Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /622-7000 Mr. James P. O'Reilly Director of USNRC July 13, Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. O'Reilly:
LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE SUPPLEMENTAL REPORT 77-04/3L Pursuant to the requirement of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submit-ting a Supplemental Licensee Event Report for Reportable Occurrence 77-04/3L to correct the dates that Check-off Sheet 4.1 and Surveillance Action 4.1.2 were last performed.
Sincerely yours, Frank P. Librizzi General Manager -
Electric Production CC:
Director, Office of Inspection and Enforcement (30 Copies)
Director, Office of Managemerit Information and Program Control (3 Copies)
I 772021):32::::
SUPPLEMENTAL REPORT TO LER 77-04/3L LICENSEE EVENT REPOR'~
CONTROL 9L.OCK LICENSEE NAME 6
- LICENSE NUMBER LICENSE TYPE EVENT TYPE
@))!NI JI SIG IS 111
- Io IO 1-1 O I o I O I O I 01-1 O I OJ k 41 11 11 11 l:k It 00 I 111 9
14 15 2
~
REPORT REPORT CATEGORY TVl'E SOURCE COCKET NUMBE.R EVENT CATE REPORT CATE ram coN*l.RJQJ U:J l1!.1 1 o 1 s 1 o 1 -1 o 1 2 1 11 21 1o.111 o 1 s 1 1 1 1 1 1 o 1 2 1 2 1 2 1 1 1 7J r-"'""1 57 58 59 60 6 t 6a 69 74 75 EVENT OESCRIPTICN
@:§]!Following a reactor trip caused by low levels in two of the four steam 7
8 g
@ill erators, 1113 Auxiliary Feedwater Pump failed to start as required. ffll 7
8*9
[§)) did start and were available throughout this occurrence. Corrective Actio 7
8 [fil§J1for this occurrence has been to initiate usage of Check Off Sheet 4.1,Revt 7
8 9
~13 of OI I-3.3.
Item 5.9.2 requires verification that the Aux Feedwater 7
8 9 SYSTEM COOE (ill]tC!HI 7
8 g 10
CAUSE
COCE L!:J
\\1 CAUSE OESCRIPTTON COMPONENT cooe:
IZ 1z1z I ZI~
12 t7 PRIME COMPONENT SUPPLIER
~
43 COMPONENT MANUFACTURER I Z 19 I 91 91 44 47 VIOLATION
!BJ 48 80 I
80 l : l IJhe cause of this occurrence was personnel error in not identifying the J I Anxi ]j ary Feed Pump Turbine was man11al ly tripped.
A test was run simnl adng 7
89 80 ITifil I low level in two of the. four steam generators and /!13 Aux Feed Pump contribls 1
a 9 so FACILITY STATUS ITlil LBJ.
1 a
9 F'ORMOF
"'-POWER l,Q_J_3.LO.J 10 12 METHOO OF OTHER STATUS OISCOVE.RV l~___..N~/~A,__~~I Lgj 13 44 45 ACTIVITY CONTENT REl..EASEO OF RELEASE AMOUNT OF ACTIVITY GE L.£J
~ I N/A 1
s 9
to 11 PERSONNEL EXPOSURES OISCOVERV OESC:.RIPTION N/A ao r.r.;"]
NUMBER TVPE CESCRIPTION l..!..l:!JIOIOIOI 1ZJ
'~---~----N~/~A---~~~~~~~~~~~~~~~-,,,,!J 1
s 9 11 12 13 so PERSONNEL. INJURIES r.r7l NUMBER OESC.RIPTION L!.1:..11010101
'=-~~~~_,;,.,N~A~~~~~~~~~~~~~~----~~~
7 8 9 11 12 so OFFSITE CONSEQUENCES
~19 N/A LOSS OR OAMAGE TO FACILITY TV~
CESCRIPTION GliJ I Z I I N/A J
1 a~ ~10--------------------...::.;:.L...::.::...----------------__,.;.------------------------------!iSd
. PUBLICITY Glil 1
a~9 ______________________ _..._......,...,,."------------------------------------------------__,ao AOOITIONAL. FACTORS QEI I SUPPLEMENTAL REPORT TO 77-04/31 I
1 8~9----------------------------------------------~----------------------------....,,ao~
o::liJ!EVENT & CAUSE DESCRIPTIONS (Continued on Page 2) 7 8 ~
I a>
NAME: __________ ~A~*;,,,,..;\\~i~*~K-~ __
a~r~p_l_e ______________ __
PHONE: (609) 365-7000 Ext.Salem-62~
I SORC Review Mtg. No. 22-77
e 1
- **Licensed Event Report 77-04/31 Supplemental Report Page 2 EVENT DESCRIPTION (Continued)
System controls are adjusted to conform to the standby conditions specified in OI II-10.3.1.
CAUSE DESCRIPTION (Continued) functioned correctly with the pump starting as required.
Check Off She'et 4.1 of OI III-10.3.1 verifies the Aux. Feedwater System Lineup after the system is secured when escalating power.
This chec~ off _,was run at 0621 on 1/8/77 when the Aux Feed Pumps were taken out of service.
No. 13 Aux Feedwater Pump was last demonstrated operable on 1/2/77 during Surveillance Action 4.7.1.2. All operations personnel have been re-instructed on the importance of proper veri-fication of Auxiliary Feedwater System Lineup.
- - 1
RECEIVED DOCUMENT PP.OCESS~!!G Ul-iiT 19{( JUL 20 AM 11 4 8
~.