ML22088A255

From kanterella
Jump to navigation Jump to search
Change for NRC Distribution Lists Re Entergys Vice President, Regulatory Assurance
ML22088A255
Person / Time
Site: Palisades, Grand Gulf, Arkansas Nuclear, River Bend, Waterford, Big Rock Point  Entergy icon.png
Issue date: 03/29/2022
From: Couture P
Entergy Nuclear Operations, Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO2022-00010
Download: ML22088A255 (2)


Text

~ entergy CNRO2022-0001 O March 29, 2022 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Phil Couture Senior Manager Fleet Regulatory Assurance - Licensing 601-368-5102

Subject:

Change for NRG Distribution Lists regarding Entergy's Vice President, Regulatory Assurance Arkansas Nuclear One, Units 1 and 2 NRG Docket Nos. 50-313 and 50-368 Renewed Facility Operating License Nos. DPR-51 and NPF-6 Palisades Nuclear Power Plant NRG Docket No. 50-255 Renewed Facility Operating License No. DPR-20 River Bend Station, Unit 1 NRG Docket No. 50-458 Renewed Facility Operating License No. NPF-47 Grand Gulf Nuclear Station, Unit 1 NRG Docket No. 50-416 Renewed Facility Operating License No. NPF-29 Big Rock Point Nuclear Plant NRG Docket No. 50-155 Facility Operating License No. DPR-6 Waterford Steam Electric Station, Unit 3 NRG Docket No. 50-382 Renewed Facility Operating License No. NPF-38 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc. (Entergy) request the following change be made to NRG distribution lists:

Revise Addressee:

From -

Mandy Halter Vice President, Regulatory Assurance Entergy Services, LLC 1340 Echelon Parkway Jackson, MS 39213 Email - mhalter@entergy.com To -

Ronald Gaston Vice President, Regulatory Assurance Entergy Services, LLC 1340 Echelon Parkway Jackson, MS 39213 Email - rgasto1@entergy.com Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., 1340 Echelon Parkway, Jackson, MS 39213

GNRO2022-00010 Page 2 of 2 Mr. Ronald Gaston assumed the role of Vice President (VP), Regulatory Assurance for the Entergy fleet effective on February 21, 2022. This change applies to future correspondence to the VP, Regulatory Assurance and includes distribution of correspondence containing either Official Use Only - Security Related Information or Safeguards Information addressed to Entergy Operations, Inc., and Entergy Nuclear Operations, Inc.

This submittal contains no new regulatory commitments. Should you have any questions or require additional information, please contact me at (601) 368-5102.

Respectfully, Phil Couture PLG/gpn cc:

NRG Region Ill-Regional Administrator NRG Region IV-Regional Administrator NRG Senior Resident Inspector-Arkansas Nuclear One, Units 1 and 2 NRG Senior Resident Inspector-Grand Gulf Nuclear Station, Unit 1 NRG Senior Resident Inspector-Palisades Nuclear Plant NRG Senior Resident Inspector-River Bend Station, Unit 1 NRG Senior Resident Inspector-Waterford Steam Electric Station, Unit 3 NRG Project Manager-Entergy Fleet