MONTHYEARIR 05000155/20240012024-10-31031 October 2024 NRC Inspection Report No. 07200043/2024001; 05000155/2024001 Big Rock Point Independent Spent Fuel Storage Installation IR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 IR 07200043/20214012021-07-29029 July 2021 Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401 IR 05000155/20200012020-11-0202 November 2020 Inspection Report No. 07200043/2020001(DNMS) and 05000155/2020001(DNMS), Docket Nos. 07200043, 05000155, License No. DPR-6 IR 05000155/20180012018-11-26026 November 2018 NRC Inspection Report 07200043/2018001(DNMS); 05000155/2018001(DNMS) Big Rock Point Independent Spent Fuel Storage Installation IR 07200043/20184012018-05-31031 May 2018 Independent Spent Fuel Storage Installation - Security Inspection Report 07200043/2018401 (DRS-E.Bonano) IR 05000155/20170012017-05-17017 May 2017 Independent Spent Fuel Storage Installation, NRC Inspection Report 07200043/2017001 (DNMS) and 05000155/2017001(DNMS) IR 05000155/20140072014-10-31031 October 2014 IR 07200043/2014001 (DNMS) and 05000155/2014007 (Dnms), 10/7-8/2014, Big Rock Point Independent Spent Fuel Storage Installation IR 05000155/20120072013-03-11011 March 2013 Errata to Big Rock Point Independent Spent Fuel Storage Installation - Inspection Reports 07200043-12-001(DNMS) and 05000155-12-007(DNMS) IR 05000155/20120012013-01-0808 January 2013 IR 07200043-12-001 & 05000155-12-001, 12/18/2012, Big Rock Point Plant and Independent Spent Fuel Storage Installation IR 05000155/20124012012-12-18018 December 2012 IR 05000155-12-403, and 07200043-12-401, 11/29/2012, Big Rock Point ISFSI - Cover Letter IR 05000155/20124032012-12-18018 December 2012 IR 05000155-12-403, and 07200043-12-401, 11/29/2012, Big Rock Point ISFSI - Cover Letter IR 05000155/20080012008-11-13013 November 2008 IR 072-00043-08-001,050-00155-08-001(DNMS) on 10/22/08 - 10/24/08, Big Rock Point Independent Spent Fuel Storage Installation IR 05000155/20060022006-11-0202 November 2006 IR 05000155-06-002 (DNMS) and 07200043-06-001 (Dnms), on 10/18/06, Big Rock Point, Confirmatory Radiological Surveys and Observation of a Biennial Exercise of ISFSI Emergency Plan IR 05000155/20060012006-09-29029 September 2006 IR 05000155-06-001, on 05/08-09/2006, 06/02/2006, 06/13-15/2006, 07/05/2006, & 09/13/2006, Big Rock Point IR 05000155/20050052006-01-0505 January 2006 IR 05000155-05-005, on 10/18-20/2005, and 12/9-13/2005, Big Rock Point (DNMS) IR 05000155/20050042005-11-21021 November 2005 IR 05000155-05-004 on November 10, 2005 IR 05000155/20050022005-08-0303 August 2005 IR 05000155-05-002 (DNMS) & IR 07200043-05-001(DNMS), on 07/14/05, Big Rock Point, Routine Decommissioning Inspection IR 05000155/20050012005-04-0505 April 2005 IR 05000155-05-001(DNMS), on 01/19-21/2005 and 03/07-10/2005, Big Rock Point, Decommissioning Inspection IR 05000155/20040032005-01-18018 January 2005 IR 05000155-04-003 (Dnms), on 10/12/2004 - 10/15/2004, 11/01/2004 - 11/05/2004, 12/13/2004 - 12/16/2004 & 01/07/2005 and Notice of Violation - Big Rock Point, Decommissioning Activities IR 05000155/20040022004-10-0606 October 2004 IR 05000155-04-002, on 07/19-23/2004, 08/10-12/2004, 08/30/2004 - 09/03/2004 & 09/20-22/2004, Consumers Energy Co, Big Rock Point Restoration Project, Routine Decommissioning Inspections IR 05000155/20040012004-07-0202 July 2004 IR 05000155-04-001(DNMS), Big Rock Point, on 04/12/04 - 04/16/04, 05/11/04 - 05/14/04, and 06/01/04 - 06/04/04, Decommissioning Support Activities ML0407009702004-03-10010 March 2004 IR 05000155-03-007, on 12/01/2003 - 12/04/2003, 01/12/2004 - 01/15/2004 & 02/17/2004 - 02/20/2004, Big Rock Point Nuclear Plant Decommissioning Inspection IR 05000155/20030072004-03-10010 March 2004 Letter Form C. Miller to Kurt Haas Regarding Big Rock Point Inspection Report 05000155-03-007 IR 05000155/20030052003-11-0707 November 2003 IR 05000155-03-005, on 09/08/2003 - 10/09/2003, Big Rock Point, Decommissioning Inspection IR 05000155/20030042003-09-12012 September 2003 IR 05000155-03-004 (DNMS) Big Rock Point, 07/14/03 - 08/16/03. Review of Licensee'S Performance Related to Decommissioning Support Activities and Radiological Safety IR 07200043/20030032003-08-29029 August 2003 IR 07200043-03-003, on 8/12/03 Through 8/14/03, for Consumers Energy Co., Charlevoix, Mi; Security Measures for Independent Spent Fuel Storage Installations and Verification of Compliance with Interim Compensatory Measures Order IR 05000155/20030032003-07-16016 July 2003 IR 05000155-03-003, on 05/27/2003 - 06/19/2003, for Big Rock Point Nuclear Plant; Big Rock Point Restoration Project IR 05000155/20030022003-06-18018 June 2003 Letter from C. Miller to Kurt Haas Regarding Big Rock Point IR 05000155-03-002 & IR 07200043-03-002 ML0317002202003-06-18018 June 2003 IR 05000155-03-002 & IR 07200043-03-002(DNMS), on 03/17 - 05/19/2003, Big Rock Point. No Violations Noed ML0308508012003-03-25025 March 2003 Memo 03/25/03 Big Rock Point Re DRS Input to DNMS Report 50-155/03-02 IR 05000155/20030012003-03-12012 March 2003 IR 05000155-03-001(DNMS) on 01/06/03 and 02/21/03 for Big Rock Point, Reviewing Licensee'S Performance Related to Spent Fuel Safety and Radiological Safety IR 05000155/20020072003-01-16016 January 2003 IR 05000155-02-007, on 11/11/2002 - 12/23/2002, Big Rock Point. Big Rock Point Restoration Project IR 07200043/20020022003-01-0909 January 2003 IR 07200043-02-002, on 11/04/2002 - 12/13/2002, Big Rock Point ML0234506212002-12-0909 December 2002 Closeout of Confirmatory Action Letter RIII-01-003 Big Rock Point IR 05000155/20020052002-11-0707 November 2002 IR 05000155-02-005, on 09/10/2002 - 09/18/20022002, Big Rock Point, Facilities Management & Control & Radiological Safety IR 05000155/20020042002-08-22022 August 2002 IR 05000155-02-004(DNMS), on 07/29-08/07/02, Big Rock. Decommissioning Activities Inspected Were Being Adequately Conducted IR 05000155/20020022002-05-0303 May 2002 IR 05000155/2002-002(DNMS) - Big Rock Point IR 05000155/20020012002-02-25025 February 2002 IR 05000155/2002-001(DNMS), Big Rock Point. Inspection on 02/07/2002 Related to Facilities Management and Control and Spent Fuel Safety. No Violations Noted IR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities IR 05000155/19990041999-08-12012 August 1999 Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities Including Security, Spent Fuel Safety & Radiological Safety IR 05000155/19990031999-06-21021 June 1999 Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990021999-04-26026 April 1999 Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990011999-03-19019 March 1999 Insp Rept 50-155/99-01 on 990113-0225.One non-cited Violation Noted.Major Areas Inspected:Aspects of Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980091999-01-15015 January 1999 Insp Rept 50-155/98-09 on 981201-990112.No Violations Noted. Major Areas Inspected:Licensee Management & Control, Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000155/19980081998-12-0303 December 1998 Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted. Major Areas Inspected:Radiological Safety IR 05000155/19980071998-10-14014 October 1998 Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Physical Security,Spent Fuel Safety & Radiological Safety IR 05000155/19980061998-09-0303 September 1998 Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980031998-08-25025 August 1998 Discusses NRC Insp Rept 50-155/98-03 on 980527.Violations Noted.Insp Findings Documented in NRC Insp Rept Sent to Util by Ltr IR 05000155/19980051998-07-24024 July 1998 Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety 2024-02-05
[Table view] Category:Letter
MONTHYEARML24344A0692024-12-0909 December 2024 Proof of Financial Protection 10 CFR 140.15 IR 05000155/20240012024-10-31031 October 2024 NRC Inspection Report No. 07200043/2024001; 05000155/2024001 Big Rock Point Independent Spent Fuel Storage Installation PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-019, Updated Final Hazards Summary Report, Revision 192024-06-0404 June 2024 Updated Final Hazards Summary Report, Revision 19 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point PNP 2023-015, License Termination Plan, Revision 42023-05-16016 May 2023 License Termination Plan, Revision 4 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-013, 2022 Radiological Environmental Operating Report2023-04-12012 April 2023 2022 Radiological Environmental Operating Report 05000155/LER-1923-001, Human Performance Error Resulted in Compensatory Measures Not Properly Employed2023-04-11011 April 2023 Human Performance Error Resulted in Compensatory Measures Not Properly Employed L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-009, Report of Changes, Tests and Experiments and Summary of Commitment Changes2023-03-28028 March 2023 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2023-003, Independent Spent Fuel Storage Installation Radioactive Effluent Release Report2023-02-15015 February 2023 Independent Spent Fuel Storage Installation Radioactive Effluent Release Report L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1472022-08-0303 August 2022 & Big Rock Point Plant - Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Revision 2 ML22213A0092022-07-27027 July 2022 2022 Holtec Palisades, LLC and Holtec Decommissioning International, LLC ANI Certified Copy Endorsements for Palisades Nuclear Plant and Big Rock Point Nuclear Generating Plant ML22182A4982022-07-0101 July 2022 And Big Rock Point Plant, Indemnity Agreements ML22173A1732022-06-28028 June 2022 And Big Rock Point Plant - Issuance of Amendment Nos. 129 and 273 Order Approving Transfer of Licenses and Conforming License Amendments (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals ML22178A0772022-06-24024 June 2022 (HDI) Satisfactory Documentary Evidence Required Before the Planned Closing Date of the Purchase and Sale Transaction of Palisades Nuclear Plant and Big Rock Point Plant ML22096A3042022-05-0909 May 2022 And Big Rock Point Plant - New Information Regarding Order Approving Transfer of Licenses (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) PNP 2022-003, And Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 And Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML22088A2552022-03-29029 March 2022 Change for NRC Distribution Lists Re Entergys Vice President, Regulatory Assurance ML22087A5002022-03-28028 March 2022 And Palisades Nuclear Power Plant - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc ML22081A2992022-03-21021 March 2022 Entergy Operations, Inc - Summary of Property Damage Insurance Coverage ML22073A1892022-03-14014 March 2022 River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15) PNP 2022-001, 2021 ISFSI Annual Radioactive Effluent Release Report2022-02-24024 February 2022 2021 ISFSI Annual Radioactive Effluent Release Report ML22025A3422022-01-25025 January 2022 And Big Rock Point - Changes to Site Organization ML22021B6702022-01-21021 January 2022 And Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments ML21354A7452021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination ML21349A3742021-12-15015 December 2021 ISFSI, Decommissioning Funding Plans (10 CFR 72.30) ML21292A1452021-12-13013 December 2021 And Big Rock Point Plant - Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Letter) ML21302A0642021-10-29029 October 2021 And Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments IR 07200043/20214012021-07-29029 July 2021 Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401 PNP 2021-023, Biennial Update License Termination Plan2021-05-19019 May 2021 Biennial Update License Termination Plan ML21111A1782021-04-21021 April 2021 And Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report ML21054A1322021-04-14014 April 2021 U.S. NRC Analysis of Entergy Nuclear Operations, Incs Initial and Updated Decommissioning Funding Plans for the Big Rock Point, Indian Point, Pilgrim, Palisades, Fitzpatrick, and Vermont Yankee Independent Spent Fuel Storage Installations ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to ML21089A3222021-03-30030 March 2021 Entergy Operations, Inc and Entergy Nuclear Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML21084A8112021-03-25025 March 2021 Indian Point Nuclear Generating, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) 2024-08-02
[Table view] |
Text
ary 5, 2006
SUBJECT:
BIG ROCK POINT INSPECTION REPORT 050-00155/05-005(DNMS)
Dear Mr. Haas:
On December 13, 2005, the NRC completed inspection activities at the Big Rock Point Restoration Project. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, during onsite inspections on October 18 through 20 and December 9 through 13, 2005, the inspector evaluated decommissioning and demolition activities, management oversight of decommissioning activities, radioactive waste management, and radiological safety. At the conclusion of on-site inspections on October 20 and December 13, 2005, the inspector discussed the inspection findings with you and members of your staff.
This inspection consisted of an examination of decommissioning activities at the Big Rock Point Restoration Project as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA by G. McCann Acting for/
Jamnes L. Cameron, Chief Decommissioning Branch Docket No.: 050-00155 License No.: DPR-6
Enclosure:
Inspection Report 050-00155/05-005(DNMS)
REGION III==
Docket No.: 050-00155 License No.: DPR-6 Report No.: 050-00155/05-005(DNMS)
Licensee: Consumers Energy Company Facility: Big Rock Point Restoration Project Location: 10269 U.S. 31 North Charlevoix, MI 49720 Dates: October 18 through 20, 2005, and December 9 through 13, 2005 Inspector: William G. Snell, Senior Health Physicist Approved by: Jamnes L. Cameron, Chief Decommissioning Branch, Division of Nuclear Materials Safety
EXECUTIVE SUMMARY Consumers Energy Company Big Rock Point Restoration Project NRC Inspection Report 050-00155/05-005(DNMS)
This routine decommissioning inspection involved a review of the Consumers Energy Companys and its contractors performance related to decommissioning and demolition activities, management oversight of decommissioning activities, radioactive waste management, and radiological safety. During this inspection period, major activities included dismantlement of the containment sphere and demolitions to soften the containment interior concrete.
Decommissioning Performance and Status Review
- The inspector determined that the licensees meetings, pre-job briefs, and post-job debriefs, were properly focused and work was performed in a safe manner. The licensee and its contracted workforce conducted the sphere dismantlement and the controlled detonations safely and in accordance with license requirements, and with good radiological work practices. (Section 1.0)
Solid Radioactive Waste Management
- The inspector determined that the licensee adequately controlled sections of the containment sphere as it was dismantled. (Section 2.0)
Inspection of Final Surveys
- The inspector determined that the licensees documentation of final status surveys of the dismantled sections of the containment sphere were complete and consistent with procedural requirements and release criteria. (Section 3.0)
Occupational Radiation Exposure
- The inspector concluded that the radiological work practices of the licensee and contractor staff were adequate, and that the licensee employed adequate radiological controls associated with the three detonations to soften the containment building concrete. (Section 4.0)
Report Details1 1.0 Decommissioning Performance and Status Review (71801)
1.1 Inspection Scope The inspector attended and observed the conduct of licensee meetings regarding decommissioning activities, including daily management team meetings, a sphere dismantlement pre-job brief, and containment interior concrete demolition pre-job briefs and post-job debriefs. The inspector performed plant tours to evaluate decommissioning activities and verify that the licensee and its contracted workforce conducted work safely and in accordance with license requirements, and that radioactively contaminated material was controlled.
1.2 Observations and Findings The licensees meetings were well attended, addressed pertinent work activities, adequately covered issues and concerns, and ensured that expectations were communicated to the work force. Although the radiological source term at the site has significantly decreased, licensee management continues to stress the need for workers to employ good radiological work practices.
During site tours, licensee staff were observed beginning the dismantlement of the containment sphere and conducting two controlled detonations to soften the containment interior concrete. As part of these activities the licensee established and maintained radiological and safety boundaries, and performed radiological surveys and air sampling. The licensee implemented required work practices and key activities were effectively coordinated with all onsite work groups.
1.3 Conclusion The inspector determined that the licensees meetings, pre-job briefs, and post-job debriefs, were properly focused and work was performed in a safe manner. The licensee and its contracted workforce conducted the sphere dismantlement and the controlled detonations safely and in accordance with license requirements, and with good radiological work practices.
2.0 Solid Radioactive Waste Management (86750)
2.1 Inspection Scope The inspector reviewed the licensees control of sections of the containment sphere as it was dismantled.
A list of acronyms used in the report is included at the end of the Report Details.
2.2 Observations and Findings As the steel containment sphere was torch cut and dismantled, the removed sections were surveyed for radiological contamination, cut into smaller pieces, and segregated based on the level of PCB (polychlorinatedbiphenyl) contamination in the paint on each individual piece. Radiological surveys conducted on each piece verified that the sphere was minimally contaminated. The sections containing PCB in the paint in excess of 50 parts per million will be disposed of at a disposal facility licensed by the State of Michigan to receive waste containing low levels of radioactivity as well as PCB contamination. The rest of the sphere pieces will be transported to the local landfill for disposal.
2.3 Conclusion The inspector determined that the licensee adequately controlled sections of the containment sphere as it was dismantled.
3.0 Inspection of Final Surveys (83801)
3.1 Inspection Scope The inspector evaluated final status survey documentation to verify that the dismantled sections of the containment sphere had been decontaminated to radiological levels consistent with procedural requirements and release criteria. The inspector reviewed the Containment Shell Bulk Monitoring Release (BMR) work package 2005-0069, for Sections 1.1-1.3, 8.1-8.4, 20.1-20.3, 37.1-37.5, 52.1-52.5, and 86.1-86.12.
3.2 Observations and Findings The reviewed work packages were complete, clearly identified the areas being surveyed, documented survey results as required, and contained appropriate sign-offs.
The survey results indicated that all sections reviewed contained radiological contamination below the release criteria of 5,000 disintegrations per minute per 100 square centimeters.
3.3 Conclusion The inspector determined that the licensees documentation of final status surveys of the dismantled sections of the containment sphere were complete and consistent with procedural requirements and release criteria.
4 .0 Occupational Radiation Exposure (83750)
4.1 Inspection Scope The inspector observed the radiological work practices of licensee and contractor staff who conducted decommissioning activities to verify proper radiological work practices were employed. The inspector evaluated the radiological precautions taken by the licensee in regard to the controlled detonations to soften the containment interior concrete.
4.2 Observations and Findings The inspector observed that workers adhered to the radiological work practices and expectations employed at Big Rock Point. Workers leaving radiologically controlled areas used the portable and/or fixed radiation monitoring equipment as required.
Due to the significant amount of scabbling that was done on the concrete surfaces in the containment building, the licensee did not expect a radiological airborne problem to exist as a result of the three concrete softening detonations that were to occur. However, to minimize this risk, the holes that were drilled in the concrete to hold the explosive charges were placed away from areas where imbedded piping existed, even though these pipes were previously cleaned and grouted. In addition, air samples were collected immediately following each detonation to determine whether any airborne radioactivity existed. No airborne radioactivity was detected by any of the air samples collected. Following the detonations, radiation protection workers conducted radiological surveys to determine the radiations levels in the areas where the detonations occurred. No relevant changes in the area dose rates occurred as a result of the detonations.
4.3 Conclusion The inspector concluded that the radiological work practices of the licensee and contractor staff were adequate, and that the licensee employed adequate radiological controls associated with the three detonations to soften the containment building concrete.
5.0 Exit Meeting Summary The inspector presented preliminary inspection findings to members of the licensee management team at the conclusion of onsite inspection activities on October 20 and December 13, 2005. The licensee did not identify any documents or processes reviewed by the inspector as proprietary.
PARTIAL LIST OF PERSONS CONTACTED Consumers Energy Company
- Kurt Haas, Site General Manager
- Ken Pallagi, Radiation Protection & Environmental Services Manager
- William Trubilowicz, Cost, Scheduling and Purchase Manager
- Persons present at the exit meetings.
INSPECTION PROCEDURES USED IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 83801 Inspection of Final Surveys at Permanently Shutdown Reactors IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials
ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed None Discussed None PARTIAL LIST OF DOCUMENTS REVIEWED Licensee documents reviewed and utilized during the course of this inspection are specifically identified in the Report Details above.
LIST OF ACRONYMS USED ADAMS Agencywide Documents Access and Management System BMR Bulk Monitoring Release DNMS Division of Nuclear Materials Safety NRC Nuclear Regulatory Commission PCB Polychlorinatedbiphenyl 6