Category:Letter
MONTHYEARML24032A0202024-01-31031 January 2024 NPDES Biocide/Corrosion Treatment Plan Annual Report, Cy 2023 ML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24018A0142024-01-17017 January 2024 Engine Systems, Inc., Report No. 10CFR21-0137, Rev. 1, 56913-EN 56913 ML24011A3182024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), October 2023 ML24011A3172024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), September 2023 ML24011A3202024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), December 2023 ML24011A3162024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), August 2023 ML24011A3192024-01-11011 January 2024 Submittal of Discharge Monitoring Report (Dmr), November 2023 IR 05000327/20234422024-01-11011 January 2024 95001 Supplemental Inspection Report 05000327/2023442 and 05000328/2023442 and Follow-Up Assessment Letter ML24010A2132024-01-10010 January 2024 CFR 21.21 Final Report Regarding Siemens Medium Voltage Circuit Breakers ML24018A0952024-01-0404 January 2024 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance Report No. 10CFR21-0137, Rev. 0 ML24004A0332024-01-0303 January 2024 Interim Report of a Deviation or Failure to Comply Crompton Instruments Type 077 Ammeter ML24004A0402024-01-0303 January 2024 Response to NRCs November 8, 2023, Request for Additional Information - Related to Independent Spent Fuel Storage Installation CNL-23-068, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) ML23346A1222023-12-12012 December 2023 Annual Non-Radiological Environmental Operating Report - 2023 IR 05000327/20234202023-11-28028 November 2023 Security Baseline Inspection Report 05000327/2023420 and 05000328/2023420 CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23324A4362023-11-0909 November 2023 Exam Corporate Notification Letter Aka 210-day Letter ML23307A0822023-11-0808 November 2023 Request for Additional Information August 4, 2022, Exemption Request for Deviating from the Conditions of Certificate of Compliance No. 1032, Amendment No. 3, Related to Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation IR 05000327/20230032023-11-0303 November 2023 Integrated Inspection Report 05000327/2023003 and 05000328/2023003 ML23306A1592023-11-0202 November 2023 Enforcement Action EA-22-129 Inspection Readiness Notification ML23292A0792023-10-19019 October 2023 Tennessee Valley Authority - Emergency Plan Implementing Procedure Revision, Includes EPIP-5, Revision 58, General Emergency IR 05000327/20230112023-10-16016 October 2023 Triennial Fire Protection Inspection Report 05000327/2023011 and 05000328/2023011 ML23285A0882023-10-12012 October 2023 Submittal of Sequoyah Nuclear Plant, Units 1 and 2, Submittal of Updated Final Safety Analysis Report Amendment 31 ML23284A4252023-10-11011 October 2023 10 CFR 50.59 and 10 CFR 72.48 Changes, Tests, and Experiments Summary Report; Commitment Summary Report; and Update to the Fire Protection Report ML23283A2792023-10-10010 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Requirements Manual ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23277A0462023-10-0404 October 2023 Revisions to the Sequoyah Nuclear Plant Units 1 and 2 Technical Specification Bases ML23275A0272023-09-29029 September 2023 Submittal of Discharge Monitoring Report (DMR) Quality Assurance Study 43 Final Report 2023 ML23271A1662023-09-28028 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision IR 05000327/20234032023-09-14014 September 2023 Cyber Security Inspection Report 05000327/2023403 and 05000328/2023403 (Cover Letter) ML23257A0062023-09-14014 September 2023 Enforcement Action EA-22-129 Inspection Postponement Request ML23254A2192023-09-11011 September 2023 Emergency Plan Implementing Procedure Revisions ML23254A0652023-09-0707 September 2023 Registration of Spent Fuel Storage Cask Pursuant to 10 CFR 72.212(b)(2) CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000327/20230052023-08-29029 August 2023 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2023005 and 05000328/2023005 ML23233A0122023-08-17017 August 2023 Unit 1 Cycle 25 Refueling Outage - 90-Day Inservice Inspection Summary Report - Supplement ML23233A0142023-08-15015 August 2023 Discharge Monitoring Report (Dmr), July 2023 ML23215A1212023-08-0303 August 2023 301 Exam Administrative Items (2B) Normal Release ML23215A1572023-08-0303 August 2023 Enforcement Action EA-22-129 Inspection Readiness Notification CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-01-04
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000327/20203012020-04-24024 April 2020 NRC Operator License Examination Report 05000327/2020301 and 05000328/2020301 IR 05000327/20173012018-02-15015 February 2018 NRC Operator License Examination Reports 05000327/2017301 and 05000328/2017301 IR 05000327/20163022016-09-12012 September 2016 NRC Operator License Examination Report 05000327/2016302 and 05000328/2016302 IR 05000327/20163012016-05-10010 May 2016 NRC Operator License Examination Report 05000327/2016301 and 05000328/2016301, March 7-11, 2016, Written Examination March 23, 2016 IR 05000327/20153012015-04-23023 April 2015 Er 05000327/2015301, 05000328/2015301, March 2-11, 2015 & March 18, 2015; Sequoyah Nuclear Plant; Operator License Examinations ML14069A5222014-03-0505 March 2014 Confirmation of Requested Initial Operator License Examinations for Sequoyah Nuclear Plant IR 05000327/20133022014-01-23023 January 2014 Er 05000327-13-302, 05000328-13-302, December 2 - 10, 2013 & December 18, 2013; Sequoyah Nuclear Plant; Operator License Examinations IR 05000327/20133012013-06-25025 June 2013 Operator License Examination Report 05000327/13-301, 05/13-16/2013, Sequoyah ML13161A0632013-06-10010 June 2013 Initial Exam 2013-301 Final RO Written Exam ML13161A0642013-06-10010 June 2013 Initial Exam 2013-301 Final SRO Written Exam IR 05000327/20123022013-02-0404 February 2013 Er 05000327-12-302, 05000328-12-302, on 12/3 - 6/2012 & 12/12/2012, Sequoyah Nuclear Plant, Operator License Examinations IR 05000327/20123012012-03-0606 March 2012 Er 05000327-12-301, 05000328-12-301, 01/17-25/2012 & 02/1/2012; Sequoyah Nuclear Plant; Operator License Examinations IR 05000327/20103022010-12-23023 December 2010 Er 05000327-10-302, 05000328-10-302, 09/13-22/2010 & 09/29/2010; Sequoyah Nuclear Plant; Operator License Examinations IR 05000237/20103012010-04-16016 April 2010 Er 05000237-10-301(DRS), 05000249-10-301(DRS), on 2/8/2010 - 3/17/2010, Exelon Nuclear Generating Company, LLC, Dresden Station, Initial License Examination Report IR 05000327/20103012010-03-29029 March 2010 Er 05000327/10-301 and 05000328/10-301 on 02/16/10 - 02/22/10 for Sequoyah, Unit 1 & 2, Operator License Examination ML0907200372009-03-13013 March 2009 Operator License Exam Report 05000327-09-301 and 05000328-09-301 on 01/20/09 - 01/29/09 for Sequoyah Nuclear Plant, Units 1 & 2 ML0805703882008-02-25025 February 2008 Er 05000327-08-301, 05000328-08-301, on 1/28-2/8/2008, Sequoyah Nuclear Power Plant, Units 1 and 2; Licensed Operator Examinations ML0716602712007-06-15015 June 2007 Er 05000327-07-301, 05000328-07-301; 4/9-5/9/2007; Sequoyah Nuclear Power Plant, Units 1 and 2; Licensed Operator Examinations ML0526601132005-09-20020 September 2005 Preparation and Scheduling of Operator License Examinations - NRC Regulatory Issue Summary (RIS) 2005-19 ML0306904742003-03-0707 March 2003 NRC Examination Report 50-327/03-301 and 50-328/03-301 2020-08-27
[Table view] |
Text
UNITED STATES ary 15, 2018
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORTS 05000327/2017301 AND 05000328/2017301
Dear Mr. Williams:
During the period December 4 - 12, 2017, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the Sequoyah Nuclear Plant, Units 1 and 2. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 20, 2017.
All the applicants passed both the operating test and written examination. There was one post-administration comment concerning the written examination. This comment, and the NRC resolution of this comment, is summarized in Enclosure 2. A Simulator Fidelity Report is included in this report as Enclosure 3.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4551 (Internet E-mail: Gerald.McCoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket No.: 50-327, 50-328 License No. : DRP-77, DRP-79
Enclosures:
1. Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
REGION II==
Docket Nos.: 05000327, 05000328 License Nos.: DRP-77, DRP-79 Report Nos.: 05000327/2017301 and 05000328/2017301 Licensee: Tennessee Valley Authority Facility: Sequoyah Nuclear Plant Location: Soddy-Daisy, TN Dates: Operating Test - December 4-12, 2017 Written Examination - December 20, 2017 Examiners: N. Lacy, Chief Examiner, Senior Operations Engineer J. Bundy, Operations Engineer J. Kellum, Senior Reactor Engineer T. Stephen, Operations Engineer Approved by: Gerald McCoy, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY
ER 05000327/2017301 and 05000328/2017301; December 4-12, 2017 & December 20, 2017;
Sequoyah Nuclear Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Sequoyah Nuclear Plant staff developed both the operating tests and the written examinations. The initial operating tests, written Reactor Operator (RO) examination, and written Senior Reactor Operator (SRO) examination submittals met the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period December 4-12, 2017. Members of the Sequoyah Nuclear Plant training staff administered the written examination on December 20, 2017. There were ten RO and two SRO applicants and all applicants passed both the operating test and written examination. All applicants were issued licenses commensurate with the level of examination administered.
There was one post-examination comment of an editorial nature and no changes were made to the final administered exam.
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period December 4-12, 2017. The NRC examiners evaluated ten RO and two SRO applicants using the guidelines contained in NUREG-1021. Members of the Sequoyah Nuclear Plant training staff administered the written examination on December 20, 2017. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Sequoyah Nuclear Plant, Units 1 and 2, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
b. Findings
No findings were identified.
The NRC developed the written examination sample plan outline. Members of the Sequoyah Nuclear Plant training staff developed both the operating tests and the written examinations. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
All applicants passed both the operating test and written examination and were issued licenses.
Copies of all individual examination reports were sent to the facility Training Director for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted one post-examination comment that was editorial in nature and did not require a change to the final administered written exam. A copy of the final written examinations and answer keys, with all changes incorporated, may be accessed not earlier than December 20, 2019, in the ADAMS system (ADAMS Accession Numbers ML18045A077 and ML18045A123).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On December 12, 2017, the NRC examination team discussed generic issues associated with the operating test with Mr. Dimopoulos, Sequoyah Operations Director, and members of the Sequoyah Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel D. Dimopoulos, Operations Director G. Garner, Training Director C. Dahlman, Operations Training Manager R. Joplin, Corporate Exam Program Manager S. Nakamine, Operations Shift Manager M. Leeworts, Operations Training Liaison J. Ward, ILT Supervisor J. Bailey, Exam Room Supervisor/Author A. Roddy, ILT Instructor S. Smith, Exam Author
FACILITY POST-EXAMINATION COMMENTS AND NRC RESOLUTIONS
A complete text of the licensees post-examination comment can be found in ADAMS under
Accession Number ML18045A071. The licensees post-examination comment was associated
with one written exam question.
Because the comment was of a minor editorial nature no changes were requested nor made to
the final administered written exam.
SIMULATOR FIDELITY REPORT
Facility Licensee: Sequoyah Nuclear Plant
Facility Docket Nos.: 05000327, 05000328
Operating Test Administered: December 4-12, 2017
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with Inspection
Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee
action is required in response to these observations.
While conducting the simulator portion of the operating test, examiners observed the following:
Item Description
None Not Applicable
3