IR 05000461/2011006

From kanterella
Jump to navigation Jump to search
Mid-Cycle Letter for Clinton Power Station, Unit 1; 05000461-2011-006
ML11244A003
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/01/2011
From: Ring M
NRC/RGN-III/DRP/RPB1
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
IR-11-006
Download: ML11244A003 (5)


Text

ember 1, 2011

SUBJECT:

MID-CYCLE LETTER FOR CLINTON POWER STATION, UNIT 1; 05000461/2011-006

Dear Mr. Pacilio:

On August 10, 2011, the NRC completed its mid-cycle performance review of Clinton Power Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2010, through June 30, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined the performance at Clinton Power Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. Some inspections planned include Inspection Procedure 71111.17, Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications. In addition to the ROP baseline, the NRC also plans to oversee activities during the next refueling outage associated with the licensees pilot program involving the generation of Cobalt-60 in the reactor for commercial uses.

The enclosed inspection plan lists the inspections scheduled through December 31, 2012.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In the days following the Fukushima Daiichi nuclear accident in Japan, the Commission directed the staff to establish a senior-level agency task force to conduct a methodical and systematic review of the NRCs processes and regulations to determine whether the agency should make additional improvements to its regulatory system. The NRC has since completed Temporary Instruction (TI) 183, Follow-up to Fukushima Daiichi Nuclear Station Fuel Damage Event, and TI-184, Availability and Readiness Inspection of Severe Accident Management Guidelines (SAMGs) at your facility. Results of these inspections can be found here:

http://www.nrc.gov/japan/japan-activities.html. Additionally, on May 11, 2011, the agency issued NRC Bulletin 2011-01, Mitigating Strategies, to confirm compliance with Order EA-02-026, subsequently imposed license conditions, and 10 CFR 50.54(hh)(2), and to determine the status of licensee mitigating strategies programs. On July 12, 2011, the NRCs Task Force made its recommendations to the Commission in its report, Recommendations for Enhancing Reactor Safety in the 21st Century: The Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident. The NRC is currently reviewing the Task Forces recommendations to determine what additional actions may be warranted.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (630) 829-9703 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark Ring, Chief Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62 Enclosure: Clinton Power Station Inspection/Activity Plan cc w/encl: Distribution via ListServe