Tuckman, Station Manager Other licensee employees contacted included maintenance craftsmen, engineers, technicians, operators, mechanics, security force members, and office personne NRC Resident Inspectors J. Bryant P. Skinner
  • Attended exit interview Exit Interview The inspection scope and findings were summarized on October 23, 1987, with those persons indicated in paragraph 1 abov The inspector described the areas inspected and discussed in detail the inspection findings. No dissenting comments were received from the license The licensee did not identify as proprietary any of the material provided to or reviewed by the inspector during this inspectio.

Licensee Action on Previous Enforcement Matters (Open)

Deviation 269/86-20-02, Discrepancies Between FSAR and Installed Seismic Instrumentatio Section 3.7.4.1 of the Oconee Final Safety Analysis Report (FSAR)

provides the location and description of the seismic instrumentation installed at the sit The FSAR describes six locations, all in the Unit 1 plant, where peak recording accelerometers are to be installe Contrary to the above FSAR requirements, only one peak recording accelerometer was operabl During this inspection, the inspector reviewed FSAR requirements for seismic monitoring, visually examined seismic instrumentation, reviewed procedures addressing inspection and calibration of seismic instrumenta tion and reviewed records of inspections made on seismic instrumentatio Examination of equipment showed that there are three different systems that provide separate indications of seismic event These are a SMA-3 strong motion acceleration system, TS-3A seismic Trigger Switch and six 2G peak recording accelerometer The SMA-3 strong motion acceleration system is a multichannel, centralized recording, magnetic tape accelerograph designed to detect and record strong local earthquakes. The system consists of a seismic trigger, two force balance accelerometers and a

recorde The force balance accelerometers are located in the Unit 1 tendon gallery and reactor building. The recorder is located in the Unit 1 cable room. The seismic trigger is located in the Unit 1 tendon gallery. The operational sequence is as follows: the seismic trigger senses the initial earthquake ground motion with a normal setting of 0.01g and actuates the SMA-3 to full operation in less than 0.1 seconds. The SMA-3 operates for as long as the trigger detects the earthquake plus an additional 110 second The accelerograph can thus record a single earthquake or a sequence of earthquakes and aftershocks lasting as long as 30 minute The TS-3A triaxial seismic trigger switch located in the tendon gallery with an accelerometer feeds an alarm to the control room when a seismic earth motion of 0.05g (Design Base Earthquake) is encountere If the design earthquake is exceeded, Units 1, 2 and 3 are to be shut dow The 2G peak recording accelerometers are self contained devices requiring no external powe The device senses and records peak acceleration triaxially. The recording is scratched permanently on a metal plate which is both serialized and keyed to the recorde There is one 2G peak recording accelerometer in the Unit 1 tendon gallery and five 2G peak recording accelerometers located at various locations in the reactor building. Deviation 269/86-20-02 was generated because five of these instruments were out of servic Two. of the instruments have been replaced, four other instruments in the Unit 1 reactor building will be replaced during the next outage for unit Procedures for monitoring of seismic instrumentation examined during this inspection are:

-

IP/1/B/125/1 -

Strong motion accelerograph verification monthly

-

IP/1/B/125/2A

-

2G peak recording accelerometer model PRA-400, calibration, quarterly

-

IP/0/B/125/3 -

Seismic trigger annual calibration

-

IP/11/B/125/4 -

Strong motion functional test, semi-annually

Review of records showed that surveillance tests required by these procedures were done on the following dates:

IP/1/B/125/01, September 30 to October 1, 1987 IP/1/B/125/2A, October 2, 1987 IP/O/B/125/3, September 30 to October 2, 1987 IP/1/B/125/4, September 18, 1987 Based on visual examination of seismic monitoring equipment, discussions of equipment operation and replacement of equipment with responsible engineers, and review of procedures and records for surveillance of seismic monitoring equipment, the inspector concluded that proper corrective measures were being taken to correct this deviation and that existing seismic monitoring equipment meets FSAR requirement This item remains open until the four 2G peak recording accelerometers are installed in the Unit 1 reactor buildin.

Fire Protection/Prevention Program (64703) Fire Prevention/Administrative Control Procedures The inspector reviewed the following Fire Prevention/Administrative Procedure Procedure N Title Date SD 4. Control of Combustible Materials 7/31/86 SD 4. Fire Brigade Organization and Training 12/1/84 SD 4. Reporting of Fire Protection 8/20/87 Impairment SD 4. Welding and Burning Safety Directive 12/1/84 SD 4. Housekeeping Responsibilities 10/3/87 SD 4. Cleanliness in Safety-Related Areas 12/1/84 SD 4. Waste Oil Management Program 10/24/86 SD 4. Chemistry Approved Chemicals 12/1/84 Based on this review, it appears that the above procedures meet the intent of the NRC guidelines in the document entitled "Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance",

of June 1977 and the licensee's commitments in the letter dated January 16, 197 b. Fire Protection Surveillance Procedures The inspector reviewed the following fire protection system surveillance procedures:

Procedure N Title PT/OA/250/10A Fire Protection System Monthly Check, 9/13/86 PT/OA/250/10B Fire Protection System Annual Check, 7/21/87 PT/O/B/250/26 Turbine Building Sprinkler System Annual Test, 1/4/85 PT/O/B/250/29 Visual Inspection of Turbine Building to Auxiliary Building Fire Doors, Daily Inspection, 5/23/86 PT/O/B/250/30 Monthly Fire Brigade Equipment Inspection, 10/9/87 MP/1/A/1705/3A Fire Protection Fire Hose Hydrostatic Pressure Test, Every Three Years, 10/9/85 MP/O/A/1705/13 Fire Protection Equipment Inspection Monthly, 7/25/86 MP/0/A/1705/26 Fire Protection Fire Hose Hydrostatic Test, Every Year or Refueling Outage, 12/10/85 MP/0/B/1705/22 Fire Protection Fire Hydrants and Post Indication Valves, Semi-Annual Inspection, 1/6/87 MP/1/A/1705/01 Fire Protection Equipment Monthly Inspection, 7/21/87 MP/1/A/1705/18 Fire Protection Penetration Fire Barriers, Six Month Inspection, 10/30/85 MP/1/A/1705/19 Fire Protection Fire Rated Doors, Bi-Monthly Inspection, 5/20/85 The above surveillance procedures were reviewed to determine if the various test outlines and inspection instructions adequately implement the surveillance requirements of the plant's Fire Protection Technical Specifications. In addition, these procedures were reviewed to determine if the inspection and test instructions

followed general industry fire protection practices, NRC fire protection guidelines and the guidelines of the National Fire Protection Association (NFPA) Fire Code Based on this review, it appears that the above procedures are satisfactor c. Fire Protection Systems Surveillance Inspections and Tests The inspector reviewed the following surveillance inspections and test records for the dates indicated:

PT/OA/250/10A Fire Protection System Monthly Check, July, August, September 1987 PT/OA/250/10B Fire Protection System Annual Check to Verify the Proper Operation of the Fire Suppression Systems for Safety-Related Equipment, September 9-12, 1987 PT/O/A/0250/24 Fire Protection Three-Year Flow Test, June 26, 1986 through July 8, 1986 PT/O/A/0250/25 Fire Protection Annual Flow Test to Verify Acceptable Flow of HPSW Water Pumps, April 2, 1987 PT/O/B/0250/26 Turbine Building Sprinkler System Annual Test, April 14, 1987 PT/O/A/250/29 Visual Inspection of Turbine Building to Auxiliary Building Fire Doors, Daily, September 16-30, 1987 PT/O/B/250/30 Monthly Fire Brigade Equipment Inspection, September 28 and 29, 1987 MP/1/A/1705/18 Fire Protection Penetration Fire Barriers, Six Month Inspection, July 21, 1987 MP/O/B/1705/22 Fire Protection Fire Hydrants and Post Valves, Semi-Annual Test, April 30, 1987 MP/1/A/1705/01 Fire Protection Equipment Inspection Monthly, August, September, October 1987 MP/1/A/1705/19 Fire Protection Fire Rated Doors Bi-Monthly, October 1987 MP/O/A/200/59 Keowee Hydro Periodic Test of CO2 System Generator No. 1, June 1987

MP/O/A.2000/60 Keowee Hydro Periodic Test of CO2 System Generator No. 2, June 1987 The surveillance test record data and testing frequency associated with the above fire protection system surveillance test inspections were found to be satisfactory with regard to meeting the requirements of the plant's Fire Protection Technical Specification d. Fire Protection Audits The most recent audit reports of the Oconee Fire Protection Program were reviewed. These audits were: (1) fire protection annual audit number NR-86-26 (ON),

audit dates May 12 to June 6, 1986; and (2) fire protection triennial audit number NP-87-28 (ON), audit dates May 11 to June 26, 198 These audits identified several fire protection program discrepancies and unresolved items, and recommended several program improvement The licensee appeared to have taken the appropriate corrective action on the audit finding The items have either been corrected or a scheduled date for completion of the corrective actions has been establishe e. Fire Brigade (1) Organization The fire brigade is composed of approximately 144 personnel from the operation group. The brigade leader is normally one of the assistant Chief Supervisors and the brigade members are composed of nuclear equipment operator Sufficient personnel are assigned to each shift to meet the minimum operating staffing requirements of the Technical Specifications including five personnel for fire brigade dutie The inspector reviewed the shift assignment effective October 1, 1987, and verified that sufficient manpower to meet these requirements were assigned to each shif (2) Training The inspector reviewed the training and drill records for all brigade leaders and brigade members for the 1986 and 1987 calendar yea The records reviewed indicated that each of these leaders and members had received an annual medical review, attended the required training and participated in the required number of drill The inspector also verified that a fire brigade drill had been conducted each quarter of 1986 and 198 The fire brigade training records were found satisfactor In addition, the inspector reviewed the licensee's initial fire brigade training to verify the following topics are being covere Indoctrination of plant fire fighting plan with specific identification of each individual's responsibilitie Identification of the type and location of fire hazards and associated types of fires that could occur in the plan The toxic and corrosive characteristics of expected products of combustio Identification of the location of fire fighting equipment for each fire area and familiarization with the layout of the plant including access and egress routes to each are The proper use of available fire fighting equipment and the correct methods of fighting each type of fir The proper use of communication, lighting, ventilation and emergency breathing equipmen The proper method for fighting fires inside buildings and confined space Based on this review, the inspector concluded that the licensee's initial fire brigade training program covers the above training topic In addition, it appears that the licensee's fire brigade training program repeats the basic fire fighting skills of the initial progra (3) Fire Brigade Fire Fighting Strategies The inspector reviewed the following plant fire fighting strategies (pre-fire plans):

Plan No. 1 Unit 1 Control Battery Room, Auxiliary Building Room 400, Level 4 Plan No. 2 Unit 2 Control Battery Room, Auxiliary Building Room 408, Level 4 Plan No. 3 Unit 3 Control Battery Room, Auxiliary Building 458, Level 4 Plan No. 4 Unit 1 & 2 Power Battery Room, Turbine Building, Level 3 Plan No. 6 Blockhouse, Units 1 & 2 Turbine Building Level 3

Plan No. 8 Unit 1 Cable Spreading Room, Auxiliary Building Room 403, Level 4 Plan No. 9 Unit 2 Cable Spreading Room, Auxiliary Building Room 404, Level 4 Plan No. 11 Units 1 and 2 Control Room Plan No. 13 Electrical Supplies, Units 1 & 2 Plan No. 15 Unit 1 -

Turbine Driven Emergency Feedwater Pump Plan No. 20 Unit 1 Equipment Room Plan No. 26 Turbine Building Pasement, HPSW Jockey Pump Plan No. 37 Pressurizer Heaters 796 Elevation of Reactor Building 1, 2, and Plan No. 39 Fire In Reactor %ilding Plan No. 40 SSF -

Pump Room Plan No. 41 Unit 1 & 2 Switchgear Plan No. 45 Transformer CT-1 Plan No. 51 Radwaste Facility Based on this review, the inspector determined that the above fire fighting strategies adequately addressed the fire hazards in the area, the type of extinguishers to be utilized, the direction of attack, systems in the room/area to be managed in order to reduce fire damage, heat sensitive equipment in the room/area, and specific fire brigade duties with regard to smoke control and salvag (4) Fire Brigade Drill Puring this inspection, the inspector witnessed an unannounced fire brigade dril The drill scenario involved a petroleum ether spill and ignition in the chemical storage area of Warehouse Twelve brigade members responded to the pending fir The brigade assembled outside the warehouse in full protection fire-fighting turnout clothing and self-contained breathing apparatu An initial size-up of the fire condition was made by

the fire brigade captain and strategies were decided by the fire brigade leaders and manpower was deployed for equipment placement. A decision was made by command to enter the building with one fire brigade leader and two fire brigade members with a 1 -inch hose line for protectio Security was at the scene with a key for fire brigade entr Entry into the building was made from the southeast en They encountered light smoke and no hea The team reached the chemical storage area door and checked it for hea No heat was encountered at the doo Additional hose was pulled from a reel at the doo This was used for further entry into the chemical storage area. The fire brigade leader determined that the only fire was a few wooden pallets near the west wall of the buildin Additional backup hose was requested and provide The fire was extinguished in 33 minutes utilizing the water fire hos Mechanical ventilation was utilized to evacuate smoke from the are The fire brigade utilized proper manual fire fighting methods and reacted to the fire drill scenario in an effective and efficient manne f. Plant Tour and Inspection of Fire Protection Equipment (1) Inspection of Fire Brigade Manual Fire Fighting Equipment The inspector performed an inspection of the fire brigade equipment, consisting of fire hose, nozzles, tools and miscellaneous equipmen The equipment is stored on three trailers in the exterior area of the plant and on two tool carts adjacent to the control room A total of 17 sets of turnout gear (coats, helmets, boots, etc.)

and ten self-contained breathing apparatus are stored in equipment rooms adjacent to the control room Three portable foam carts are also availabl The brigade equipment appeared adequate, properly stored and satisfactorily maintaine (2) Permanent Plant Fire Protection Features A plant tour was made by the inspecto During the tour, the following safe shutdown related plant areas and their related fire protection features were inspected:

Units 1, 2, and 3 Control Room Unit 1 Control Battery Room Unit 2 Control Battery Room Unit 3 Control Battery Room Unit 1 and 2 Switchgear Room Unit 1, 2, and 3 Cable Shaft Unit 1, 2, and 3 Cable Spreading Room Turbine Building Basement, Electric and Jockey Fire Pumps Transformers CT-1, CT-2, CT-3, CT-5

The fire/smoke detection systems and manual fire fighting equipment for the above plant areas were inspected and verified to be in service. Based on this inspection, it appears that the fire protection features associated with the above plant areas are satisfactorily maintained. The plant tour also verified the licensee's implementation of the fire prevention administrative procedure The control of combustibles' and flammable materials, liquids and gases, and the general housekeeping were found to be acceptable in the areas inspecte Within the areas inspected, no violations or deviations were identified.