 Issue dateTitleTopic
ML20217K9406 October 1999Submits Safeguards Event Log for Calendar Quarter Ending 990930,IAW 10CFR73.71.No Safeguards Events Occurred
ML20210F3659 July 1999Submits Safeguards Event Log for Calendar Quarter Ending 990630,IAW 10CFR73.71 & LACBWR Security Plan
ML20206R92110 May 1999Forwards Annual Financial Rept & Certified Financial Statements for DPC for Years 1998 & 1997,IAW 10CFR50.71(b). Util Will Forward 1998 Annual Rept as Soon as Rept Is Completed
ML20206J36730 April 1999Forwards Rev 13 to QA Program Description, IAW 10CFR50.54(a)(3) & 50.4(b)(7).Changes in Rev 13 ListedFire Protection Program
ML20205R4268 April 1999Submits Ltr for Calendar Quarter Ending 990331 IAW 10CFR73.71, Reporting of Safeguards Events. No Safeguards Events Occurred During Quarter
ML20204F8299 March 1999Forwards Annual Rept on Status of Decommissioning Funding for La Crosse Boiling Water Reactor,Iaw 10CFR50.75(f)(1)
ML20207C26619 February 1999Forwards Radioactive Effluent Rept & Radiological Monitoring Rept for 1998 for Lacbwr. Lacbwr,Pcp & ODCM, Encl
ML20207A94311 February 1999Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change
ML20196A89223 November 1998Forwards Rev 12 to LACBWR QA Program Description
ML20154P43513 October 1998Responds to Re Insp Rept 50-409/98-02 & Refers to C/As Taken to Bring LACBWR Into Compliance with Maint Rule
ML20153F74314 September 1998Informs That Changes Made in Rev 12 Are Adminstrative in Nature & Do Not Result in Reduction in Commitment to Safety & Reliably Operate LACBWR in Safstor Condition,Per 980909 Telcon with NRC
ML20237E26315 July 1998Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin
ML20217K71227 March 1998Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev
ML20202J42616 February 1998Forwards Revised LACBWR Decommissioning Plan & Revised LACBWR Initial Site Characterization Survey for Safstor. Both Documents Revised Jan 1998Emergency Lighting
Fire Protection Program
ML20202J03810 February 1998Forwards Revised LACBWR Decommissioning Plan. Each Page W/Change Will Have Bar in right-hand Margin to Designate Location of Change
ML20198R97224 October 1997Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld
ML20149G13110 July 1997Submits Ltr Re Quarterly Submittal of Safeguards Events Log for Quarter Ending 970630.No Safeguards Events During Past Quarter
ML20148S9133 July 1997Forwards Annual Financial Rept & Certified Financial Statements for Dairyland Power Cooperative for 1996 & 1995
ML20141B7529 May 1997Forwards TS Re Changes to LACBWR Controlling Documents
ML20138H80129 April 1997Forwards Corrected Page to Safety Evaluation,Issued by NRC, by Ltr Dtd 970425.W/o Ltr
ML20138A64315 April 1997Forwards Rev 11 to LACBWR QA Program DescriptionNon-Destructive Examination
Offsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20138B72610 April 1997Submits Ltr for Calendar Quarter Ending 970331,IAW 10CFR73.71 & LACBWR Security Plan
ML20134H18431 January 1997Submits Quarterly Safeguards Event Log Re License DPR-45
ML20133A37216 December 1996Forwards Rev 17 to LACBWR Emergency Plan
ML20132F86010 December 1996Forwards Revised LACBWR Decommissioning Plan. Each Page W/ Change Will Have Bar in right-hand Margin to Designate Location of Change
ML20134M2425 November 1996Forwards Rev 11 to QA Program Description, Clarifying Section I, Organization Paragraph 7.d Revised to Assure Majority of SRC Members Be Degreed Individuals
ML20058P1289 December 1993Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encls Withheld (Ref 10CFR2.790(d))
ML20059G6131 November 1993Responds to Re Violations Noted in Insp Rept 50-409/93-01 on 930903 & 22 & 24.Corrective Actions: Reassigned Mechanics & Instrument Technician to LACBWR Staff
ML20056E26012 August 1993Forwards Nonproprietary & Proprietary Version of Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve. Proprietary Version Withheld
ML20056E26811 May 1993Requests That Proprietary Analysis of Potential Blast Effects on LACBWR Reactor Bldg Due to 16 Inch Natural Gas Pipeline Failure,Suppl Analysis for Fast Closing Valve Be Withheld,Per 10CFR2.790(b)(4)
ML20128P46111 February 1993Forwards Rev to Annual Decommissioning Plan,Changing Requirement to Maintain Hourly Meteorological Data Logging for Effluent Release Calculations & Removing Makeup Demineralizer Sys
ML20128K5899 February 1993Forwards Corrected App a to Annual Rept for 1992 - Rept of Changes,Tests & Experiments
ML20055H63725 July 1990Forwards Decommissioning Fund Rept for Plant
ML18041A21116 November 1989Responds to Generic Ltr 89-19 Re Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants. Actions or Recommendations in Generic Ltr Will Not Be Performed
ML20248C59421 September 1989Forwards Revised Radioactive Effluent Rept for LACBWR (Jan- June 1989), Incorporating Sr-89/90 & Fe-55 Analysis Data
ML20247A19322 August 1989Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12
ML20245G09127 July 1989Advises That Util Already Exempt from 10CFR26, Fitness-for- Duty Program Because of Safstor Status.Request for Exemption Will Not Be Necessary Since License Amended to possession-only License Via Amend 63
ML20246K84110 July 1989Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2, Spds. All Spent Fuel Transferred from Reactor to Spent Fuel Storage Well & on 870804,License DPR-45 Amended to possess- but-do-not-operate Status
ML20246B83727 June 1989Forwards Endorsements 71,72,73,74,75 & 76 to Nelia Policy NF-217
ML20245A1236 June 1989Submits Whole Body Dose Estimates & Request for Changes to Tech Specs 6.8.3.1 & 6.8.4Unanalyzed Condition
ML20248C2861 June 1989Responds to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thinning. Generic Ltr Does Not Apply to Plant Since No Sys Operate as High Energy Sys
ML20247B3128 May 1989Responds to NRC Re Conduct of Backfit Process, Informing NRC of Plant Permanent Shutdown in Apr 1987Backfit
ML20248F1427 April 1989Forwards Annual Financial Rept & Certified Financial Statements for 1987 & 1988.W/o Annual Financial Rept
ML20246N80417 March 1989Submits Info Re on-site Property Damage Insurance for License DPR-45 for Period 880919 - 890919
ML20204G91913 October 1988Requests Immediate Relief from Several Sampling & Analysis Requirements of Radiological Environ Monitoring Program to Check for Prescence of I-131.Tech Spec Changes Encl
ML20155A31030 September 1988Responds to NRC 880707 Request for Addl Info Re Decommissioning Plan.Info Includes Flooding Potential & Protection Requirements,Flood Conditions & Effects of High Water Level on StructuresSafe Shutdown
Ultimate heat sink
Offsite Dose Calculation Manual
Hydrostatic
Process Control Program
Earthquake
ML20154L3519 September 1988Forwards Answers to Request for Addl Info Re Decommissioning Plan & Safe Storage Tech Specs.Some Answers Suggest Changes to Either Tech Specs or Decommissioning Plan
ML20154J3418 September 1988Forwards Revs to Security,Training & Qualification & Contingency Plans.Revs Withheld (Ref 10CFR2.790(d))
ML20154E46730 August 1988Responds to Generic Ltr 88-13, Operator Licensing Exams. NRC Will Require Qualified Individuals to Be in Charge of Control Room & Fuel Handling Operations
ML20207D1803 August 1988Advises That Generic Ltr 88-11 Re Radiation Embrittlement of Reactor Vessel Matls Inapplicable to Facility.Reactor Vessel Will Not Be Subj to Pressurization in Plant Safstor Condition