IR 05000269/1987036
| ML16161A891 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 10/05/1987 |
| From: | Masnyk O, Mcguire D, Tobin W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML16161A890 | List: |
| References | |
| 50-269-87-36, 50-270-87-36, 50-287-87-36, NUDOCS 8710140193 | |
| Download: ML16161A891 (1) | |
Text
REGQ
~SAFEGUARDS trW"rn 1 1%0
- J I4 UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA STREET, ATLANTA, GEORGIA 30323 OCT 07 1987 Report Nos.:
50-269/87-36, 50-270/87-36, and 50-287/87-36 Licensee:
Dyke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, License Nos.: DPR-38, DPR-47, and and 50-287 DPR-55 Facility Name:
Oconee 1, 2, and 3 Inspection Condu ted:
August 31 -
Sep cember 4, 1987 Inspectors:
_ _
1___ __ __
1/
Orysia asnyk hysical S urity Specialist Date Signed William J. obin, Physic Security Inspector Date Signed Approved by:
/
5Y D. R. McGuire, Chief, Physical Security Section te igned Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, unannounced physical security inspection involved a review of the following areas:
Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers -
Protected and Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control of Personnel, Packages, and Vehicles; Detection Aids -
Protected and Vital Areas; Alarm Stations; Communications; Personnel Training and Qualification Program; and Safeguards Contingency Plan Implementatio Results:
No violations of regulatory requirements were identifie.
PDR ADOCK 05000269 S
GSPDRAFGURD IFOIVATO SAFEGUARDS INFORI*ATION,