IR 05000269/1987015
| ML16295A290 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/28/1987 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML16161A806 | List: |
| References | |
| NUDOCS 8705040295 | |
| Download: ML16295A290 (3) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8705040295 DOC.DATE:
7/01/28 NOTARIZED: NO DOCKET #
FACIL:50-269 Oconee Nuclear Station Unit 1, Duke Power C Oconee Nuclear Station. Unit 2, Duke Power C Oconee Nuclear Station. Unit 3, Duke Power C UTH.NAME AUTHOR AFFILIATION BROWNLEE, Region 2, Office of Director RECIP.NAME RECIPIENT AFFILIATION TUCKER Duke Power C SUBJECT:
Forwards partially withheld Safegaurds Insp Repts 50-269/87-15,50-270/87-15 & 50-287/87-15 on 870406-10 (ref 10CFR2.790 & 73.21).No violations or deviations note DISTRIBUTION CODE: IEO4D COPIES RECEIVED:LTR _
ENCL
_[ SIZE:
- /
TITLE: Safeguards Non-2.790 (50 DKT)-Insp Rept/Viol Response/Bulletin Respon NOTES:AEOD/Ornstein:1c AEOD/Ornstein:1c AEOD/Ornstein:1c RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-3 LA
0 FD2-3 PD
1 PASTISH
1 INTERNAL: AEOD/DOA
0 NRR/DRIS/SGB
1 B1 NRR/PMAS/ILRB
0
1
RCN2 FILE
1
EXTERNAL:
LPDR
1 NRC PDR
1 NSIC
1 NOTES:
TOTAL NUMBER OF COPIES REGUIRED:
LTTR
ENCL
13AFEGUARDSI Ffvl APR 2 8 198Y Docket Nos. 50-269, 50-270, 50-287 License Nos. DPR-38, DPR-47, DPR-55 Duke Power Company ATTN:
Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NOS. 50-269/87-15, 50-270/87-15 AND 50-287/87-15 This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by G. F. Gibson on April 6-10, 198 The inspection included a review of activities authorized for your Oconee facilit At the conclusion of the inspection, the findings were discussed with those members of your staff identified in the enclosed inspection repor Areas examined during the inspection are identified in the repor Within
.
these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observation of activities in progres Within the scope of the inspection, no violations or deviations were identifie In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in the NRC Public Document Roo Should you have any questions concerning this letter, please contact u
Sincerely, 8705040295 870428 PDR ADOCK 05000269
PDR Virgil L. Brownlee, Acting Deputy Director Division of Reactor Projects Enclosure:
(See page 2) oAZPVA ~roZ
SAFEGUARDS INFORM'
Duke Power Company
Enclosure:
NRC Inspection Report (Safeguards Information)
cc w/encl:
M. S. Tuckman, Station Manager bcc w/encl:
NRR/DRIS/SB bcc w/Inspection Summary:
NRC Resident Inspector Document Control Desk (RIDS IE04), 016 State of South Carolina RIH IR RH RII GFGibson:1b 2 cGuire W ine-reeb I es 04 1:7 87 94/) Y87 04/I/87 04/2:r/87 NLS"CTAs SAFEGUARDS~b
'
4^l(^RMAmpol UPON SEPARATON TIS SAFEGUARDS IN FORMATI-g Is DECONTROLLED.