MONTHYEARIR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (Brp) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 IR 07200043/20214012021-07-29029 July 2021 Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401 IR 05000155/20200012020-11-0202 November 2020 Inspection Report No. 07200043/2020001(DNMS) and 05000155/2020001(DNMS), Docket Nos. 07200043, 05000155, License No. DPR-6 IR 05000155/20180012018-11-26026 November 2018 NRC Inspection Report 07200043/2018001(DNMS); 05000155/2018001(DNMS) Big Rock Point Independent Spent Fuel Storage Installation IR 07200043/20184012018-05-31031 May 2018 Independent Spent Fuel Storage Installation - Security Inspection Report 07200043/2018401 (DRS-E.Bonano) IR 05000155/20170012017-05-17017 May 2017 Independent Spent Fuel Storage Installation, NRC Inspection Report 07200043/2017001 (DNMS) and 05000155/2017001(DNMS) IR 05000155/20140072014-10-31031 October 2014 IR 07200043/2014001 (DNMS) and 05000155/2014007 (Dnms), 10/7-8/2014, Big Rock Point Independent Spent Fuel Storage Installation IR 05000155/20120072013-03-11011 March 2013 Errata to Big Rock Point Independent Spent Fuel Storage Installation - Inspection Reports 07200043-12-001(DNMS) and 05000155-12-007(DNMS) IR 05000155/20120012013-01-0808 January 2013 IR 07200043-12-001 & 05000155-12-001, 12/18/2012, Big Rock Point Plant and Independent Spent Fuel Storage Installation IR 05000155/20124012012-12-18018 December 2012 IR 05000155-12-403, and 07200043-12-401, 11/29/2012, Big Rock Point ISFSI - Cover Letter IR 05000155/20124032012-12-18018 December 2012 IR 05000155-12-403, and 07200043-12-401, 11/29/2012, Big Rock Point ISFSI - Cover Letter IR 05000155/20080012008-11-13013 November 2008 IR 072-00043-08-001,050-00155-08-001(DNMS) on 10/22/08 - 10/24/08, Big Rock Point Independent Spent Fuel Storage Installation IR 05000155/20060022006-11-0202 November 2006 IR 05000155-06-002 (DNMS) and 07200043-06-001 (Dnms), on 10/18/06, Big Rock Point, Confirmatory Radiological Surveys and Observation of a Biennial Exercise of ISFSI Emergency Plan IR 05000155/20060012006-09-29029 September 2006 IR 05000155-06-001, on 05/08-09/2006, 06/02/2006, 06/13-15/2006, 07/05/2006, & 09/13/2006, Big Rock Point IR 05000155/20050052006-01-0505 January 2006 IR 05000155-05-005, on 10/18-20/2005, and 12/9-13/2005, Big Rock Point (DNMS) IR 05000155/20050042005-11-21021 November 2005 IR 05000155-05-004 on November 10, 2005 IR 05000155/20050022005-08-0303 August 2005 IR 05000155-05-002 (DNMS) & IR 07200043-05-001(DNMS), on 07/14/05, Big Rock Point, Routine Decommissioning Inspection IR 05000155/20050012005-04-0505 April 2005 IR 05000155-05-001(DNMS), on 01/19-21/2005 and 03/07-10/2005, Big Rock Point, Decommissioning Inspection IR 05000155/20040032005-01-18018 January 2005 IR 05000155-04-003 (Dnms), on 10/12/2004 - 10/15/2004, 11/01/2004 - 11/05/2004, 12/13/2004 - 12/16/2004 & 01/07/2005 and Notice of Violation - Big Rock Point, Decommissioning Activities IR 05000155/20040022004-10-0606 October 2004 IR 05000155-04-002, on 07/19-23/2004, 08/10-12/2004, 08/30/2004 - 09/03/2004 & 09/20-22/2004, Consumers Energy Co, Big Rock Point Restoration Project, Routine Decommissioning Inspections IR 05000155/20040012004-07-0202 July 2004 IR 05000155-04-001(DNMS), Big Rock Point, on 04/12/04 - 04/16/04, 05/11/04 - 05/14/04, and 06/01/04 - 06/04/04, Decommissioning Support Activities IR 05000155/20030072004-03-10010 March 2004 Letter Form C. Miller to Kurt Haas Regarding Big Rock Point Inspection Report 05000155-03-007 ML0407009702004-03-10010 March 2004 IR 05000155-03-007, on 12/01/2003 - 12/04/2003, 01/12/2004 - 01/15/2004 & 02/17/2004 - 02/20/2004, Big Rock Point Nuclear Plant Decommissioning Inspection IR 05000155/20030052003-11-0707 November 2003 IR 05000155-03-005, on 09/08/2003 - 10/09/2003, Big Rock Point, Decommissioning Inspection IR 05000155/20030042003-09-12012 September 2003 IR 05000155-03-004 (DNMS) Big Rock Point, 07/14/03 - 08/16/03. Review of Licensee'S Performance Related to Decommissioning Support Activities and Radiological Safety IR 07200043/20030032003-08-29029 August 2003 IR 07200043-03-003, on 8/12/03 Through 8/14/03, for Consumers Energy Co., Charlevoix, Mi; Security Measures for Independent Spent Fuel Storage Installations and Verification of Compliance with Interim Compensatory Measures Order IR 05000155/20030032003-07-16016 July 2003 IR 05000155-03-003, on 05/27/2003 - 06/19/2003, for Big Rock Point Nuclear Plant; Big Rock Point Restoration Project ML0317002202003-06-18018 June 2003 IR 05000155-03-002 & IR 07200043-03-002(DNMS), on 03/17 - 05/19/2003, Big Rock Point. No Violations Noed IR 05000155/20030022003-06-18018 June 2003 Letter from C. Miller to Kurt Haas Regarding Big Rock Point IR 05000155-03-002 & IR 07200043-03-002 ML0308508012003-03-25025 March 2003 Memo 03/25/03 Big Rock Point Re DRS Input to DNMS Report 50-155/03-02 IR 05000155/20030012003-03-12012 March 2003 IR 05000155-03-001(DNMS) on 01/06/03 and 02/21/03 for Big Rock Point, Reviewing Licensee'S Performance Related to Spent Fuel Safety and Radiological Safety IR 05000155/20020072003-01-16016 January 2003 IR 05000155-02-007, on 11/11/2002 - 12/23/2002, Big Rock Point. Big Rock Point Restoration Project IR 07200043/20020022003-01-0909 January 2003 IR 07200043-02-002, on 11/04/2002 - 12/13/2002, Big Rock Point ML0234506212002-12-0909 December 2002 Closeout of Confirmatory Action Letter RIII-01-003 Big Rock Point IR 05000155/20020052002-11-0707 November 2002 IR 05000155-02-005, on 09/10/2002 - 09/18/20022002, Big Rock Point, Facilities Management & Control & Radiological Safety IR 05000155/20020042002-08-22022 August 2002 IR 05000155-02-004(DNMS), on 07/29-08/07/02, Big Rock. Decommissioning Activities Inspected Were Being Adequately Conducted IR 05000155/20020022002-05-0303 May 2002 IR 05000155/2002-002(DNMS) - Big Rock Point IR 05000155/20020012002-02-25025 February 2002 IR 05000155/2002-001(DNMS), Big Rock Point. Inspection on 02/07/2002 Related to Facilities Management and Control and Spent Fuel Safety. No Violations Noted IR 05000155/19990051999-09-30030 September 1999 Insp Rept 50-155/99-05 on 990731-0921,site Insp & 990929 Public Meeting.No Violations Noted.Major Areas Inspected: Routine Decommissioning Insp Covered Aspects of Facility Mgt & Control & Decommissioning Support Activities IR 05000155/19990041999-08-12012 August 1999 Insp Rept 50-155/99-04 on 990609-0730.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities Including Security, Spent Fuel Safety & Radiological Safety IR 05000155/19990031999-06-21021 June 1999 Insp Rept 50-155/99-03 on 990416-0608.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990021999-04-26026 April 1999 Insp Rept 50-155/99-02 on 990226-0415.No Violations Noted. Major Areas Inspected:Aspects of Facility Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19990011999-03-19019 March 1999 Insp Rept 50-155/99-01 on 990113-0225.One non-cited Violation Noted.Major Areas Inspected:Aspects of Facility Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980091999-01-15015 January 1999 Insp Rept 50-155/98-09 on 981201-990112.No Violations Noted. Major Areas Inspected:Licensee Management & Control, Decommissioning Support Activities,Sf Safety & Radiological Safety IR 05000155/19980081998-12-0303 December 1998 Insp Rept 50-155/98-08 on 980827-1130.No Violations Noted. Major Areas Inspected:Radiological Safety IR 05000155/19980071998-10-14014 October 1998 Insp Rept 50-155/98-07 on 980827-1007.No Violations Noted. Major Areas Inspected:Facility Mgt & Control,Physical Security,Spent Fuel Safety & Radiological Safety IR 05000155/19980061998-09-0303 September 1998 Insp Rept 50-155/98-06 on 980716-0826.No Violations Noted. Major Areas Inspected:Aspects of Licensee Mgt & Control, Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980051998-07-24024 July 1998 Insp Rept 50-155/98-05 on 980528-0715.No Violations Noted. Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety IR 05000155/19980041998-07-0808 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-155/98-04 IR 05000155/19980031998-06-16016 June 1998 Insp Rept 50-155/98-03 on 980407-0527.Violation Noted.Major Areas Inspected:Licensee Mgt & Control,Decommissioning Support Activities,Spent Fuel Safety & Radiological Safety 2024-02-05
[Table view] Category:Letter
MONTHYEARIR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (Brp) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point PNP 2023-015, License Termination Plan, Revision 42023-05-16016 May 2023 License Termination Plan, Revision 4 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-013, 2022 Radiological Environmental Operating Report2023-04-12012 April 2023 2022 Radiological Environmental Operating Report ML23101A1172023-04-11011 April 2023 Human Performance Error Resulted in Compensatory Measures Not Properly Employed L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-009, Report of Changes, Tests and Experiments and Summary of Commitment Changes2023-03-28028 March 2023 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2023-003, Independent Spent Fuel Storage Installation Radioactive Effluent Release Report2023-02-15015 February 2023 Independent Spent Fuel Storage Installation Radioactive Effluent Release Report L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1472022-08-0303 August 2022 & Big Rock Point Plant - Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Revision 2 ML22213A0092022-07-27027 July 2022 2022 Holtec Palisades, LLC and Holtec Decommissioning International, LLC ANI Certified Copy Endorsements for Palisades Nuclear Plant and Big Rock Point Nuclear Generating Plant ML22182A4982022-07-0101 July 2022 and Big Rock Point Plant, Indemnity Agreements ML22173A1732022-06-28028 June 2022 and Big Rock Point Plant - Issuance of Amendment Nos. 129 and 273 Order Approving Transfer of Licenses and Conforming License Amendments (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals ML22178A0772022-06-24024 June 2022 (HDI) Satisfactory Documentary Evidence Required Before the Planned Closing Date of the Purchase and Sale Transaction of Palisades Nuclear Plant and Big Rock Point Plant ML22096A3042022-05-0909 May 2022 and Big Rock Point Plant - New Information Regarding Order Approving Transfer of Licenses (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) PNP 2022-003, and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 and Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML22088A2552022-03-29029 March 2022 Change for NRC Distribution Lists Re Entergy'S Vice President, Regulatory Assurance ML22087A5002022-03-28028 March 2022 and Palisades Nuclear Power Plant - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc ML22081A2992022-03-21021 March 2022 Entergy Operations, Inc - Summary of Property Damage Insurance Coverage ML22073A1892022-03-14014 March 2022 River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15) PNP 2022-001, 2021 ISFSI Annual Radioactive Effluent Release Report2022-02-24024 February 2022 2021 ISFSI Annual Radioactive Effluent Release Report ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22021B6702022-01-21021 January 2022 and Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments ML21354A7452021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination ML21349A3742021-12-15015 December 2021 ISFSI, Decommissioning Funding Plans (10 CFR 72.30) ML21292A1452021-12-13013 December 2021 and Big Rock Point Plant - Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Letter) ML21302A0642021-10-29029 October 2021 and Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments IR 07200043/20214012021-07-29029 July 2021 Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401 PNP 2021-023, Biennial Update License Termination Plan2021-05-19019 May 2021 Biennial Update License Termination Plan PNP 2021-015, and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report2021-04-21021 April 2021 and Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report ML21054A1322021-04-14014 April 2021 U.S. NRC Analysis of Entergy Nuclear Operations, Inc'S Initial and Updated Decommissioning Funding Plans for the Big Rock Point, Indian Point, Pilgrim, Palisades, Fitzpatrick, and Vermont Yankee Independent Spent Fuel Storage Installations ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to ML21089A3222021-03-30030 March 2021 Entergy Operations, Inc and Entergy Nuclear Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) ML21084A8112021-03-25025 March 2021 Indian Point Nuclear Generating, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) PNP 2021-009, 2020 ISFSI Annual Radioactive Effluent Release Report2021-02-25025 February 2021 2020 ISFSI Annual Radioactive Effluent Release Report ML21022A2212021-02-0505 February 2021 Letter to Senator Charles Schumer from Margaret Doane Response for NRC to Reconsider Its Decision to Not Allow for a Public Hearing in the Transfer of Indian Point'S License ML21012A0312021-02-0101 February 2021 and Big Rock Point Plant - Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing ML21011A0672021-02-0101 February 2021 Proposed Post-Shutdown Decommissioning Activities Report with Site-Specific Decommissioning Cost Estimate PNP 2020-042, and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments2020-12-23023 December 2020 and Big Rock Point Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments PNP 2020-041, Independent Spent Fuel Storage Installation Radioactive Effluent Release Report2020-12-0909 December 2020 Independent Spent Fuel Storage Installation Radioactive Effluent Release Report 2024-02-05
[Table view] |
Text
uly 16, 2003
SUBJECT:
BIG ROCK POINT INSPECTION REPORT 05000155/2003-003(DNMS)
Dear Mr. Haas:
On June 19, 2003, the NRC completed an inspection at the Big Rock Point Nuclear Plant. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. Specifically, the inspectors evaluated decommissioning support activities and radiological safety. At the conclusion of on-site inspections on May 30 and June 19, 2003, the inspectors discussed the inspection findings with you and members of your staff.
This inspection consisted of an examination of decommissioning activities at the Big Rock Point Nuclear Plant as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations of activities in progress, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations. The decommissioning activities reviewed were being conducted in accordance with applicable regulations and license conditions.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Christopher G. Miller, Chief Decommissioning Branch Docket No. 05000155 License No. DPR-6
Enclosure:
Inspection Report 05000155/2003-003(DNMS)
See Attached Distribution
DOCUMENT NAME: C:\ORPCheckout\FileNET\ML031980497.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII RIII NAME Snell:mb Bonano Bonano Miller for DATE 07/16/03 07/17/03 07/16 /03 OFFICIAL RECORD COPY
REGION III==
Docket No. 05000155 License No. DPR-06 Report No. 05000155/2003-003(DNMS)
Licensee: Consumers Energy Company Facility: Big Rock Point Nuclear Plant Location: 10269 U.S. 31 North Charlevoix, MI 49720 Dates: May 27 - June 19, 2003 Inspector: William Snell, Health Physics Manager Gene Bonano, Radiation Protection Specialist Approved by: Christopher G. Miller, Chief Decommissioning Branch Division of Nuclear Materials Safety
EXECUTIVE SUMMARY Big Rock Point Restoration Project NRC Inspection Report 05000155/2003-003(DNMS)
This routine decommissioning inspection involved review of the licensees performance related to decommissioning support activities and radiological safety. During this inspection period, major activities included cleaning and draining the spent fuel pool (SFP) and preparations for removal of the reactor vessel and steam drum. Overall, the licensees major decommissioning activities were properly monitored and controlled.
Decommissioning Support Activities
The inspectors determined that the licensee conducted decommissioning activities in accordance with license requirements and in a safe manner. Licensee personnel were knowledgeable of the radiological conditions in their work areas. Workers demonstrated effective communications and work practices. Radiation workers wore dosimetry as required. Workers were attentive to industrial safety requirements. The material condition of facilities and equipment was acceptable. Housekeeping was adequate.
(Section 1.1)
Radiological Safety
The licensees implementation of its radioactive waste program was adequate.
Radioactive waste being transported for disposal met applicable regulatory requirements. The licensee maintained adequate controls for the storage of solid low level radioactive waste (LLRW). (Section 2.1)
The licensees staff demonstrated an appropriate knowledge of and compliance with procedures associated with the identification of damaged electronic dosimetry.
(Section 2.2)
Licensee personnel were effectively using Radiation Work Permits (RWP) to control work activities and to maintain doses as-low-as-reasonably-achievable (ALARA).
(Section 2.3)
Report Details1 1.0 Decommissioning Support Activities 1.1 Status of Decommissioning (71801)
a. Inspection Scope The inspectors evaluated decommissioning activities to verify that the licensee was conducting work in accordance with licensed requirements and in a safe manner.
b. Observations and Findings The inspectors conducted numerous site tours to observe licensee staff conducting decommissioning activities, including vacuuming and cleaning of the Spent Fuel Pool (SFP), cutting and re-threading of reactor head stud bolts, moving material with the overhead crane, and the performance of radiological surveys. For work activities observed, the inspectors determined that the licensee staff were attentive to their individual tasks as well as cognizant of the overall work activity. The inspectors found the licensee staff to be knowledgeable of the radiological conditions in their work area and aware of what actions could cause the radiation levels to change. Workers communicated effectively, with repeat-backs used when appropriate. Workers demonstrated appropriate concern for industrial safety.
The inspectors observed that licensee staff were wearing appropriate anti-contamination clothing and dosimetry, as specified in the governing Radiation Work Permits (RWP).
Workers followed proper technique when removing anti-contamination clothing.
The inspectors noted that the material condition of facilities and equipment was acceptable. In general, housekeeping was adequate.
c. Conclusion The inspectors determined that the licensee conducted decommissioning activities in accordance with license requirements and in a safe manner. Licensee personnel were knowledgeable of the radiological conditions in their work areas. Workers demonstrated effective communications and work practices. Radiation workers wore dosimetry as required. Workers were attentive to industrial safety requirements. The material condition of facilities and equipment was acceptable. Housekeeping was adequate.
A list of acronyms used in the report is included at the end of the Report Details.
2.0 Radiological Safety 2.1 Solid Radioactive Waste Management and Transportation of Radioactive Materials (86750)
a. Inspection Scope The inspectors reviewed shipping documents, observed work activities, evaluated compliance with the regulations, and interviewed staff regarding the implementation of the radioactive waste program.
b. Observations and Findings The inspectors toured the area where the licensee stages radioactive waste for shipment and disposal. Four trucks were prepared to leave with shipments of radioactive waste. One shipment contained the reactor pressure vessel (RPV) head (shipment number S-2206). The other shipments contained non-hazardous waste (shipment numbers C-03-005, C-03-008, and C-03-009). The inspectors conducted radiological surveys of the packaged RPV head. Survey instrument readings indicated the shipment was in compliance with NRC and Department of Transportation (DOT)
transportation regulations. Marking, labeling, and placarding were appropriate for the shipments. The inspectors reviewed the shipping documents for the shipments and found the licensees documents acceptable.
The inspectors also observed activities and reviewed transportation documents associated with a shipment of radioactive waste to GTS Duretek in Tennessee. The shipment contained a spent fuel rack in a sea-land container and contaminated concrete debris in three B25 boxes. The inspectors reviewed all shipping documents and survey data from the four containers and the truck, and determined the documentation was appropriately completed. The licensee informed the driver of who was to be notified in the event of an incident, and the driver signed to indicate he had examined the truck and containers prior to departure and that everything was found to be acceptable.
The inspectors observed the licensees bulk monitoring system while it counted a roll-off container of waste. No concerns were identified. The licensee had adequate controls for the storage, processing, and shipment of its solid low level radioactive waste (LLRW).
c. Conclusions The licensees implementation of its radioactive waste program was adequate.
Radioactive waste being transported for disposal met applicable regulatory requirements. The licensee maintained adequate controls for the storage of solid low level radioactive waste (LLRW).
2.2 Personnel Dosimetry Program/Electronic Dosimetry (83750)
a. Inspection Scope The inspectors evaluated the licensees actions regarding damaged electronic dosimetry.
b. Observations and Findings The inspectors reviewed Procedure RP-31, Revision 52, Personnel Dosimetry, and interviewed licensee staff regarding their implementation of the personnel dosimetry procedures relative to damaged dosimetry. The use of secondary dosimetry such as electronic dosimeters (ED) was required by the Administrative Procedure D5.7 and Procedure RP-31. Procedure RP-31 required licensee staff to use Form RP-31-6, Secondary Dose Assessment Record, to document the accuracy and operability of EDs that were damaged and/or suspected of containing incorrect dose information. In addition, the procedure required the staff to document in a condition report when secondary dosimetry was not worn. A condition report was also required when an ED indicated Out at the radiological Access Control Point (ACP), and it did not record the workers dose in the dosimeters histogram or on the SAIC (Science Applications International Corporation) Access Control System (SACS).
The inspector reviewed a completed Form RP-31-6 to verify that the licensee was complying with the procedure for damaged EDs. No concerns were identified. No cases were identified where EDs were damaged in the field that resulted in a loss of dose information. As a result, no condition reports were required to be written. In all cases of damaged EDs, the data were retrieved, verified, and the dosimetry data base updated. The inspectors determined that the licensees use and management of secondary dosimetry was acceptable.
c. Conclusions The licensees staff demonstrated an appropriate knowledge of and compliance with procedures associated with the identification of damaged electronic dosimetry.
2.3 Radiation Work Permits (83750)
a. Inspection Scope The inspectors evaluated a selection of Radiation Work Permits (RWP) for adequacy and proper implementation.
b. Observations and Findings The inspectors obtained a list of the RWPs which licensee personnel used to perform work on June 16, 2003. Each of these RWPs was reviewed to verify that they were properly filled out, that the provisions of the RWP were appropriate to the work, and that the RWP contained the appropriate approval signatures. The inspectors reviewed the licensees As-Low-As-Reasonably-Achievable (ALARA) review documents for five RWPs to ensure the RWPs were consistent with the review. In all cases, the inspectors determined the RWPs were consistent with the ALARA reviews, were appropriate for the radiological work conditions, and were properly completed.
The licensee required that all workers attend a daily pre-job brief prior to using a job-specific RWP. The inspectors obtained copies of the Standard Radiation Work Permit Pre-Job Briefing Sheets for each of the RWPs under which work was performed on
June 16, 2003, and compared these sign-in sheets to computer printouts of the RWP Entry Logs. In all cases, the workers who had signed in on the RWPs attended the pre-job briefs.
The following seven RWPs and associated ALARA documents were reviewed:
1) RWP B030246, Radwaste Activities - Liner/Cask/HIC/LHRA, Revision 1 dated May 19, 2003 ALARA Review No. 162 RWP Bump Ticket, dated June 17, 2003 2) RWP B033054, Decommission the Regen & Non-Regen Heat Exchanger Room #439," Revision 1 dated May 21, 2003 ALARA Review No. 174 In-Progress ALARA Job Review, dated June 16, 2003 Shielding/Source Term Reduction Analysis Sheet, dated April 11, 2003 3) RWP B033039, Remove Reactor Vessel & Prepare for Shipping," Revision 0 ALARA Review No. 168 Reactor Vessel Removal ALARA Plan Shielding/Source Term Reduction Analysis Sheet, dated May 21, 2003 4) RWP B030216, Decommission Activities in High Radiation Areas and Areas
>50K Smearable" 5) RWP B030283, Locked High Radiation Area Entries," Revision 3 dated January 23, 2003 ALARA Review No. 163 6) RWP B033070, SFP Clean Out Surveys/Research, Floor and Wall Decon/Vacuum, and Plate Removal," Revision 2 dated April 30, 2003 7) RWP B033039, Remove and Prepare Reactor Vessel for Shipment - Recirc Pump Room," Revision 1 dated April 16, 2003 In-Progress ALARA Review, dated June 4, 2002 c. Conclusion Licensee personnel were effectively using Radiation Work Permits (RWP) to control work activities and to maintain doses as-low-as-reasonably-achievable (ALARA).
3.0 Exit Meetings The inspectors presented preliminary inspection results to members of licensee management at the conclusion of onsite inspections on May 30, 2003, and June 19, 2003. The licensee acknowledged the findings presented. The licensee did not identify any documents or processes reviewed by the inspectors as proprietary.
PARTIAL LIST OF PERSONS CONTACTED Licensee K. Haas, Plant General Manager K. Pallagi, Radiation Protection & Environmental Services Manager W. Trubilowicz, Dry Fuel Storage Manager G. Withrow, Engineering, Operations & Licensing Manager INSPECTION PROCEDURES USED IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 86750 Solid Radioactive Waste Management and Transportation ITEMS OPENED, CLOSED, AND DISCUSSED Opened None Closed None Discussed None LICENSEE DOCUMENTS REVIEWED Licensee documents reviewed and utilized during the course of this inspection are specifically identified in the Report Details above.
LIST OF ACRONYMS USED ACP Access Control Point ADAMS Agency-wide Documents and Management System ALARA As-Low-As-Reasonably-Achievable BRP Big Rock Point DNMS Division of Nuclear Materials Safety DOT Department of Transportation ED Electronic Dosimeter LLRW Low-Level Radioactive Waste mCi milliCurie NRC Nuclear Regulatory Commission RP Radiation Protection RPV Reactor Pressure Vessel RWP Radiation Work Permit SACS SAIC Access Control System SAIC Science Applications International Corporation SFP Spent Fuel Pool 7