05000272/LER-2077-039-03, Inoperability of Pressurizer Level
| ML19031A906 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/24/1977 |
| From: | Librizzi F Public Service Electric & Gas Co |
| To: | O'Reilly J NRC/IE, NRC Region 1 |
| References | |
| LER 1977-039-03 | |
| Download: ML19031A906 (4) | |
| Event date: | |
|---|---|
| Report date: | |
| 2722077039R03 - NRC Website | |
text
.r:*** *..*
....... ~, '\\L_j~.
--:*~
I 7J17 I
Public Service Electric and Gas Company 80 Park Place Newa.rk, N.J. 07101 Phone 201/622-?0QO Mr. James P. O'Reilly nirector of USNRC Off ice of Inspections and Enforcements Reg-ion 1 6 31 P.a:rk,.;.venue King of P:russia, Pennsylvania 19406
- ne~fr Mr. o 'Reilly:
LICENSE NO. DPR-70 DOCKET NO. 50-272
- RE:PORT:ABLE *OCCURRENCE 77-39/03L
" t <--~
fa~i t*l
.A'.i 0
rv-1
(/)
.CJ
- -:-1 r*'<1 0 rro <*
rti'-'*
c::i)'I
(,~:~
!:~;B2
.... '.:.(1)11
- t.:.J
\\::t t::J r***-t *.. ~
(/)~~
c::;!'J
""N",_..,,,.
- !::OJ
-!C:
Ptl~suant to the requirements 6f Salem G~rierating Station Unit No. 1 Technical Specifications, Se~tl6n 6.9.1, we are submitting
. Licensee Event Report for Reportabl:e" OGc.ur<r:ence 77.-39/0-3-b.
This report is required within thirty (30) days of the occurrence.
CC:
Director, Office of Inspection and Enforcement (30 copies).
Director, Office of Management Information and Program Control (3 copies)
The Energy People Sincerely yours,
)JtiAy
.F. P. Librizzi General Manager -
Electric Production
~ --**
,.. i 1-,i**
- -.-1n4'-..I..* -
l ~::1 1
'LICENSEE EVENT REPORT CONTROLBLOC:< !(')! f 171 JJ )! 71 l
6 LER.77-39/03L 6/10/77
' 1*
- .. f>., ~
~
\\ ~'\\ y "'-'~'1 O'.' *.
LICENSE EVENT 1..ICENSEC:
NAME 1.ICO:NSE NUMt;E?.
TYPE TV?E
@:IT] jN I J l SIG l S l l !
9 14 10101-10101010101-1*010J !4ll!l!lllJ 1n 1Jl33!'
15 2:.
2:>
~
REPORT i:<EPORT CATEOORY TYl'E SOURCE OOCKET NUMBER EVENT CATE R_EPORT OATE.
~
cowrw. ~ Lkl
~p I 5 ! 0 I -I O 1,_2 I 71 ~k
~: I 5 I 2 1 4 ! 71 ~1 Ii~ I 61 11 0 I 7 t 1J
- - vENTOESc~(11°~~10~)
@TI] Duri nq Mode I Operation, Channel T pressurizer le~rel was dec1 ari::>~ in-I 7
8* 9*
80
@TI] I operable due to it indicating 3-5% oreater than other ooerable channels. I
- 1 8 9
' * * *.. * :**./.. I.
- !,39
'[9}'11 Channel I *was Placed in the tripped condition and ?~on Stater!i;ents for,J 7
gg
'~
[oisiU,CO 3.3.1.l ai'"ls 3.3.2.l were imolemented. :c:s transmitter sensinc line wa.si 7
3B
~
~
j-backfilled with DM water and gas was flushed back i:o -nressurizer.
I 7
8 9 PRIME SO SYSTEM
CAUSE
COMPONENT COMPONENT COOE COOE COMPONENT COOE
- SUl'Pl..JER MANUFACTURER [ill] l!J!Ll l£j IX I X I X I X I X__LlLl llJ I Z I 9 19 I 9 I VIOl.ATION tN.J 7
8 9 10 11 12 17 43 44 47 48 CAUSE* OESCf\\lPTION
~!Non-condensable gas trapped in the ~P transmitter sensing line
~9 l.2ill I caused a false high level sigTial.
7 8 9 [ili]
7 8.~9:-----------,:---------------------------------------------::::
FACILITY STATUS
!ill]
L.ru.
1 a. g FORM CF
'!fo POWER 10 19 151 10 12 METl-IOO OF OTl-IE~ STATUS OISCOV.ERV I
N1A
~,__~,__,__,___,I laJ 13 44 45 DISCOVERY pESCRIFTION N/A ACTIVITV CONTENT REl..EASEO OF REl..EASE AMOUNT OF ACTIVITY G:E)
~ ~ I N/A 1..0CATION OF RELEASE II
~.--~~~,__...._.__N_/_A~~,__,___.._..,.--.,,:1 7
8 9
10 11
~-
~
~
PERSONNEL EXPOSURES r.r.;")
NUMBER TYPE
DESCRIPTION
~1010101 lZJ
~~~--=N~A=-~~-~-~-~~~--~~~~~-=!
7 s 9 11 12 13 PERSONNEL INJURIES NUMBER
DESCRIPTION
[£01010101 1
e 9 11 NA 12 OFF~TECONSECUENCES
~..._~--------------------~N:.!L..~A=------------------------------------~---------Fld LOSS OR DAMAGE TO FACILITY GE] 19:;j IOESCRIPTION N/A 7
8
~10-----------------::..:J._=.;:;__ ________________________________ _,,, __ -""1 AOOITIONAL FACTORS EE] ~~sn::¥R!
7
~a~,,....... --__,,..,.,,P NAME: ____________ T--'.'--""L'"".'""*-"'S_o
..... e.---=-n~c=e'""r._ __ _
PHONE: (609) 365-7000 Ext. Salem 528
,~*'.
~
Report Number:
Fi.~port Date:
- Occur.rence Facility:
e39/03L 6/10/77 5/24/77 Salem Generating Station Public Service Electric S: Gas Company Hancccks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Pressurizer Level Channel I Inoperable CONDITIONS PRIOR TO OCCURRENCE:
Ope~aion~l Mcide l, Reactor-Power 95%
DESCRIPTION OF OCCURRENCE:
At 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />, pressurizer ievel channel I was declared inoperable due to it reading 3 to 5% higher than other operable channels. The pressurizer level channel was placed in the tripped condition.
Action Statement No. 7 for LCO 3.3.1.1, Table 3.3-1 was placed in effect.
Power operation continued thru 5/31/77 when the channel was repaired and returned to service.
DES:IGNATION OF APPA:RENT CAUSE OF OCCURRENCE::
Non-condensable gas trapped in the sensing line between the condensate pot an~ the differential pressure transmitter caused a false high level signal.
ANALYSIS OF OCCURRENCE:
Action Statement No. 7 for LCO 3.3.l.l allows power operation to con-tinue until the next required functional test provided the inoperable channel is placed in the tripped condition within l hour.
Channel I pressurizer level was placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and remained in that condition until repairs were made on 5/31/77.
- Therefore, the LCO was not violated.
At no time was there any danger to the health and safety of the general public or site personnel.
CORRECTIVE ACTION
The differential pressure sensing line was backfilled with DM water through the condensate pot into the pressurizer.
The trapped gas was flushed out and the level signal was reduced to within 20 millivolts of other operable channels.
Pressurizer level Channel I was declared operable and the Action Statement terminated.
f;.*
}
~*
1
'~
77-39/03L e Not Applicable Prepared by m
s
~~~~-*~*--=~p~e~n~*~c~e~r:__~~
SO~C Meeting No.
64-77
- 6/10/77 Manager,
- Sa...t.em Generating Station