Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARRBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee RBG-44204, LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card1997-09-11011 September 1997 LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card RBG-44187, LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended1997-08-28028 August 1997 LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended 05000458/LER-1993-0161993-08-27027 August 1993 LER 93-016-00:on 930727,HPCS Sys Actuation Occurred Due to Improperly Prepared Rev to Surveillance Test Procedure. Changed Surveillance Procedure STP-051-4811.W/930827 Ltr 05000458/LER-1993-0121993-08-26026 August 1993 LER 93-012-01:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Inattention to Detail During Initial Procedure.Surveillance Test Procedures revised.W/930826 Ltr 05000458/LER-1993-0151993-08-23023 August 1993 LER 93-015-00:on 930723,discovered Time Response Testing of Isolation Instrumentation for RWCU & RCIC Sys Not Performed at Intervals Required by Tss.Caused by Scheduling Error & Misinterpretation of Ts.Schedule revised.W/930824 Ltr 05000458/LER-1993-0101993-08-16016 August 1993 LER 93-010-01:on 930514,SDC Loss for Three Minutes When SDC Suction Valves Closed.Caused by Failure to Identify Need for Compensatory Measures.Revised Procedural Guidance Clarifying Valve isolation.W/930816 Ltr 05000458/LER-1990-0221990-06-18018 June 1990 LER 90-022-00:on 900518,HPCS Sys Declared Inoperable & 14-day Shutdown Limiting Condition for Operation Entered Due to Inoperative Suppression Pool Level Transmitter.Caused by Personnel Error.Reactor Operators trained.W/900618 Ltr 05000458/LER-1987-001, Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued1987-02-0909 February 1987 Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued 05000458/LER-1986-009, Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised1986-02-13013 February 1986 Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised 1998-11-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |
LER-2087-001, Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued |
Event date: |
|
---|
Report date: |
|
---|
4582087001R00 - NRC Website |
|
text
Pwe 3se u S. 8suCLEM4 atGuLAfony Comessmeces apreovg0 case aso 3130.gtes UCENSEE EVENT REPORT (LER) ""''2'**
.ACitafyesAasesu 00CEST iguessen (3) pass (3 RIVER BEND STATION ol5l0l0lol4l5l8 1loFl012 TITLE tae Missed Semple Collection Required by Technical Specifications Eveeff DATE18 LesssW WERte meroRT DATE 171 ofweR FACILITIES IHvolyso 33
- M n M esoNTM OAV VEAR veAA li: . esoseTM OAV vtAR FACILITY maues DoCEst esuaseenien l 015logogo; ; l
~ -
0 l1 0l7 8 7 8l 7 0l0l1 0l0 0 l2 0l9 8l7 o is os go g o, i l
,,,,,,,,,, Tms aspon? = sunserre0 PuasuAss? To TMe neouiasmeNTe op is CPn ( ,ca e . - ., sw ,ou
"**** 1 so.aeems as.aeew es.rswunm ra.ruw g _
so.aset.wim esmwm es.rswmm Tuiw
- n. 1 i0i0 as asse.una anwm es.7:wan.e
_ Tweng, ,g se.aeewn nes y es.rswano es.72 H3H eHA) MeAJ
. ,. . nuim a rm.mn., .. u n.,
Es. ament (1)M es.731sH3HW1 es.73W(2Hal LICeases Co887ACT FOR TMas LeR ttal NAME TELEPMcNg Nuestm AmtA Coot E.R. Grant - Director-Nuclear Licensing 5 [0 i4 6l3g5; ;6;9;9l5 Comptafe osee LINE Poe EACM CompoNearf pAsLUAE OGeCRete0 IN TMS Repon71931 CAust system ConaPONENT
"' A ue C. Rt y Ayg Le CAUSe Sv f7EM COMPONENT "^y g" hey' N.[
l l I I I I I I I I I I I I I l l l i I I l I f I I I l suPPLeaseNTAL Aeroa? Expect 50 Ital woNTM Day 'vtan
.u ...o M
] vis u, exprCreo suen,ssion oA rrJ T No l l l A.ET.Act,- ., - ... v,,, , - , ,n.
During_the Chemistry Department's routine inspection of plant radiation monitors, it was discovered at 0820 on 1/8/87, with the unit in full power operation, that the Main Flant Exhaust radiation monitor (RMS-RE125) particulate and iodine sampler was isolated. At 1220 on 1/8/87 it was discovered that the Fuel Building Exhaust radiation monitor (RMS-RESA) particulate and iodine sampler was also isolated.
Per Technical Specification Table 3.3.7.11-1 items 2.b and 2.c, the requirement to continuously monitor the exhaust ventilation systems for particulate and iodine activity was not met within the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> allowed by the Action Statement. Upon discovery, the sample flows l were immediately restored to the sampler. Investigation determined that the root cause was due to the operator failing to notify the Chemistry Department prior to changing the sample alignments.
Safe operation'of the plant and the health and safety of the public were not affected as a result of this event. During the time the samples were not being collected there were no inadvertent releases to the environment. Additionally, there is no spent fuel stored in the Fuel Building at this time.
8703160153 870209 QN PDR ADOCK 05000458 (!
S PDR
e "
l maC Sete Jesa u 8 kuCLEm HGWL&TQJT COMMI5Sach LICENSEE EVENT REPORT (LER) TEXT CONTINUATION ue=ovie eve ~o vio-oio.
En*'RES S P es F ACILaty Naut sta DOCKET NUMetR 12) LER NuweEn 138 PAGE(36
"*" " t O. "'VJ:
RIVER BEND STATION o ls j o lo j o l4 l5 l8 8 (7 _
0 l0 ji _
nl0 0l2 or 0 l2 rtxt m .M . - - :=ac s asse. m n REPORTED CONDITION During the Chemistry Department's routine inspection of plant radiation monitors, it was discovered at 0820 on 1/8/87, with the unit in full power operation, that the Main Plant Exhaust radiation monitor .
(RMS-RE125) particulate and iodine sampler was isolated. At 1220 on !
1/8/87 it was discovered that the Fuel Building Exhaust radiation i monitor (RMS-RESA) particulate and iodine sampler was also isolated. i Per Technical Specification Table 3.3.7.11-1 items 2.b and 2.c, the I requirement to continuously monitor the exhaust ventilation systems for particulate and iodine activity was not met within the 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> allowed by the Action Statement. Upon discovery, the sample flows were immediately restored to the sampler.
A similar event of a missed sample due to improper sample lineup was reported in LER 86-046.
INVESTIGATION r i
i During the investigation of the event it was determined that on 1/7/87 j at 2055 the Main Plant Exhaust radiation monitor (RMS-RE125) was remotely realigned to clear a " Loss of Isokinetic Control" alarm to an alternate sample path such that the particulate and iodine sampler was inadvertently isolated. Later that day at 2300 the Fuel Building ,
Exhaust radiation monitor (RMS-RESA) was similarly remotely realigned to clear a " Loss of Process Flow" alarm. On each of these occasions the operator failed to notify the Chemistry Department of the sample alignment change. ;
CORRECTIVE ACTION Immediate action was taken to issue an " operator aid" which was attached to the front of each Digital Radiation Monitoring System (DRMS) monitor with a sample selection function switchable from the 1 Main Control Room. The operator aid states specific instructions for I
notifying the Chemistry Department prior to switching sample i alignment.
1 Additionally, a memorandum was issued by the Operations Supervisor to all Operations Section personnel noting the requirement to notify the Chemistry Department prior to changing sample alignments.
l l SAFETY ASSESSMENT l
There was no impact on the safe operation of the plant or to the I health and safety of the public. During the time that the samples
! were not collected for particulate and iodines there were no I
inadvertent releases to the environment. Additionally, there is no spent fuel stored in the Fuel Building at this time.
1 C Onw ma L
. * - Corrected Copy p
e GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFFICE BOX 220 ST FRANCISVILLE. LOUISIANA 70775 AAE A CODE 504 635-6094 346 8651 February 9, 1987 RBG- 2 5 3 2 0 File Nos. G9.5, G9.25.1.3 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sir:
River Bend Station - Unit 1 Docket No. 50-458 Please find enclosed Licensee Event Report No.87-001 for River Bend Station - Unit 1. This report is being submitted pursuant to 10CFR50.73.
Sincerely, (N( %^~
J. E. Booker Manager-River Bend Oversight River Bend Nuclear Group JEB/TFP/PDG/DAS/je cc: U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 INPO Records Center 1100 Circle 75 Parkway Atlanta, GA 30339-3064 NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775
.It