IR 05000155/2020001
| ML20307A389 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 11/02/2020 |
| From: | Dave Hills Division of Nuclear Materials Safety III |
| To: | Corbin D Entergy Nuclear Operations |
| Dalzell-Bishop J | |
| References | |
| IR 2020001 | |
| Download: ML20307A389 (11) | |
Text
November 2, 2020
SUBJECT:
NRC INSPECTION REPORT 07200043/2020001(DNMS) AND 05000155/2020001(DNMS) - BIG ROCK POINT INDEPENDENT SPENT FUEL STORAGE INSTALLATION
Dear Mr. Corbin:
On October 8, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed inspection activities at the Big Rock Point Independent Spent Fuel Storage Installation (ISFSI). The purpose of the inspection was to evaluate whether the facility was operating in accordance with the NRC approved Part 72 Certificate of Compliance and the Part 50 license conditions. At the conclusion of the inspection, the results were discussed with Mr. Dale Lucy and other members of your staff during an exit meeting on October 8, 2020.
The inspection consisted of reviews and evaluations related to radiation protection, surveillance and maintenance activities, environmental monitoring, quality assurance, and emergency preparedness. Specific areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures, representative records, and interviews with personnel.
Based on the results of this inspection, the inspectors did not identify any violations of NRC requirements.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection. If you have questions, please contact Ms. Jennifer Dalzell of my staff at (630) 829-9607.
Sincerely, Digitally signed by David E. Hills Date: 2020.11.02 10:30:52 -06'00'
David E. Hills, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety
Docket Nos. 07200043; 05000155 License No. DPR-6
Enclosure:
IR Nos. 07200043/2020001(DNMS);
cc w/encl: Distribution via ListServ for Palisades Big Rock Point Service List David E. Hills