m-

,e Boeton Edlieon Pilgnm Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 i

E. T. Boulette, PhD d

Senior Vice President - Nuclear February 27, 1996 BECo Ltr. #96-014 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 I

3 cense No. DPR-35 Core Operatina Limits Reports j-The attached revision of Pilgrim's Core Operating Limits Report is submitted in accordance with the requirements of Pilgrim's Technical Specification 6.9.A.4.d.

Revision #11C provides cycle-specific limits for operating Pilgrim during the remainder of cycle

  1. 11, and reflects Technical Specification Amendment #165 issued by the NRC on January 23, 1996.

CMwt2Nc-E. T. Boulette, PhD 1

ETB\\PMK\\pkk\\ rap 96icorelmit

Attachment:

Pilgnm Nuclear Power Station Core Operating Limits Report cc:

Mr. R. Eaton, Project Manager 4

Division of Reactor Projects - 1/11 Mail Stop.14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nucl2ar Regulatory Commission Region i 475 AINndale Road King of Prussia, PA 19406 Senior Resident inspector Pilgnm Nuclear Power Station hk '

9603050197 960227 PDR A!Yl.0K 05000293

' V P

PDH

\\

L

. -