IR 05000269/1987030
| ML16161A921 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 12/04/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8712100246 | |
| Download: ML16161A921 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RiDS)
ACCESSION NBR:97i2100246 DOC.DATE: 87/12/04 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station, Unit 1, Duke Power C Oconee Nuclear Station, Unit 2, Duke Power C Oconee Nuclear Station, Unit 3, Duke Power C AUTH.NAME AUTHOR AFFILIATION HERDT Region 2. 01c o; the Director RECIP.NAME RECIPIENT AFFILIATION TUCKER, Duke Power C SUBJECT: Ack receipt of 871030 & 110q Itr informing NRC of steps taken to correct violations noted in Insp Repts 50-269/87-30,50-270/87-30
& 50-287/87-3 DISTRIBUTION CODE:
IEO1D COPIES RECEIVED:LTR I ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:AEOD/Ornstein:1c AEOD/Ornstein:1c AEOD/Ornstein:ic RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 PD I
PASTIS, H
INTERNAL: AEOD
DEDRO
NRR MORISSEAU,D
NRR/DLPG/PEB
NRR/DOEA DIR
NRR/DREP/EPB
NRR/DREP/RPE
NRR/DRIS DIR
NRR/PMAS/ILRD
1E=LEBERMANJ
OC /HDS2
E0 FILE
RES DEPY 01 i
RO-N FILE
1 EXTERNAL: LPDR i
NRC PDR
NOTES:
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
.0e
DEC 0 4 1987 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
REPORT NOS. 50-269/87-30, 50-270/87-30 AND 50-287/87-30 Thank you for your responses of October 30, 1987 and November 9, 1987, to our Notice of Violation issued on September 30, 1987, concerning activities conducted at your Oconee facility. We have evaluated your responses and found that meet they the requirements of 10 CFR 2.20 In your response you state that Oconee will be in full compliance when the FSAR is updated and the Unit 2 refueling outage is completed. Per discussions with Mr. P. Guill of your staff on November 30, 1987, the Unit 2 refueling outage will be completed before the FSAR is update Therefore, the date for full compliance will be when the FSAR revision is issued on July 1, 198 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
Sincerely,
.3NAL SQ6D b
.LAN R. HERDT Alan R. Herdt, Chief Engineering Branch Division of Reactor.Safety cc: M. S. Tuckman, Station Manager bcc: NRC Resident Inspector DRS Technical Assistant H. Pastis, NRR State of South Carolina RII RII RH MThomas:tm FJape TPeebles 12/ ;( /87 12/ /87 12/3 /87 8712100246 871204 PDR ADOCK 05000269 Q