IR 07200043/2021401

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401
ML21207A240
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 07/29/2021
From: Steven Orth
Plant Support Branch II
To: Corbin D
Entergy Nuclear Operations
References
IR 2021401
Download: ML21207A240 (6)


Text

July 29, 2021

SUBJECT:

BIG ROCK POINT - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200043/2021401

Dear Mr. Corbin:

On July 1, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Big Rock Point and discussed the results of this inspection with Mr. Otto Gustafson, Director, Regulatory and Performance Improvement and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Signed by Orth, Steven on 07/29/21 Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 07200043

Enclosure:

As stated

Inspection Report

Docket Number: 07200043 License Number: General License (ISFSI)

Report Number: 07200043/2021401 Enterprise Identifier: I-2021-401-0138 Licensee: Entergy Nuclear Operations, Inc.

Facility: Big Rock Point Location: Charlevoix, MI Inspection Dates: April 12, 2021 to July 01, 2021 Inspectors: G. Bonano, Physical Security Inspector J. Kutlesa, Physical Security Inspector Approved By: Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an inspection of the Physical Protection Program for the Independent Spent Fuel Storage Installation, in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the NRCs program for overseeing the safe storage of spent nuclear fuel. Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspection was conducted using the appropriate portions of the Inspection Procedure (IP) 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations. The procedure was declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations And for 10 CFR Part 71 Transportation Packagings. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

ISFSI Security

===81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations The inspectors evaluated the Physical Protection Program for the Independent Spent Fuel Storage Installation. The following elements were completed:

Physical Security Requirements for Independent Spent Fuel Storage Installations ===

(1) 02.01 (a-f)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 1, 2021, the inspectors presented the independent spent fuel storage installation security inspection results to Mr. Otto Gustafson, Director, Regulatory and Performance Improvement and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

81311 Miscellaneous ISFSI Security Systems Maintenance Log Weekly Testing 2018 - 2021

81311 Miscellaneous Security Officer Individual Qualification Record (6 Records 2018 - 2019

Reviewed)

81311 Miscellaneous Reviewing Official Designation 04/13/2020

81311 Miscellaneous Response Agreement with State of Michigan, Dept. of State 09/14/2020

Police, Lansing

81311 Miscellaneous Response Agreement with Office of the Sheriff, Charlevoix 05/03/2017

County

81311 Miscellaneous Big Rock Point 03/30/2021

Independent Spent Fuel Storage Installation (ISFSI)

Authorization Unescorted Personnel List

81311 Miscellaneous Entergy BRP Security Event Log 2018 - 2021

81311 Miscellaneous Weapon Maintenance Log Jan-Jun,

21

81311 Miscellaneous EA-02-104 Interim Compensatory Measures (ICM) 10/16/2002

81311 Miscellaneous EA-03-097 Additional Security Measures (ASM) for Access Authorization 08/18/2004

at ISFSIs in the Current Threat Environment

81311 Miscellaneous Volume 7F ISFSI Security Plan 7

81311 Miscellaneous Volume 7G ISFSI Security Implementing Procedures 9

81311 Procedures D2.3.7 Site Security 5

81311 Procedures WI-PRO-I-01 Maintenance Work Instruction - Inspection of ISFSI UPS 0

Battery Supplies

81311 Procedures WI-PRO-I-02 Work Instruction - ISFSI Alarm Test 2

81311 Procedures WI-PRO-I-03 Maintenance Work Instruction - Inspection of ISFSI Security 3

Cameras

81311 Procedures WI-PRO-I-04 Maintenance Work Instruction - ISFSI Microwave Readings 1

81311 Procedures WI-PRO-M-03 Maintenance Work Instruction - ISFSI Generator Quarterly 4

Load Test

81311 Self-Assessments 2020 Security Self-Assessment - BRP 03/31/2020

81311 Self-Assessments QA-3-7-9-14-16- Quality Assurance Audit Report 11/26/2019

18-2019-BRP-1

4