ML20140D236
| ML20140D236 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/02/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Richard Anderson FLORIDA POWER CORP. |
| Shared Package | |
| ML20140D240 | List: |
| References | |
| 50-302-97-05, 50-302-97-5, NUDOCS 9706100300 | |
| Download: ML20140D236 (4) | |
See also: IR 05000302/1997005
Text
_
.
s
June 2, 1997
Florida Power Corporation
Crystal River Energy Complex
Mr. Roy A. Anderson (SA2C)
Senior Vice President, Nuclear Operations
ATTN:
Mgr.. Nuclear Licensing
15760 West Power Line Street
Crystal River, FL 34428-6708
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-302/97-05
Dear Mr. Anderson:
On May 3,1997, the NRC completed an inspection at your Crystal River 3
reactor facility. The enclosed report presents the results of that
inspection.
During the 5-week period covered by this inspection, your conduct of
activities at your Crystal River facility was generally characterized as
adequate.
We are concerned, however, about two violations of NRC requirements
that were identified.
In the area of Operations, a violation was cited for
several examples of failure to follow clearance tagging procedural
requirements. This violation and other recently documented problems indicate
significant problems in your ability to administer a safe and effective
clearance tagging system.
In the area of Engineering, a violation was cited
for inadequate written procedures for safety-related annunciators caused by
poor design control in modification implementation.
These violations are cited in the enclosed Notice of Violation, and the
circumstances surrounding the violations are described in detail in the
enclosed report.
Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response.
The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
!
9706100300 970602
os 0500000
Johns P. Jaudon Director
t
o
Division of Reactor Safety
e
o.
2
Enclosures: Notice of Violation
Inspection Report 50-302/97-05
0FFICIAL COPY
7DO I
l _ __
_
_
-
___
_
_
__
.
_
_
__
..
.
i
1
2
'
t
l
cc w/encls:
John P. Cowan. Vice President
Nuclear Production (SA2C)
FPC Crystal River Energy Complex
l
15760 West Power Line Street
Crystal River. FL 34428-6708
B. J. Hickle. Director
Nuclear Plant Operations (NA2C)
FPC. Crystal River Energy Complex
l
15760 West Power Line Street
Crystal River. FL 34428-6708
Robert E. Grazio. Director
Nuclear Regulatory Affairs (SA2A)
FPC. Crystal River Energy Complex
15760 West Power Line Street
Crystal River. FL 34428-6708
James S. Baumstark. Director
i
Quality Programs (SA2C)
FPC. Crystal River Energy Complex
15760 West Power Line Street
Crystal River, FL 34428-6708
R. Alexander Glenn. Corporate Counsel
Florida Power Corporation
MAC - ASA
l
P. O. Box 14042-
St. Petersburg, FL 33733-4042
i
Attorney General
l
Department of Legal Affairs
'
The Capitol
l
Tallahassee, FL 32304
l
L
Bill Passetti
l
Office of Radiation Control
!
Dept of Health and Rehab. Serv.
1317 Winewood Boulevard
Tallahassee, FL 32399-0700
Joe Myers. Director
Division of Emergency Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee, FL 32399-2100
cc w/encls:
Continued see page 3
,
f
,
,
..
._
_
,
,.
.-
'
1
i
FPC-
3
l
i
cc w/encls: Continued
i
Chairman
!
Board of County Commissioners
i
Citrus County-
!
110 N. Apopka Avenue
j
Inverness. FL 34450-4245
j
l
Robert B. Borsum
Framatome Technologies
!
1700 Rockville Pike. Suite 525
Rockville. MD 20852-1631
Distribution w/encls:
,
L. Raghavan. tJRR
B. Schin. RII
P. Steiner. RIl
l
PUBLIC
l
NRC Resident Inspector
l
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
i
'
l
Crystal River. FL 34428
i
'
i
I
i
!
J
l
!
!
- FOR PREVIOUS CONCURRENCE SEE ATTACHED
l
l
I
orrirr
j
,
SIGNATURE
NAME
$Ninh*
Klandis *
SCahill *
TCooper*
SSanchez*
PFillion
DATE
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
COPY?
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
i
OrF1CF
SIGNATURE
J
NAME
LMellen *
RScM n *
MThon,as
,
CATE
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
06 /
/ 97
>
,
COPY?
YES
NO -
YES
NO
YES
NO
YES
NO
VES
NO
YES
NO
Off(Cl4 KtCURU COPY
LXX,UMLhl NAMt: G:\\CRf51AL\\htPUkiMCR9/-05,APR
- .
!
l
l
I '
I
y
.
.
FPc
3
Distribution w/encis:
L. Raghavan. NRR
B. Schin. RII
P. Steiner. RII
PUBLIC
NRC Resident' Inspector
U.S. Nuclear Regulatory Commission
6745 N. Tallahassee Road
,
Crystal River. FL 34428
Q
l
l
l
l
nrrier
fi
n
n
)
AIC O RS
5
/
'
'
'
S!GNATURE
NAME
/5N W.h
3 }dhiil
pT)$o
r-
3$$an:
P lion
DATE
5 /qd / 97
01./ [ / 97
.\\ 05 / 7 b / 97
k\\ 05/7,0/97
05 /
/ 97
05 / 2. 7 / 97
7
,
COPY 7
(itS/
NO
[VES)
NO
[ES)'
NO
YES
60')
YES [0h
YES
k
'
t
"'
\\,./
V
V
%/
orrfct
__
I
7,7 Q -
SIGNATURE
NAME
L clien
kunin
MThomas
DATE
05 /
/ 97
05 / 7.51 / 97
05 / 8 9 / 97
05 /
/ 97
05 /
/ 97
05 /
/ 97
.
COPY?
YES
@
[IES) NO
(T5'5)
NO
YES
NO
YES
NO
YES
NO
l
5
OFilCIAL htLORD COPY
UuLUMtNi NAMt: G;\\Lhf5iAt\\htF05 E Gk9/-05.AFk
(