ML20140D236

From kanterella
Jump to navigation Jump to search
Forwards Integrated Insp Rept 50-302/97-05 on 970330-0503 & NOV
ML20140D236
Person / Time
Site: Crystal River Duke energy icon.png
Issue date: 06/02/1997
From: Jaudon J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard Anderson
FLORIDA POWER CORP.
Shared Package
ML20140D240 List:
References
50-302-97-05, 50-302-97-5, NUDOCS 9706100300
Download: ML20140D236 (4)


See also: IR 05000302/1997005

Text

_

. s

June 2, 1997

Florida Power Corporation

Crystal River Energy Complex

Mr. Roy A. Anderson (SA2C)

Senior Vice President, Nuclear Operations

ATTN: Mgr.. Nuclear Licensing

15760 West Power Line Street

Crystal River, FL 34428-6708

SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-302/97-05

NOTICE OF VIOLATION

Dear Mr. Anderson:

On May 3,1997, the NRC completed an inspection at your Crystal River 3

reactor facility. The enclosed report presents the results of that

inspection.

During the 5-week period covered by this inspection, your conduct of

activities at your Crystal River facility was generally characterized as

adequate. We are concerned, however, about two violations of NRC requirements

that were identified. In the area of Operations, a violation was cited for

several examples of failure to follow clearance tagging procedural

requirements. This violation and other recently documented problems indicate

significant problems in your ability to administer a safe and effective

clearance tagging system. In the area of Engineering, a violation was cited

for inadequate written procedures for safety-related annunciators caused by

poor design control in modification implementation.

These violations are cited in the enclosed Notice of Violation, and the

circumstances surrounding the violations are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when

preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter and its enclosures will be placed in the NRC Public Document Room

(PDR).

Sincerely,

!

9706100300 970602

o os 0500000 Johns P. Jaudon Director t

Division of Reactor Safety

e o. 2

Enclosures: Notice of Violation

Inspection Report 50-302/97-05

0FFICIAL COPY

7DO I

_ _ - ___ _ _ __ . _ _ __

l _ __

.. .

i

1

FPC 2

'

t

l cc w/encls:

John P. Cowan. Vice President

Nuclear Production (SA2C)

FPC Crystal River Energy Complex

l 15760 West Power Line Street

Crystal River. FL 34428-6708

B. J. Hickle. Director

Nuclear Plant Operations (NA2C)

l

FPC. Crystal River Energy Complex

15760 West Power Line Street

Crystal River. FL 34428-6708

Robert E. Grazio. Director

Nuclear Regulatory Affairs (SA2A)

FPC. Crystal River Energy Complex

15760 West Power Line Street

Crystal River. FL 34428-6708  :

James S. Baumstark. Director i

Quality Programs (SA2C)

FPC. Crystal River Energy Complex

15760 West Power Line Street

Crystal River, FL 34428-6708

R. Alexander Glenn. Corporate Counsel

Florida Power Corporation

MAC - ASA

l P. O. Box 14042-

St. Petersburg, FL 33733-4042

i Attorney General

l

'

Department of Legal Affairs

The Capitol

l Tallahassee, FL 32304

l

L Bill Passetti

l Office of Radiation Control

! Dept of Health and Rehab. Serv.

1317 Winewood Boulevard

Tallahassee, FL 32399-0700

Joe Myers. Director

Division of Emergency Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee, FL 32399-2100

,

cc w/encls: Continued see page 3

f

,

.. ._ _

,

,

,. .-  ;

'

1

i FPC- 3

l  :

i

cc w/encls: Continued i

Chairman  !

Board of County Commissioners i

Citrus County-  !

110 N. Apopka Avenue  ;

j Inverness. FL 34450-4245 j

l Robert B. Borsum I

Framatome Technologies  ;

! 1700 Rockville Pike. Suite 525  :

Rockville. MD 20852-1631

, Distribution w/encls:

L. Raghavan. tJRR

B. Schin. RII

l

P. Steiner. RIl

PUBLIC

l

NRC Resident Inspector

l U.S. Nuclear Regulatory Commission l

6745 N. Tallahassee Road

'

i

l

'

Crystal River. FL 34428 i

i

l

I i

!

!

l

J

l

!

!

l *FOR PREVIOUS CONCURRENCE SEE ATTACHED

I

l

j orrirr ,

SIGNATURE

NAME $Ninh* Klandis * SCahill * TCooper* SSanchez* PFillion

DATE 06 / / 97 06 / / 97 06 / / 97 06 / / 97 06 / / 97 06 / / 97

COPY? YES NO YES NO YES NO YES NO YES NO YES NO

i

OrF1CF

SIGNATURE J

NAME LMellen * RScM n * MThon,as

,

,

>

CATE 06 / / 97 06 / / 97 06 / / 97 06 / / 97 06 / / 97 06 / / 97

COPY? YES NO - YES NO YES NO YES NO VES NO YES NO

. Off(Cl4 KtCURU COPY LXX,UMLhl NAMt
G:\CRf51AL\htPUkiMCR9/-05,APR

!

l

l

I'

I

y

. .

FPc 3

Distribution w/encis:

L. Raghavan. NRR

B. Schin. RII

P. Steiner. RII

PUBLIC

NRC Resident' Inspector

U.S. Nuclear Regulatory Commission

, 6745 N. Tallahassee Road

Crystal River. FL 34428

Q

l

!

I

l

l

l

l nrrier fi n n ) AIC O RS

S!GNATURE 5 / ' '

'

NAME /5N W.h 3 }dhiil pT)$o r- 3$$an: P lion

,

DATE 5 /qd / 97 01./ [ / 97 .\ 05 / 7 b / 97 k\ 05/7,0/97

7 05 / / 97 05 / 2. 7 / 97

  1. #

'

COPY 7 (itS/ NO [VES) NO [ES)' NO YES 60') YES [0h YES

k

t "' \,./ V V  %/

orrfct __

I

SIGNATURE 7,7 Q -

NAME L clien kunin MThomas

DATE 05 / / 97 05 / 7.51 / 97 05 / 8 9 / 97 05 / / 97 05 / / 97 05 / / 97 .

COPY? YES @ [IES) NO 5

(T5'5) NO YES NO YES NO YES NO l

OFilCIAL htLORD COPY UuLUMtNi NAMt: G;\Lhf5iAt\htF05 E Gk9/-05.AFk

(