Monthly Operating Repts for Nov 1995 for Brunswick Steam Electric Plant
ML20095F412
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 11/30/1995
From: Harrison F, Lopriore R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-95-0634, BSEP-95-634, NUDOCS 9512190008
Download: ML20095F412 (10)


Text

. . - _ . . . . - - . . . _ - _ - . - - - - .- - - - . . . - - . . . - - - . . - - . -

CP&L summmmmmmmma Carolina Power & Light Company P. O. Box 10429 Southport, NC- 28401-0429 DEC 151995 FILE: B09-13510C SERIAL: BSEP/95-0634 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

, BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62

, MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.11 for the Brunswick Nuclear Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics i and shutdown experience for the month of November 1995.

If you have any questions regarding this report, please contact Ms. Frances Harrison at (910) 457-2756.

Very truly yours, R. LoprioFe[ ~

Plant Manager Brunswick Nuclear Plant FH/mcg MSC/93-8524 1

Enclosures cc: Mr. S. D. Ebneter, Regional Administrator, Region 11 Mr. C, A. Patterson, NRC Senior Resident Inspector - Brunswick Mr. D. C. Trimble, NRR Project Manager - Brunswick The Honorable H. Wells, Chairman - North Carolina Utilities Commission 1C0001 9512190008 951130 a PDR R

ADOCK 05000324 PDR

/v 3 g

ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 DOCKET NOS. 50-325 & 50 324 LICENSE NOS. DPR-71 & DPR 62 PLANT PERFORMANCE DATA SYSTEM l OPERATING DATA REPORT 1

i i

l i

)

l I

E1-2 I

CP&L Cb PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/07/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME, 13:23:23 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 I COMPLETED BY FRANCES HARRISON l TELEPHONE (910)457-2756 NOVEMBER 1995 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) l 1 802 17 804 3 801 18 804 i I

3 800 19 803 4 801 20 803 5 803 21 761 6 804 22 804 7 803 23 804 8 802 24 804 9 803 25 803 10 709 26 805 11 737 27 805 12 803 28 804 13 804 29 804 14 804 30 804 15 805 16 803 1.16 - 8 l

l r

l-i CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/07/95 OPERATING DATA REPORT RPD36-000 RUN TIME, 13:23:24 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 a

COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES a
2. REPORTING PERIOD: NOVEMBER 95
3. LICENSED THERMAL POWER (MWT): 2436-
4. NAMEPLATE RATING (GROSS MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 791.0 7 MAX DEPENDABLE CAPACITY (NET MWE): 767.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:

1

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE I

11. HOURS IN REPORTING PERIOD 720 00 8016.00 .163968.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 6777.42 102648.74
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10 l
14. HOURS GENERATOR ON LINE 720.00 6650.18 98607.17
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1739023.37 16011161.51 217546888.40
17. GROSS ELEC. ENERGY GEN. (MWH) 588655.00 5333735.00 71493460.00
18. NET ELEC. ENERGY GENERATED (MWH) 573425.00 5179316.00 68778355.00 l
19. UNIT SERVICE FACTOR 100.00 82.96 60.14 .)
20. UNIT AVAILABILITY FACTOR 100.00 82.96 60,14 l

. 21. UNIT CAP. FACTOR (USING MDC NET) 103.84 84.24 53.51 i

22. UNIT CAP. FACTOR (USING DER NET) 97.01 78.70 51.09 l
23. UNIT FORCED OUTAGE RATE .00 2.27 14.19 ,

i 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

l i

i l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: i 1
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY i INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 -

9

CP&L Cb PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE 12/07/95 APPENDIX B -

AVERAGE DAILY POWER LEVEL RPD39-000 RU;4 TIME,13:23:23 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 NOVSMBER 1995 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 668 17 656 2 666 18 652 3 663 19 652 4 596 20 648 5 686 21 643 6 e~9 22 641 7 677 23 639 8 674 24 636 9 671 25 629 10 677 26 627 11 672 27 626 12 668 28 623 13 667 29 621 14 664 30 619 15 662 1

16 659  !

1.16 - 8 I 1

l l

- - , . . ~ . . ~ . . - _ _ . . - . - _ . . - - . . . . - . - . . . . - - - _ . . . - . - - - . ~ . . . . . . . - -

i .

1 CP&L CO . PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE. 12/07/95 OPERATING DATA REPORT RPD36-000 RUN TIME, 13:23:24 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 -

COMPLETED BY FRANCES HARRISON

. OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 NOTES
2. REPORTING PERIOD: NOVEMBER 95

'3. LICENSED. THERMAL POWER (MWT) : 2436

4. NAMEPLATE-RATING (GROSS .MWE) : 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0 l 6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE) : 754.0 -------------------------------

, 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, j GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY: l 1

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 720.00 8016.00 175992.00 12.' NUMBER OF HOURS REACTOR CRITICAL

~

720.00 8016.00 112571.70

13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 8016.00 107133.71
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1501115.82 18628840.35 230879176.85
17. GROSS ELEC. ENERGY GEN. (MWH) 487175.00 5996160.00 74645781.00 4
18. NET ELEC. ENERGY GENERATED (MWH) 469465.00 5809152.00 71642411.00-
19. UNIT SERVICE FACTOR 100.00 100.00 60.87 2 20. UNIT AVAILABILITY FACTOR 100.00 100.00 60.87 ,
21. UNIT CAP. FACTOR (USING MDC NET) 86.48 96,11 52.11 l
22. UNIT CAP. FACTOR (USING DER NET) 79.42 88.27 49.58 I
33. UNIT FORCED OUTAGE RATE .00 .00 11.27
34. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i i

35. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

'26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- -------- j INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

t 1.16 - 9

. . . - - -- - .., . --- - ,_, .- . . . . . ~ _ . . - , - . - -

l

! ENCLOSURE 2 I BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 l DOCKET NOS. 50-325 & 50-324 l LICENSE NOS. DPR-71 & DPR 62 UNIT SHUTDOWN AND POWER REDUCTION REPORT - NOVEMBER 1995 t

l l

l 1

l l

El-3

l  ?

L l' -

l l' .

DOCKET NO. 050-0325 '

i UNIT NAME Brunswick I DATE December 1995

,' COMPLETED BY Frances Harrison [

i TELEPHONE 910-457-2766 t UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH November 1995 l 't r

METHOD OF LICENSEE [

DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO i j NO. DATE TYPE (1) (HOURS) REASON (2) -REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE j 1 i

!95-048 951110 S 00 B 5 NA RB CONROD Downpower to 60% for red l 1 improvement ard deep shallcw j rod exchance. [

95-049 951121 F 00 A 5 NA H8 VALVEXX Dowrpower to 60% for steam leak repair of .

i 1-MD-LV-2SRDCV-C-1 i 1: Type 2: Reason 3: Method 4: System Coder 5. Comoonent Code  !

F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for ,

S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data '

j B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER l C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983. ,

restriction 6- Other per NUREG-1022. per NUREG-1022. '

j E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c

, License Examination F- Administrative G- Operational error  :

(explain) ,

H- Other (explain) i t

1 i

t i

i i

l r

-._ . _ _ -_ m _ _ _ .. - ..-. _ . _ . _ . -... - . _ . _ - - _ -- _ - _ .~ _. . -- - - _ _.-m _ m _ _ ._.._...m.---m.. . .

)

  • i i

. L t

1 DOCKET NO. 050 03?4 '

UNIT NAME Brunswick Il DATE December 1995 COMPLETED BY frances Harrison TELEPHONE 910-457-27 %

i UNIT SHUTDOWNS AND POWER REDUCTIONS  ;

REPORT MONTH November 1995 METHOD OF' LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION TO l

NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE t

% -052 950827 S In H 5 N/A RC ZZ Core Coastdown. i j

progress  ;

t I

1: Tvoe 2: Reason 3: Method 4: System Code: 5. Component Code

F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for i S - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data i B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER  !

I C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1933.  ;

restriction 6- Other per NUREG-1022. per NUPIG-1022.

! E- Operator Training & Section VI. Item 13.b 5xtion VI. Item 13.c  :

License Examination j F- Administrative 1 G- Operational error s (explain) [

i H- Other (explain) j 1

I

. i i  !

i

i. t

, I i

j I i I

i i

I

i I

?

5 I

ENCLOSURE 3 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Carolina Power &

Light Company in this document. Any other actions discussed in the submittal represent intended or planned actions by Carolina Power & Light Company. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager - Regulatory Affairs at the Brunswick Nuclear Plant of any questions regarding this document or any associated regulatory commitments.

Commitment Committed i date or I outage l

1. None l

E 2-1