IR 05000458/2023040 | 18 January 2024 | 95001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter | |
IR 05000458/2023010 | 12 December 2023 | Biennial Problem Identification and Resolution Inspection Report 05000458/2023010 | Boric Acid Past operability Condition Adverse to Quality Significance Determination Process Operability Determination Through-Wall Leak Through Wall Leak |
IR 05000458/2023003 | 13 November 2023 | Integrated Inspection Report 05000458/2023003 | Time of Discovery Reactor Vessel Water Level Ultimate heat sink Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment Incorporated by reference Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Time Critical Operator Action Maintenance Rule Program Fire Protection Program Substantial potential for an overexposure Downpower Overexposure |
IR 05000458/2023401 | 26 September 2023 | Cyber Security Inspection Report 05000458/2023401 | Cyber Security Affidavit |
IR 05000458/2023403 | 21 September 2023 | NRC Security Inspection Report 05000458/2023403 (Cover Letter) | Affidavit |
IR 05000458/2023001 | 21 September 2023 | NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded | |
IR 05000458/2023012 | 1 September 2023 | Comprehensive Engineering Team Inspection Report 05000458/2023012 | |
IR 05000458/2023005 | 21 August 2023 | Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle Letter | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal |
IR 05000458/2023092 | 15 August 2023 | Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092 | Significance Determination Process Preliminary White Finding |
IR 05000458/2023002 | 9 August 2023 | Integrated Inspection Report 05000458/2023002 | High Radiation Area Ultimate heat sink Enforcement Discretion Functionality Assessment Operability Determination Time Critical Operator Action Fire Protection Program Substantial potential for overexposure Substantial potential for an overexposure Power Uprate Overexposure |
IR 05000458/2023091 | 20 July 2023 | Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091 | Significance Determination Process Preliminary White Finding |
IR 05000458/2023404 | 11 July 2023 | NRC Security Inspection Report 05000458/2023404 (Cover Letter Only) | Affidavit |
IR 05000458/2023090 | 26 June 2023 | NRC Inspection Report 05000458/2023090 and Preliminary White Finding | Mission time Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification FLEX Significance Determination Process Large early release frequency Earthquake Preliminary White Finding |
ML23116A235 | 1 May 2023 | Integrated Inspection Report 05000458/2023001 | Safe Shutdown Fire Barrier Weld Overlay Enforcement Discretion Probabilistic Risk Assessment Nondestructive Examination Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Power change |
IR 05000458/2023011 | 12 April 2023 | NRC License Renewal Phase 1 Inspection Report 05000458/2023011 | Coatings Aging Management License Renewal |
IR 05000458/2022006 | 1 March 2023 | Annual Assessment Letter for River Bend Station Report 05000458/2022006 | Fitness for Duty Commercial Grade Dedication Cyber Security License Renewal Exemption Request COVID-19 |
IR 05000458/2022004 | 1 February 2023 | Integrated Inspection Report 05000458/2022004 | Reactor Vessel Water Level High Radiation Area Ultimate heat sink Mission time Offsite Dose Calculation Manual Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Incorporated by reference Locked High Radiation Area Significance Determination Process Operability Determination Unplanned internal exposure Fire Protection Program Scaffolding Substantial potential for an overexposure Coast down Siren Overexposure |
IR 05000458/2022301 | 3 January 2023 | NRC Examination Report 05000458/2022301 | Job Performance Measure |
IR 05000458/2022010 | 12 December 2022 | Triennial Fire Protection Inspection Report 05000458/2022010 | Safe Shutdown Fire Barrier Fire impairment Temporary Modification Significance Determination Process Fire Protection Program Fire Watch Scaffolding |
IR 05000458/2022003 | 3 November 2022 | and Independent Spent Fuel Storage Installation Integrated Inspection Report 05000458/2022003 and 07200049/2022001 | Safe Shutdown Hydrostatic Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Job Performance Measure Operability Determination Severe Accident Management Guideline Fire Protection Program |
IR 05000458/2022402 | 12 September 2022 | NRC Security Inspection Report 05000458/2022402 (Full Report) | |
IR 05000458/2022002 | 9 August 2022 | Integrated Inspection Report 05000458/2022002 | Reactor Vessel Water Level Internal Flooding Enforcement Discretion Probabilistic Risk Assessment Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Continuous fire watch Fire Protection Program Fire Watch Grace period Downpower |
IR 05000458/2022011 | 2 June 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2022011 | Significance Determination Process Operability Determination Power-Operated Valves Weak link |
IR 05000458/2022001 | 27 April 2022 | Integrated Inspection Report 05000458/2022001 | High winds Half scram Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Scram Discharge Volume Operability Determination Fire Protection Program Power change Downpower |
IR 05000458/2021006 | 2 March 2022 | Annual Assessment Letter (Report 05000458/2021006) | Fitness for Duty Exemption Request Power-Operated Valves COVID-19 |
IR 05000458/2021004 | 25 January 2022 | Integrated Inspection Report 05000458/2021004 | Safe Shutdown Fire Barrier Internal Flooding Probabilistic Risk Assessment Temporary Modification Functionality Assessment Condition Adverse to Quality Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Fire Protection Program Grace period |
ML22011A099 | 14 January 2022 | IR 2021012 EOI CO3 | Job Performance Measure |
IR 05000458/2021402 | 15 December 2021 | Security Baseline Inspection Report 05000458/2021402 | Fitness for Duty |
IR 05000458/2021404 | 7 December 2021 | Material Control and Accounting Program Inspection Report 05000458/2021404, Publicly Available | Affidavit |
IR 05000458/2021401 | 3 December 2021 | Security Baseline Inspection Report 05000458/2021401 | Fitness for Duty |
IR 05000458/2021003 | 4 November 2021 | Integrated Inspection Report 05000458/2021003 | Offsite Dose Calculation Manual Internal Flooding Met Tower Temporary Modification Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Scram Discharge Volume Annual Radiological Environmental Operating Report Process Control Program Operability Determination Coronavirus COVID-19 Fire Protection Program Siren |
IR 05000458/2021091 | 30 September 2021 | Notice of Violation and Proposed Imposition of $150,000 Civil Penalty, NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 | Cyber Security Coronavirus COVID-19 |
IR 05000458/2021002 | 11 August 2021 | Integrated Inspection Report 05000458/2021002 | Reactor Vessel Water Level Enforcement Discretion Met Tower Temporary Modification Cyber Security Functionality Assessment Significance Determination Process Large early release frequency Operability Determination Coronavirus COVID-19 Fire Protection Program Downpower |
IR 05000458/2021090 | 1 July 2021 | NRC Inspection Report 05000458/2021090 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019 | Non-Destructive Examination Nondestructive Examination Cyber Security Significance Determination Process |
IR 05000458/2021013 | 25 May 2021 | Rriver Bend Station - NRC Baseline Inspection Report 05000458/2021013 | Ultimate heat sink Enforcement Discretion Temporary Modification Fukushima Dai-Ichi Significance Determination Process Coronavirus COVID-19 |
IR 05000458/2021403 | 24 May 2021 | Security Baseline Inspection Report 05000458/2021403 | |
IR 05000458/2021001 | 5 May 2021 | RBS2021001-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2021001 | High Radiation Area Anticipated operational occurrence Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Locked High Radiation Area Significance Determination Process Operability Determination Tornado Missile Risk Evaluator Maintenance Rule Program Coronavirus COVID-19 Liquid penetrant Fire Protection Program Power change |
IR 05000458/2021010 | 18 March 2021 | 2021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of Violation | Temporary Modification Condition Adverse to Quality FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Substantial potential for overexposure Overexposure |
IR 05000458/2020004 | 11 February 2021 | RBS2020004-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2020004 | Safe Shutdown Earthquake Enforcement Discretion Operating Basis Earthquake Temporary Modification Functionality Assessment FLEX Significance Determination Process Annual Radioactive Effluent Release Report Large early release frequency Operability Determination Earthquake Coronavirus COVID-19 Fire Protection Program |
IR 05000458/2020003 | 16 November 2020 | Revised Integrated Inspection Report 05000458/2020003 | Safe Shutdown Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Coronavirus COVID-19 Fire Protection Program Hourly Fire Watch Downpower |
ML20303A140 | 30 October 2020 | Integrated Inspection Report 05000458/2020003 | Safe Shutdown Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Job Performance Measure Coronavirus COVID-19 Fire Protection Program Hourly Fire Watch Downpower |
IR 05000458/2020011 | 6 October 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000458/2020011 | Non-Destructive Examination Probabilistic Risk Assessment Temporary Modification FLEX Significance Determination Process Job Performance Measure Large early release frequency Battery sizing Weak link Power Uprate |
IR 05000458/2020012 | 29 September 2020 | NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of Violation | Significance Determination Process |
ML20273A235 | 29 September 2020 | NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of Violation | Significance Determination Process |
IR 05000458/2020412 | 28 September 2020 | Security Baseline Inspection Report 05000458/2020412 | |
IR 05000458/2020050 | 3 September 2020 | Special Inspection Report 05000458/2020050 | High winds Past operability Emergency Lighting Functionality Assessment Condition Adverse to Quality FLEX Significance Determination Process Large early release frequency Coronavirus COVID-19 |
IR 05000458/2020410 | 3 September 2020 | Security Baseline Inspection Report 05000458/2020410 | |
IR 05000458/2020411 | 3 September 2020 | NRC Security Inspection Report 05000458/2020411 | Cyber Security |
IR 05000458/2020005 | 1 September 2020 | Updated Inspection Plan for River Bend Station (Report 05000458/2020005) | Fitness for Duty Cyber Security Exemption Request Coronavirus |
IR 05000458/2020002 | 30 July 2020 | Integrated Inspection Report 05000458/2020002 | Safe Shutdown Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Functionality Assessment FLEX Significance Determination Process Operability Determination Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Downpower |