 Issue dateTitleTopic
IR 05000458/202304018 January 202495001 Supplemental Inspection Supplemental Report 05000458/2023040 and Follow-Up Assessment Letter
IR 05000458/202301012 December 2023Biennial Problem Identification and Resolution Inspection Report 05000458/2023010Boric Acid
Past operability
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Through-Wall Leak
Through Wall Leak
IR 05000458/202300313 November 2023Integrated Inspection Report 05000458/2023003Time of Discovery
Reactor Vessel Water Level
Ultimate heat sink
Mission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Time Critical Operator Action
Maintenance Rule Program
Fire Protection Program
Substantial potential for an overexposure
Downpower
Overexposure
IR 05000458/202340126 September 2023Cyber Security Inspection Report 05000458/2023401Cyber Security
Affidavit
IR 05000458/202340321 September 2023NRC Security Inspection Report 05000458/2023403 (Cover Letter)Affidavit
IR 05000458/202300121 September 2023NRC Inspection Report 05000458/2023001, Disputed Non-Cited Violation Rescinded
IR 05000458/20230121 September 2023Comprehensive Engineering Team Inspection Report 05000458/2023012
IR 05000458/202300521 August 2023Updated Inspection Plan for River Bend Station (Report 05000458/2023005) - Mid Cycle LetterFitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
IR 05000458/202309215 August 2023Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023092Significance Determination Process
Preliminary White Finding
IR 05000458/20230029 August 2023Integrated Inspection Report 05000458/2023002High Radiation Area
Ultimate heat sink
Enforcement Discretion
Functionality Assessment
Operability Determination
Time Critical Operator Action
Fire Protection Program
Substantial potential for overexposure
Substantial potential for an overexposure
Power Uprate
Overexposure
IR 05000458/202309120 July 2023Final Significance Determination of a White Finding, Notice of Violation, and Follow-Up Assessment Letter; NRC Inspection Report 05000458/2023091Significance Determination Process
Preliminary White Finding
IR 05000458/202340411 July 2023NRC Security Inspection Report 05000458/2023404 (Cover Letter Only)Affidavit
IR 05000458/202309026 June 2023NRC Inspection Report 05000458/2023090 and Preliminary White FindingMission time
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
FLEX
Significance Determination Process
Large early release frequency
Earthquake
Preliminary White Finding
ML23116A2351 May 2023Integrated Inspection Report 05000458/2023001Safe Shutdown
Fire Barrier
Weld Overlay
Enforcement Discretion
Probabilistic Risk Assessment
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
Power change
IR 05000458/202301112 April 2023NRC License Renewal Phase 1 Inspection Report 05000458/2023011Coatings
Aging Management
License Renewal
IR 05000458/20220061 March 2023Annual Assessment Letter for River Bend Station Report 05000458/2022006Fitness for Duty
Commercial Grade Dedication
Cyber Security
License Renewal
Exemption Request
COVID-19
IR 05000458/20220041 February 2023Integrated Inspection Report 05000458/2022004Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Mission time
Offsite Dose Calculation Manual
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Incorporated by reference
Locked High Radiation Area
Significance Determination Process
Operability Determination
Unplanned internal exposure
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Coast down
Siren
Overexposure
IR 05000458/20223013 January 2023NRC Examination Report 05000458/2022301Job Performance Measure
IR 05000458/202201012 December 2022Triennial Fire Protection Inspection Report 05000458/2022010Safe Shutdown
Fire Barrier
Fire impairment
Temporary Modification
Significance Determination Process
Fire Protection Program
Fire Watch
Scaffolding
IR 05000458/20220033 November 2022and Independent Spent Fuel Storage Installation Integrated Inspection Report 05000458/2022003 and 07200049/2022001Safe Shutdown
Hydrostatic
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Operability Determination
Severe Accident Management Guideline
Fire Protection Program
IR 05000458/202240212 September 2022NRC Security Inspection Report 05000458/2022402 (Full Report)
IR 05000458/20220029 August 2022Integrated Inspection Report 05000458/2022002Reactor Vessel Water Level
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Continuous fire watch
Fire Protection Program
Fire Watch
Grace period
Downpower
IR 05000458/20220112 June 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000458/2022011Significance Determination Process
Operability Determination
Power-Operated Valves
Weak link
IR 05000458/202200127 April 2022Integrated Inspection Report 05000458/2022001High winds
Half scram
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Scram Discharge Volume
Operability Determination
Fire Protection Program
Power change
Downpower
IR 05000458/20210062 March 2022Annual Assessment Letter (Report 05000458/2021006)Fitness for Duty
Exemption Request
Power-Operated Valves
COVID-19
IR 05000458/202100425 January 2022Integrated Inspection Report 05000458/2021004Safe Shutdown
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Operability Determination
Maintenance Rule Program
Coronavirus
COVID-19
Fire Protection Program
Grace period
ML22011A09914 January 2022IR 2021012 EOI CO3Job Performance Measure
IR 05000458/202140215 December 2021Security Baseline Inspection Report 05000458/2021402Fitness for Duty
IR 05000458/20214047 December 2021Material Control and Accounting Program Inspection Report 05000458/2021404, Publicly AvailableAffidavit
IR 05000458/20214013 December 2021Security Baseline Inspection Report 05000458/2021401Fitness for Duty
IR 05000458/20210034 November 2021Integrated Inspection Report 05000458/2021003Offsite Dose Calculation Manual
Internal Flooding
Met Tower
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Scram Discharge Volume
Annual Radiological Environmental Operating Report
Process Control Program
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Siren
IR 05000458/202109130 September 2021Notice of Violation and Proposed Imposition of $150,000 Civil Penalty, NRC Inspection Report 05000458/2021091 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019Cyber Security
Coronavirus
COVID-19
IR 05000458/202100211 August 2021Integrated Inspection Report 05000458/2021002Reactor Vessel Water Level
Enforcement Discretion
Met Tower
Temporary Modification
Cyber Security
Functionality Assessment
Significance Determination Process
Large early release frequency
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Downpower
IR 05000458/20210901 July 2021NRC Inspection Report 05000458/2021090 and Investigation Reports 4-2020-008, 4-2020-009, and 4-2020-019Non-Destructive Examination
Nondestructive Examination
Cyber Security
Significance Determination Process
IR 05000458/202101325 May 2021Rriver Bend Station - NRC Baseline Inspection Report 05000458/2021013Ultimate heat sink
Enforcement Discretion
Temporary Modification
Fukushima Dai-Ichi
Significance Determination Process
Coronavirus
COVID-19
IR 05000458/202140324 May 2021Security Baseline Inspection Report 05000458/2021403
IR 05000458/20210015 May 2021RBS2021001-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2021001High Radiation Area
Anticipated operational occurrence
Enforcement Discretion
Nondestructive Examination
Temporary Modification
VT-2
Functionality Assessment
Locked High Radiation Area
Significance Determination Process
Operability Determination
Tornado Missile Risk Evaluator
Maintenance Rule Program
Coronavirus
COVID-19
Liquid penetrant
Fire Protection Program
Power change
IR 05000458/202101018 March 20212021 River Bend Station - Biennial Problem Identification and Resolution Inspection Report 05000458/2021010 and Notice of ViolationTemporary Modification
Condition Adverse to Quality
FLEX
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Substantial potential for overexposure
Overexposure
IR 05000458/202000411 February 2021RBS2020004-RP-RJK, River Bend Station - Integrated Inspection Report 05000458/2020004Safe Shutdown Earthquake
Enforcement Discretion
Operating Basis Earthquake
Temporary Modification
Functionality Assessment
FLEX
Significance Determination Process
Annual Radioactive Effluent Release Report
Large early release frequency
Operability Determination
Earthquake
Coronavirus
COVID-19
Fire Protection Program
IR 05000458/202000316 November 2020Revised Integrated Inspection Report 05000458/2020003Safe Shutdown
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Coronavirus
COVID-19
Fire Protection Program
Hourly Fire Watch
Downpower
ML20303A14030 October 2020Integrated Inspection Report 05000458/2020003Safe Shutdown
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Job Performance Measure
Coronavirus
COVID-19
Fire Protection Program
Hourly Fire Watch
Downpower
IR 05000458/20200116 October 2020Design Basis Assurance Inspection (Teams) Inspection Report 05000458/2020011Non-Destructive Examination
Probabilistic Risk Assessment
Temporary Modification
FLEX
Significance Determination Process
Job Performance Measure
Large early release frequency
Battery sizing
Weak link
Power Uprate
IR 05000458/202001229 September 2020NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of ViolationSignificance Determination Process
ML20273A23529 September 2020NRC Inspection Report 05000458/2020012, Investigation Report 4-2019-013 and Notice of ViolationSignificance Determination Process
IR 05000458/202041228 September 2020Security Baseline Inspection Report 05000458/2020412
IR 05000458/20200503 September 2020Special Inspection Report 05000458/2020050High winds
Past operability
Emergency Lighting
Functionality Assessment
Condition Adverse to Quality
FLEX
Significance Determination Process
Large early release frequency
Coronavirus
COVID-19
IR 05000458/20204103 September 2020Security Baseline Inspection Report 05000458/2020410
IR 05000458/20204113 September 2020NRC Security Inspection Report 05000458/2020411Cyber Security
IR 05000458/20200051 September 2020Updated Inspection Plan for River Bend Station (Report 05000458/2020005)Fitness for Duty
Cyber Security
Exemption Request
Coronavirus
IR 05000458/202000230 July 2020Integrated Inspection Report 05000458/2020002Safe Shutdown
Internal Flooding
Hydrostatic
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
FLEX
Significance Determination Process
Operability Determination
Coronavirus
COVID-19
Through-Wall Leak
Fire Protection Program
Downpower