BECO-LTR-96-014, Forwards Rev 11C to Pilgrim Nuclear Power Station PNS Colr
| ML20106G481 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 02/27/1996 |
| From: | Boulette E BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20106G485 | List: |
| References | |
| BECO-LTR-96-014, BECO-LTR-96-14, NUDOCS 9603050197 | |
| Download: ML20106G481 (1) | |
Text
m-
,e Boeton Edlieon Pilgnm Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 i
E. T. Boulette, PhD d
Senior Vice President - Nuclear February 27, 1996 BECo Ltr. #96-014 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 I
3 cense No. DPR-35 Core Operatina Limits Reports j-The attached revision of Pilgrim's Core Operating Limits Report is submitted in accordance with the requirements of Pilgrim's Technical Specification 6.9.A.4.d.
Revision #11C provides cycle-specific limits for operating Pilgrim during the remainder of cycle
- 11, and reflects Technical Specification Amendment #165 issued by the NRC on January 23, 1996.
CMwt2Nc-E. T. Boulette, PhD 1
ETB\\PMK\\pkk\\ rap 96icorelmit
Attachment:
Pilgnm Nuclear Power Station Core Operating Limits Report cc:
Mr. R. Eaton, Project Manager 4
Division of Reactor Projects - 1/11 Mail Stop.14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nucl2ar Regulatory Commission Region i 475 AINndale Road King of Prussia, PA 19406 Senior Resident inspector Pilgnm Nuclear Power Station hk '
9603050197 960227 PDR A!Yl.0K 05000293
' V P
PDH
\\
L
. -