BECO-LTR-96-014, Forwards Rev 11C to Pilgrim Nuclear Power Station PNS Colr

From kanterella
(Redirected from BECO-LTR-96-014)
Jump to navigation Jump to search
Forwards Rev 11C to Pilgrim Nuclear Power Station PNS Colr
ML20106G481
Person / Time
Site: Pilgrim
Issue date: 02/27/1996
From: Boulette E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20106G485 List:
References
BECO-LTR-96-014, BECO-LTR-96-14, NUDOCS 9603050197
Download: ML20106G481 (1)


Text

m-

., ,e l

Boeton Edlieon Pilgnm Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 l

i d

E. T. Boulette, PhD Senior Vice President - Nuclear February 27, 1996 BECo Ltr. #96-014

U.S. Nuclear Regulatory Commission Attention
Document Control Desk Washington, DC 20555 l

l Docket No. 50-293 I 3 cense No. DPR-35 Core Operatina Limits Reports j- The attached revision of Pilgrim's Core Operating Limits Report is submitted in accordance with 1 the requirements of Pilgrim's Technical Specification 6.9.A.4.d.

Revision #11C provides cycle-specific limits for operating Pilgrim during the remainder of cycle

  1. 11, and reflects Technical Specification Amendment #165 issued by the NRC on January 23,
1996.

CMwt2Nc-E. T. Boulette, PhD 1

ETB\PMK\pkk\ rap 96icorelmit

Attachment:

Pilgnm Nuclear Power Station Core Operating Limits Report 4

cc: Mr. R. Eaton, Project Manager l Division of Reactor Projects - 1/11 Mail Stop.14D1 U. S. Nuclear Regulatory Commission i 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nucl2ar Regulatory Commission Region i 475 AINndale Road King of Prussia, PA 19406 Senior Resident inspector Pilgnm Nuclear Power Station 9603050197 960227 PDR A!Yl.0K 05000293 '

hk V

P PDH \

L