BSEP-95-0213, Monthly Operating Repts for Apr 1995 for Brunswick Steam Electric Plant

From kanterella
(Redirected from ML20083L257)
Jump to navigation Jump to search
Monthly Operating Repts for Apr 1995 for Brunswick Steam Electric Plant
ML20083L257
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 04/30/1995
From: Harrison F, Levis W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BSEP-95-0213, BSEP-95-213, NUDOCS 9505180235
Download: ML20083L257 (8)


Text

. . . _ . _ _ _ _ .. .- ~ . s

, . ! . .. ; h <

CP&L Brunswick Nuclear Plant .i P. O. Box 10429 Southport, NC 28461-0429 MAY 0 81995 FILE: B09-13510C i BSEP/95-0213 l

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 MONTHLY OPERATING REPORT Gentlemen:  ;

In accordance with Technical Specification 6.9.1.11 for the Brunswick Nuclear Plant, Units 1 and 2, Carolina Power & Light Company herewith submits the  ;

report of operating statistics and shutdown experience for the month of  ;

April 1995.

Very truly yours, W. Levis, Plant Manager - Unit 1 Brunswick Nuclear Plant FH/ meg MSC/93-8524 cc: Mr. S. D. Ebneter, Regional Administrator, Region II I Mr. C. A. Patterson, Brunswick NRC Senior Resident Inspector Mr. D. C. Trimble, NRR Project Manager - Brunswick Units 1 and 2 The Honorable H. Wells, Chairman - North Carolina Utilities Commission File B-X-0520.2

' ~

9505190235 950430 PDR- ADOCK 05000424 R PDR

/  :

1

'h'g )

.CP&L C5 .

PLANT PERFORMANCE DATA SYSTEM PAGE 1

RUN DATE 05/04/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000

~RUN TIME 08:53:34 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 APRIL 1995 i

DAY' AVG, DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 26 17 -4  ;

2 -11 18 -4 3 -11 19 -4 ,

4 -11 20 -4 5 -9 21 -4 6 -5 22 -4 7 -5 23 -4 8 -5 24 -4 i 9 -5 25 -4 i  !

10 -5 26 -4 11 -5 27 -4 l 12 -5 , 28 -4 13 -5 29 -4 14 -4 30 -4

.15 - -4 16 -4 1.16 - 8 i

.C &P hCh PLANT PERFORMANCE DATA SYSTEM PAGE 1 RpN DATE 05/04/95 OPERATING DATA REPORT RPD36-000

RUN TIME 08:53:34 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756
1. UNIT NAME: BRUNSWICK UNIT 1 NOTES
2. REPORTING PERIOD: APRIL 95

-3. LICENSED THERMAL POWER (MWT): 2436

4. NAMEPLATE RATING (GROSS MWE): 867.0
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE). 791.0

-_ 7 . MAX DEPENDABLE CAPACITY (NET MWE): 767.0 -------------------------------

i

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

f THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 158831.00
12. NUMBER OF HOURS REACTOR CRITICAL 4.70 2164.70 98036.02
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 4.70 2164.70 94121.69
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 18194.00 5239227.97 206774954.86 17 GROSS ELEC. ENERGY GEN. (MWH) 990.00 1742620.00 67902345.00
18. NET ELEC. ENERGY GENERATED (MWH) -3029.00 1691170.00 65290209.00
19. UNIT SERVICE FACTOR .65 75.19 59.26 i
30. UNIT AVAILABILITY FACTOR .65 75.19 59.26
21. UNIT CAP. FACTOR (USING MDC NET) .55 76.59 52.40 ,
22. UNIT CAP. FACTOR (USING DER NET) .51 71.55 50.07
33. UNIT FORCED OUTAGE RATE .00 .00 14.64
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Unit 1 is scheduled for 55 days Refueling Outage - 4/1/95-5/25/95.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

l INITIAL ELECTRICITY -------- .-------

COMMERCIAL OPERATION -------- --------

I 1.16 - 9 j

i

DOCKET NO. 050-0325 UNIT NME Brunsm ck I DATE May 1995 C&iPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH April 1995 METHOD OF LICENSEE DURATION SHUTTING 00WN EVENT SYSTEM CODE COMPONENI CAUSE & CORRECTIVE ACTION TO NO. DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) PREVENT RECURRENCE 95-017 950331 5 8.70 C 5 N/A ZZ ZZZZZZ Reducing power in preparation for refueling outage.95-018 950401 S 714.3 C 2 N/A ZZ ZZZZZZ M3nually scrammed Rx and manually tripped Main Turbine

- start of Refueling Outage.

1: M 2: Reason 3: Method 4: System Code: 5. Ccmoonent Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983.

restriction 6- Other per NUREG-1022. per NUREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative G- Operational error (explain)

H- Other (explain)

",CD&L'CO.

PLANT PERFORMANCE DATA SYSTEM PAGE 2 RUN DATE .05/04/95 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 R'UN TIME- 08:53:34 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON TELEPHONE (910)457-2756 APRIL. 1995 DAY AVG.' DAILY POWER LEVEL DA AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 765 17 770 3 725 18 769 3 770 19 768 ,

4 769 20 767 5 770 21 767 6 771 22 766 '

7 771 23 762 8 766 24 769 9 769 25 769 10 769 26 769 11 769 27 769 12 769 28 769 13 770 29 767 14 770 30 704 15 770 i 16 755 1.16 - 1 l

,'.CP&hQd .

PLANT PERFORMANCE DATA SYSTEM PAGE' 2 RUN-DATE 05/04/95 OPERATING DATA REPORT RPD36-000 RDN TIME 08:53:34 BRUNSWICK UNIT 2 DOCKET NO. 050-0324 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 2 NOTE 9
2. REPORTING PERIOD: APRIL 95

'3. LICENSED THERMAL POWER (MWT): 2436

4. NAMEPLATE RATING (GROSS MWE) : 867.0
5. DESIGN ELECTRICAL RATING . (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS FWE) : 782.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 754.0 ------------------------------- -
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, l GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :

-- 10 . REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 719.00 2879.00 170855.00
12. NUMBER OF HOURS REACTOR CRITICAL 719.00 2879.00 107434.70
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 719.00 2879.00 101996.71
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1743086.62 6970370.41 219220706.91
17. GROSS ELEC. ENERGY GEN. (MWH) 565810.00 2269395.00 70919016.00 ,
18. NET ELEC. ENERGY GENERATED (MWH) 549627.00 2206081.00 68039340.00
19. UNIT SERVICE FACTOR 100.00 100.00 59.70
20. UNIT. AVAILABILITY FACTOR 100.00 100.00 59.70
21. UNIT CAP. FACTOR (USING MDC NE".) 101.38 101.63 50.92
22. UNIT CAP. FACTOR (USING DER NET) 93.11 93.33 48.51 *
23. UNIT FORCED OUTAGE RATE .00 .00 11.77
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): ,.
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9 i

e' DOCKET NO. 050-0324 UNIT NAME Bn:nswick 11 DATE May 1995 COMPLETED BY Frances Harrison TELEPHONE 910-457-2756 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT K) NTH April 1995 METHOD OF LICENSEE DURATION SHUTTING DOWN EVENT SYSTEM CODE COMPONENT CAUSE & CORRECTIVE ACTION NO DATE TYPE (1) (HOURS) REASON (2) REACTOR (3) REPORT NO. (4) CODE (5) TO PREVENT RECURRENCE 95-022 950401 5 0 B 5 N/A SN LCV Reduced power to 60% for Large Valve Testing & RPF Testing.95-026  % 0430 5 0 B 5 N/A SN LCV Reduced power to 60% for lLargeValveTestingandRFP "A" Testing.

1: hpe 2: Reason 3: Method 4: System Code: 5. Comoonent Code F - Forced A- Equipment Failure 1- Manual Instructions for Instructions for 5 - Scheduled (explain) 2- Manual Scram preparation of data entry preparation of data B- Maintenance or test 3- Automatic scram sheets for Licensee Event entry sheets for LER C- Refueling 4- Continuations Report (LER) file from file from IEEE D- Regulatory 5- Load reductions IEEE Standard 805-1983. Standard 803A-1983.

restriction 6- Other per NUREG-1022. per NUREG-1022.

E- Operator Training & Section VI. Item 13.b Section VI. Item 13.c License Examination F- Administrative >

G- Operational error (explain)

H- Other (explain)

. _ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ - _ - _ - _ _ _ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ - -- - .,..- ~

< Attachment 3 List of Commitments The following commitments were made in this interaction. There are no other commitments, expressed or implied.

Resp Committed Commitment date or FACTS #

group outage 1.NONE 2.

3. .

1 4.

5.

l l

1 l

l l

l l

l l