BECO-91-098, Forwards Rev 9A to Pilgrim Nuclear Power Station Core Operating Limits Rept (Cycle 9)

From kanterella
Jump to navigation Jump to search
Forwards Rev 9A to Pilgrim Nuclear Power Station Core Operating Limits Rept (Cycle 9)
ML20077J837
Person / Time
Site: Pilgrim
Issue date: 07/30/1991
From: Wagner E
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20077J839 List:
References
BECO-91-098, BECO-91-98, NUDOCS 9108050169
Download: ML20077J837 (1)


Text

Technical Specification 6.9.A.4.d

i$

'o

  • DOSTON EDISON 2b tunintree Hm othee h4 Draintf ee, Ma$5achustytts 02184 July 30. 1991 Mv7, ,*C BECo 91- o98 NWeaf (ngineeong U.S. Nuclear Regulatory Commission Document Control Desk Hashington, DC 20555 License DPR-35 Docket 50-293 Submittal of Core Qpattting_LimitLRepar_t In accordance with Pilgrim Nuclear Power Station Technical Specification 6.9.A.4.d. Boston Edison Company submits the attached Core Operating Limits Report, Revision 9A for your information. This report provides the cycle-specific limits for operation of the Pilgrim Nuclear Power Station during Cycle 9.

- ' J'

( j & s, w-t' E. J.'Hagn'er~'

DMV/cic/6049

Attachment:

Pilgrim Nuclear Power Station Core Operating Limits Report, Revision 9A cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Hall Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 l

U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station l

\

ghR*3MIT: anne OI ,