PNP 2023-013, 2022 Radiological Environmental Operating Report

From kanterella
Jump to navigation Jump to search
2022 Radiological Environmental Operating Report
ML23102A033
Person / Time
Site: Big Rock Point  File:Consumers Energy icon.png
Issue date: 04/12/2023
From: Fleming J
Holtec Decommissioning International
To:
Office of Nuclear Material Safety and Safeguards, Document Control Desk
References
HDI PNP 2023-013
Download: ML23102A033 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 HOLTEC Telephone (856) 797-0900 DECOMMISSION I NG Fax (856) 797-0909 INTERNATIONAL HDI PNP 2023-013 Technical Specification 6.6.2 April 12, 2023 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Big Rock Point Docket No. 50-155 and 72-043 Facility Operating License No. DPR-6

Subject:

2022 Radiological Environmental Operating Report In accordance with the requirements of Big Rock Point (BRP) Defueled Technical Specifications Section 6.6.2, Annual Radiological Environmental Operating Report, Holtec Decommissioning International, LLC (HDI) on behalf of Holtec Palisades, LLC (Holtec Palisades) is submitting the 2022 Radiological Environmental Operating Report for the BRP Independent Spent Fuel Storage Installation (ISFSI). The report was prepared in accordance with the requirements of 10 CFR 50, Appendix I, Section IV.B. The period covered by the enclosed report is January 1, 2022, through December 31, 2022.

This letter contains no new and no revised regulatory commitments.

Should you have any questions or require additional information, please contact Jim Miksa, Regulatory Assurance Engineer at (269) 764-2945.

Respectfully, Digitally signed by Jean A.

Jean A. Fleming Fleming Date: 2023.04.12 07:53:04 -04'00' Jean A. Fleming Vice President, of Licensing, Regulatory Affairs & PSA Holtec International

Enclosure:

Big Rock Point 2022 Radiological Environmental Operating Report Attachments: 1. Sample Collection Anomalies

2. Environmental Sample Schedule and Sample Location Maps
3. Radiological Environmental Monitoring Program Data for BRP ISFSI

HDI PNP 2023-013 Page 2 of 2 cc: NRC Region Ill Regional Administrator NRC Decommissioning Inspector - Big Rock Point NRC NMSS Project Manager - Big Rock Point

HDI PNP 2023-013 Enclosure Page 1 of 6 Enclosure to HDI PNP 2023-013 Big Rock Point 2022 Radiological Environmental Operating Report

HDI PNP 2023-013 Enclosure Page 2 of 6 Big Rock Point 2022 Radiological Environmental Operating Report I. Introduction The 2022 Big Rock Point (BRP) Annual Radiological Environmental Operating Report provides a summary and data interpretation of the BRP Radiological Environmental Monitoring Program (REMP) as conducted during the 2022 reporting period. Reporting requirements are detailed in the BRP Defueled Technical Specification 6.6.2 and Offsite Dose Calculation Manual (ODCM).

The BRP ODCM contains the requirements for the REMP. The radiological environmental monitoring sampling requirements are greatly reduced from the plants operating period and now only encompass Independent Spent Fuel Storage Installation (ISFSI) operations.

All samples were collected during the monitoring period with no anomalies.

Tables 1, 2, and 3 of this enclosure, provide a summary of 2022 BRP REMP sample requirements and results.

II. Discussion and Interpretation of Results A. Thermoluminescent Dosimeter (TLDs) - Gamma Dose The BRP Gamma Dose Assessment Program consists of eleven TLD locations: Four at the outside perimeter of the ISFSI (locations: BR-18, BR-19, BR-20, and BR-21), four at the ISFSI protected area fence line (locations: BR-22, BR-23, BR-24, and BR-25), and three control TLDs, approximately 13 miles out (locations: BR-5 Petoskey, BR-6 Boyne City, and BR-7 Ironton). These are the only TLDs required for ISFSI operation. The additional locations are no longer applicable because they no longer exist.

Environmental gamma doses are measured quarterly by placement of one TLD badge per designated location. Detailed sample station identification and location information is provided in Attachment 2.

For 2022, the average quarterly gamma readings were:

14.5 millirem for protected area fence TLDs, 12.7 millirem for ISFSI outside perimeter TLDs, and 13.0 millirem for the control TLD locations.

The comparative evaluation of the protected area fence, the ISFSI outside perimeter, and the control TLDs are all slightly less than that of 2020. All values are within the statistical standard deviation.

A comparative evaluation was also completed of the 2021 offsite control TLD data to the ISFSI outside perimeter TLD data. There was excellent correlation between the off-site control TLDs and the ISFSI outside perimeter TLDs. There was no significant difference between the 2021 and 2022 control data.

Each TLD badge contains a 4-chip TLD that meets ANSI N545-1975 requirements.

HDI PNP 2023-013 Enclosure Page 3 of 6 B. Air Samples The BRP REMP no longer requires that airborne surveillance be conducted.

C. Milk The BRP REMP no longer requires that milk samples be collected.

D. Lake Water The BRP REMP no longer requires that lake water samples be collected.

E. Drinking Water The BRP REMP no longer requires that drinking water samples be collected.

F. Crops The collection of food crops/vegetation is not required by the BRP REMP.

G. Sediment The BRP REMP no longer requires that well water samples be collected.

H. Aquatic Biota The collection of aquatic biota (algae and periphyton) is no longer required by the BRP REMP.

III. Assessment of BRP ISFSI Operational Environmental Impact Review and comparison of the 2022 BRP radiological environmental monitoring data to previous data shows that the parameters analyzed support the conclusion that ISFSI operations have had minimal environmental impact.

HDI PNP 2023-013 Enclosure Page 4 of 6 Table 1. Sampling and Analysis Summary Number of Samples Frequency of Medium Description Location(s) Type of Analysis Collected Analysis TLD BR-5, BR-6, BR-7, 18-25 BRP, 5-PT, Gamma Isotopic 44 Quarterly a BR-18-25 6-BC, 7-IR Lake Water 1 gallon composite 1-ST Tritium, 0 No Longer Required Gamma Isotopic Well Water 1 gallon Site Well Tritium, 0 No Longer Required grab/composite Gamma Isotopic Monitoring Wells 1 gallon grab MW 1-9 Tritium, 0 No Longer Required Gamma Isotopic Sediment Grab 1-ST, 24-STS, Gamma Isotopic 0 No Longer Required 25-STN, 26-LP Fish Grab 1-ST Discharge Gamma Isotopic 0 No Longer Required Table Notes a Only quarterly TLDs are required per Big Rock Point ODCM

HDI PNP 2023-013 Enclosure Page 5 of 6 Table 2. Sample Data Summary a Medium or Pathway Analysis Evaluated Lower Limit All Indicator Locations All Control Locations Nonroutine Sampled Versus Total Number of Detection Mean c Mean c Measurements (Units) Analyses Performed (LLD) b (Range) (Range)

Direct Radiation:

TLD - Protected Area TLD (quarterly) d e 16/16 1.0 16/16 14.5 12/12 13.0 None Fence (mR) (8-28) (8-17)

TLD - ISFSI Outside TLD (quarterly) d e 16/16 1.0 16/16 12.7 12/12 13.0 None Perimeter (mR) (7-18) (8-17)

Waterborne:

Lake Water Sample not (pCi/L) required Well Water Sample not (pCi/L) required Lake Sediment:

Sediment Sample not (pCi/g dry) required Biota:

Fish Sample not (pCi/g wet) required Crayfish Sample not (pCi/g wet) required Table Notes:

a Values for sample locations with the greatest annual mean are provided in Table 3.

b Nominal LLD as defined in the Big Rock Offsite Dose Calculation Manual Section I, Table I-3 and vendor analytical capabilities.

c Mean and range data reported are based upon detectable measurements.

d Quarterly TLD results are normalized for 91 days net.

e Quarterly TLDs are read quarterly. Quarterly measurements are compared to control measurements to evaluate compliance with 10 CFR 72.104.

The results for the ISFSI TLDs and the average of the control TLDs measured in 2022 are summarized in the Table.

HDI PNP 2023-013 Enclosure Page 6 of 6 Table 3. Reporting Results Greatest Mean Sampling Location Medium Type of Analysis Location High Low Mean TLD - Protected Area TLD (Quarterly) a b BRP-23 28 12 20.0 Fence (mR)

TLD - ISFSI Outside TLD (Quarterly) a b BRP-20 17 8 14.0 Perimeter (mR)

Lake Water No Longer Required (pCi/L)

Well Water No Longer Required (pCi/L Sediment No Longer Required (pCi/g dry)

Fish No Longer Required (pCi/g wet)

Crayfish No Longer Required (pCi/g wet)

Table Notes:

a Quarterly TLD results are normalized for 91 days net.

b Quarterly TLDs are read quarterly. Quarterly measurements are compared to control measurements to evaluate compliance with 10 CFR 72.104.

The results for the ISFSI TLDs and the average of the control TLDs measured in 2022 are summarized in the Table.

HDI PNP 2023-013 Page 1 of 1 Attachment 1 Sample Collection Anomalies None

HDI PNP 2023-013 Page 1 of 3 Attachment 2 Environmental Sample Schedule and Sample Location Maps TABLE 1-1 RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM Exposure Pathway Number of Representative Samples Sampling and Type and and/or Sample and Sample Locations a Collection frequency of Frequency Analysis

1. Direct Radiation b 11 monitoring stations either with two Quarterly Gamma dose or more TLDs or one instrument for quarterly measuring and recording dose rate continuously, placed as follows c:

a) Balance of stations (3) placed to serve as control stations b) Outside perimeter of ISFSI (4)d c) ISFSI protected area fence line (4)d

a. Deviations are permitted from the required sampling schedule if specimens are unobtainable due to hazardous conditions, seasonal unavailability, malfunction of automatic sampling equipment and other legitimate reasons. If specimens are unobtainable due to sampling equipment malfunction, every effort shall be made to complete corrective action prior to the end of the next sampling period. All deviations from the sampling schedule shall be documented in the Annual Radiological Environmental Operating Report pursuant to the Reporting Requirements of ODCM.

Alternative media and locations may be chosen for any particular pathway if designated locations or media are not available, and appropriate substitutions are made within 30 days in the radiological environmental monitoring program.

b. One or more instruments, such as a pressurized ion chamber, for measuring and recording dose rate continuously may be used in place of, or in addition to, integrating dosimeters. The background dosimetry requirement also may be met through use of dosimeters shared with another facility, or from data provided by another entity, such as the State of Michigan, as appropriate for this site.
c. For the purposes of this table, a TLD is considered to be one phosphor; two or more phosphors or phosphor readout zones in a packet are considered as two or more dosimeters.
d. TLDs designated for ISFSI only operation.

HDI PNP 2023-013 Page 2 of 3 Big Rock Point Environmental Sample Location Map N

BR-18 -

  • EJ*
  • BR-21 BR-25 BR-22 BR-23 E

w BR-24 BR-19 -

-BR-20

HDI PNP 2023-013 Page 3 of 3 Big Rock Point Control TLD Locations

- SR-6 (SC) soYNE CITY SR-7 (IR)

IRONTON

HDI PNP 2023-013 Page 1 of 5 Attachment 3 Radiological Environmental Monitoring Program (REMP) Data for Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI)

HDI PNP 2023-013 Page 2 of 5 Dosimetry Services Division Toll Free: (800) 2S1-3331 Pl I MIRION 1:CH OGI 26S2 McGaw Avenue Irvine, CA 92614 Tel.: (949) 296-1800 Fax: (949) 296-1144 www.mirion.com ACCOUNT LOCATION WEARER BADGE BODY CONTROL NO ID NO TYPE REGION WEAR DATE NAME SERIALNUM BADGE ID ID ANN EA L DATE PROCESS ID REC DATE El E2 E3 E4 mR/ Qtr 89567 OO000DPT 1 17 ARE 1/1/2022 BR-5 2247154 8011612 109 1/7/ 2022 251537 4/12/ 2022 8 7 12 12 8 89567 OO000DPT 2 17 ARE 1/1/2022 BR-6 2247155 8012191 109 1/7/ 2022 251537 4/ 12/ 2022 9 8 12 13 9 89567 OO000DPT 3 17 ARE 1/1/ 2022 BR-7 2247156 8005072 109 1/7/ 2022 251537 4/ 12/ 2022 8 8 12 13 8 89567 00000DPT 4 17 ARE 1/ 1/ 2022 BR-18 2247157 8008606 109 1/7/ 2022 251537 4/ 12/ 2022 7 7 11 12 7 89567 00000DPT 5 17 ARE 1/1/ 2022 BR-19 2247158 8006730 109 1/7/2022 251537 4/ 12/2022 9 8 12 14 8 89567 OO000DPT 6 17 ARE 1/1/2022 BR-20 2247159 8014800 109 1/7/ 2022 251537 4/ 12/ 2022 9 8 14 15 8 89567 OO000DPT 7 17 ARE 1/ 1/ 2022 BR-22 2247160 8008789 109 1/7/2022 251537 4/ 12/2022 8 8 13 14 8 89567 OO000DPT 8 17 ARE 1/ 1/2022 BR-23 2247161 8011235 109 1/7/2022 251537 4/12/2022 12 12 18 21 12 89567 OO000DPT 9 17 ARE 1/1/ 2022 BR-24 2247162 8005223 109 1/7/2022 251537 4/ 12/ 2022 9 9 15 15 9 89567 OO0OODPT 10 17 ARE 1/1/ 2022 BR-25 2247163 8011600 109 1/7/2022 251537 4/ 12/ 2022 8 8 13 14 8 89567 OO0OODPT 13 17 ARE 1/ 1/ 2022 BR-CTRLl 2247166 8014402 109 1/7/ 2022 251537 4/ 12/ 2022 6 6 9 11 6 89567 00000DPT 14 17 ARE 1/ 1/2022 BR-CTRL2 2247167 8011657 109 1/7/2022 251537 4/12/2022 5 5 10 11 5 89567 OO000DPT 15 17 ARE 1/1/2022 BR-21 2247168 8014405 109 1/7/2022 251537 4/ 12/ 2022 8 7 12 14 7 89567 OO000DPT 16 17 ARE 1/1/ 2022 BR-SP2 2247169 8011619 109 1/7/ 2022 251537 4/ 12/ 2022 6 5 10 11 6 89567 OO000DPT 17 17 ARE 1/1/ 2022 BR-SPl 2247170 8010634 109 1/7/2022 251537 4/ 12/ 2022 6 5 9 11 5 89567 OO000DPT 17 1/1/2022 CONTROL 2247153 8010014 109 1/7/2022 251537 4/ 12/ 2022 6 5 11 10 6 89567 0000lDPT 11 17 ARE 1/1/2022 BR-SHl 2246783 8010525 27 1/ 27/ 2022 251537 4/ 12/ 2022 4 4 9 11 4 89567 OO00lDPT 12 17 ARE 1/1/2022 BR-SH2 2246784 8009146 27 1/ 27/ 2022 251537 4/ 12/ 2022 4 4 8 9 4

HDI PNP 2023-013 Page 3 of 5 Pl Dosimetry Services Division Toll Free: (800) 251-3331 MIRION 2652 McGaw Avenue Tel.: (949) 296-1800 TlCHNt OGI Irvine, CA 92614 Fax: (949) 296-1144 w ww.mirion.com ACCOUNT LOCATION WEARER BADGE BODY CONTROL NO ID NO TYPE REGION WEAR DATE NAME SERIALNUM BADGE ID ID ANNEAL DATE PROCESS ID REC DATE E1 E2 E3 E4 mR/ Qtr 89567 OOOOODPT 1 17 ARE 4/ 1/ 2022 BR-5 2248748 8010646 111 3/ 17/ 2022 252391 7/ 13/ 2022 12 12 16 16 12 89567 OOOOODPT 2 17 ARE 4/ 1/ 2022 BR-6 2248749 8014680 111 3/ 17/ 2022 252391 7/ 13/ 2022 13 13 16 17 13 89567 OO0OODPT 3 17 ARE 4/ 1/ 2022 BR-7 2248750 8011777 111 3/ 17/ 2022 252391 7/ 13/ 2022 14 14 17 19 14 89567 OOOOODPT 4 17 ARE 4/ 1/ 2022 BR-18 2248751 8014448 111 3/ 17/2022 252391 7/ 13/ 2022 12 12 16 17 12 89567 OOOOODPT 5 17 ARE 4/ 1/ 2022 BR-19 2248752 8004843 111 3/ 17/ 2022 252391 7/ 13/ 2022 14 14 16 19 14 89567 OO0OODPT 6 17 ARE 4/ 1/ 2022 BR-20 2248753 8013586 111 3/ 17/ 2022 252391 7/ 13/ 2022 15 16 18 20 15 89567 OO0OODPT 7 17 ARE 4/ 1/ 2022 BR-22 2248754 8010600 111 3/ 17/ 2022 252391 7/ 13/ 2022 13 13 16 18 13 89567 OO0OODPT 8 17 ARE 4/ 1/ 2022 BR-23 2248755 8006146 111 3/ 17/ 2022 252391 7/ 13/ 2022 20 20 27 29 20 89567 OO0OODPT 9 17 ARE 4/ 1/ 2022 BR-24 2248756 8012552 111 3/17/ 2022 252391 7/ 13/ 2022 13 13 18 20 13 89567 OO0OODPT 10 17 ARE 4/ 1/ 2022 BR-25 2248757 8011713 111 3/17/ 2022 252391 7/ 13/2022 13 13 17 18 13 89567 OO0OODPT 11 17 ARE 4/ 1/ 2022 BR-SHl 2248758 8010053 111 3/ 17/ 2022 252391 7/ 13/2022 8 9 12 12 8 89567 OOOOODPT 12 17 ARE 4/ 1/ 2022 BR-SH2 2248759 8011449 111 3/ 17/ 2022 252391 7/ 13/ 2022 8 8 11 13 8 89567 OO0OODPT 13 17 ARE 4/ 1/ 2022 BR-CTRLl 2248760 8013499 111 3/ 17/ 2022 252391 7/ 13/ 2022 8 9 11 12 8 89567 OOOOODPT 14 17 ARE 4/ 1/ 2022 BR-CTRL2 2248761 8016154 111 3/ 17/ 2022 252391 7/13/ 2022 8 8 11 12 8 89567 OOOOODPT 15 17 ARE 4/ 1/ 2022 BR-21 2248762 8014694 111 3/17/2022 252391 7/13/2022 11 12 14 16 12 89567 OO0OODPT 16 17 ARE 4/ 1/ 2022 BR-SP2 2248763 8013682 111 3/17/ 2022 252391 7/ 13/ 2022 8 8 11 11 8 89567 OO0OODPT 17 17 ARE 4/ 1/ 2022 BR-SPl 2248764 8010871 111 3/ 17/ 2022 252391 7/ 13/ 2022 7 8 10 11 8 89567 OO0OODPT 17 4/ 1/ 2022 CONTROL 2248747 8013590 111 3/ 17/ 2022 252391 7/13/ 2022 8 8 13 14 8

HDI PNP 2023-013 Page 4 of 5 Dosimetry Services Divisio n Toll Free: (800) 251-3331 QI DOSIMETRY SERVICES A MIRION MEDICAL COMPANY 104 Union Valley Road Oak Ridge, TN 37830 Tel.: (949) 296-1800 Fax: (949) 296-1144 www.mirion.com ACCOUNT WEARER BADGE BODY CONTROL NO LOCATION ID NO TYPE REGION WEAROATE NAME SERIAL NUM BADGE ID ID ANNEA L DATE PROCESS ID REC DATE El E2 El E4 mR 89567 000OODPT 1 17 ARE 7/1/2022 BR-5 2250937 8004566 113 6/ 9/ 2022 253242 10/ 11/2022 14 14 15 17 14 89567 000OODPT 2 17 ARE 7/ 1/ 2022 BR-6 2250938 8009335 113 6/ 9/ 2022 253242 10/ 11/ 2022 14 14 17 19 14 89567 000OODPT 3 17 ARE 7/1/ 2022 BR-7 2250939 8013285 113 6/ 9/ 2022 253242 10/ 11/ 2022 15 15 18 18 15 89567 000OODPT 4 17 ARE 7/ 1/ 2022 BR-18 2250940 8008965 113 6/ 9/ 2022 253242 10/ 11/ 2022 13 13 13 15 13 89567 000OODPT 5 17 ARE 7/1/2022 BR-19 2250941 8007988 113 6/ 9/2022 253242 10/ 11/2022 15 16 17 19 15 89567 000OODPT 6 17 ARE 7/ 1/2022 BR-20 2250942 8007943 113 6/ 9/2022 25324 2 10/ 11/ 2022 17 17 17 20 17 89567 000OODPT 7 17 ARE 7/1/ 2022 BR-22 2250943 8005177 113 6/ 9/ 2022 253242 10/ 11/ 2022 13 13 18 22 13 89567 000OODPT 8 17 ARE 7/1/2022 BR-23 2250944 8008206 113 6/ 9/ 2022 253242 10/ 11/2022 20 21 27 32 20 89567 000OODPT 9 17 ARE 7/1/ 2022 BR-24 2250945 8007666 113 6/ 9/ 2022 253242 10/ 11/ 2022 12 11 15 17 11 89567 000OODPT 10 17 ARE 7/ 1/ 2022 BR-25 2250946 8010186 113 6/ 9/ 2022 25324 2 10/ 11/ 2022 13 13 17 19 13 89567 000OODPT 11 17 ARE 7/ 1/ 2022 BR-SHl 2250947 8016155 113 6/ 9/ 2022 25324 2 10/ 11/ 2022 9 9 13 14 9 89567 000OODPT 12 17 ARE 7/1/ 2022 BR*SH2 2250948 8008683 113 6/ 9/ 2022 253242 10/ 11/ 2022 9 9 11 14 9 89567 000OODPT 13 17 ARE 7/1/ 2022 BR-CTRLl 2250949 8006558 113 6/ 9/ 2022 253242 10/ 11/ 2022 9 9 11 12 9 89567 000OODPT 14 17 ARE 7/1/ 2022 BR-CTRL2 2250950 8012568 113 6/ 9/ 2022 253242 10/ 11/2022 9 10 12 14 10 89567 000OODPT 15 17 ARE 7/ 1/ 2022 BR-21 2250951 8003060 113 6/ 9/2022 253242 10/ 11/2022 12 13 15 18 12 89567 000OODPT 16 17 ARE 7/1/ 2022 BR-SP2 2250952 8006920 113 6/ 9/ 2022 253242 10/ 11/ 2022 8 9 11 13 8 89567 000OODPT 17 17 ARE 7/1/ 2022 BR-SPl 2250953 8005823 113 6/ 9/ 2022 253242 10/ 11/ 2022 9 9 12 13 9 89567 000OODPT 17 7/1/ 2022 CONTROL 2250936 8011922 113 6/ 9/ 2022 253242 10/ 11/ 2022 9 9 13 13 9

HDI PNP 2023-013 Page 5 of 5 Dosimetry Services Division Toll Free: (800) 251-3331 DOSIMETRY SERVICES 104 Union Valley Road Tel. : (949) 296-1800 A MIRION MEDIC.Al COMPANY Oak Ridge, TN 37830 Fax: (949) 296-1144 www.mirion.com ACCOUNT LOCATION WEARER BADGE BODY SERIAL CONTROL ANNEAL PROCESS NO ID NO TYPE REG ION WEAR DATE NAME NUM BADGE ID ID DATE ID REC DATE El E2 E3 E4 mR/Qtr 89567 00000DPT 1 17 ARE 10/1/2022 BR-5 2252437 8010258 115 9/19/2022 254139 1/12/2023 16 16 20 21 16 89567 00000DPT 2 17 ARE 10/1/2022 BR-6 2252438 8005519 115 9/19/2022 254139 1/12/2023 16 16 20 22 16 89567 00000DPT 3 17 ARE 10/1/2022 BR-7 2252439 8009748 115 9/19/2022 254139 1/12/2023 17 17 23 24 17 89567 00000DPT 4 17 ARE 10/1/2022 BR-18 2252440 8010849 115 9/19/2022 254139 1/12/2023 15 15 19 21 15 89567 00000DPT 5 17 ARE 10/1/2022 BR-19 2252441 8016159 115 9/19/2022 254139 1/12/2023 18 17 21 24 18 89567 00000DPT 6 17 ARE 10/1/2022 BR-20 2252442 8012041 115 9/19/2022 254139 1/12/2023 36 16 23 24 16 89567 00000DPT 7 17 ARE 10/1/2022 BR-22 2252443 8011248 115 9/19/2022 254139 1/12/2023 16 16 23 24 16 89567 00000DPT 8 17 ARE 10/1/2022 BR-23 2252444 8010206 115 9/19/2022 254139 1/12/2023 29 28 35 35 28 89567 00000DPT 9 17 ARE 10/1/2022 BR-24 2252445 8011758 115 9/19/2022 254139 1/12/2023 19 19 27 27 19 89567 00000DPT 10 17 ARE 10/1/2022 BR-25 2252446 8013258 115 9/19/2022 254139 1/12/2023 17 16 22 23 16 89567 00000DPT 11 17 ARE 1/1/2022 BR-SHl 2247164 8009025 109 1/7/2022 254139 1/12/2023 26 25 34 35 25 89567 00000DPT 11 17 ARE 10/1/2022 BR-SHl 2252447 8009626 115 9/19/2022 254139 1/12/2023 9 9 15 17 9 89567 00000DPT 12 17 ARE 1/1/2022 BR-SH2 2247165 8012313 109 1/7/2022 254139 1/12/2023 28 29 32 38 28 89567 00000DPT 12 17 ARE 10/1/2022 BR-SH2 2252448 8016059 115 9/20/2022 254139 1/12/2023 8 9 15 20 8 89567 00000DPT 13 17 ARE 10/1/2022 BR-CTRLl 2252449 8012057 115 9/20/2022 254139 1/12/2023 8 9 13 14 8 89567 00000DPT 14 17 ARE 10/1/2022 BR-CTRL2 2252450 8014551 115 9/20/2022 254139 1/12/2023 8 8 12 14 8 89567 00000DPT 15 17 ARE 10/1/2022 BR-21 2252451 8011726 115 9/20/2022 254139 1/12/2023 14 13 18 19 14 89567 00000DPT 16 17 ARE 10/1/2022 BR-SP2 2252452 8013327 115 9/20/2022 254139 1/12/2023 9 9 12 13 9 89567 00000DPT 17 17 ARE 10/1/2022 BR-SPl 2252453 8014835 115 9/20/2022 254139 1/12/2023 8 8 15 15 8 89567 00000DPT 17 10/1/2022 CONTROL 2252436 8010203 115 9/19/2022 254139 1/12/2023 8 8 24 17 8