March 7, 2003

Tennessee Valley Authority

ATTN: Mr. J. A. Scalice

Chief Nuclear Officer and

Executive Vice President

6A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NRC EXAMINATION REPORT

50-327/03-301 AND 50-328/03-301

Dear Mr. Scalice:

On February 27, 2003, the Nuclear Regulatory Commission (NRC) administered operating

retake examinations to two employees of your company who had reapplied for licenses to

operate the Sequoyah Nuclear Plant. The Reactor Operator applicant was required to take the

Administrative Topics section of the Operating examination. The Senior Reactor Operator

applicant was required to take the Integrated Plant Operations (Simulator Operating Test) of

the Operating examination. Both applicants passed their retake examinations.

No findings of significance were identified.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA/

Michael E. Ernstes, Chief

Operator Licensing and

Human Performance Branch

Division of Reactor Safety

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Enclosure: (See page 2)

TVA

2

Enclosure:

Report Details

cc w/encl:

Karl W. Singer

Senior Vice President

Nuclear Operations

Tennessee Valley Authority

Electronic Mail Distribution

James E. Maddox, Acting Vice President

Engineering and Technical Services

Tennessee Valley Authority

Electronic Mail Distribution

Richard T. Purcell

Site Vice President

Sequoyah Nuclear Plant

Electronic Mail Distribution

General Counsel

Tennessee Valley Authority

Electronic Mail Distribution

Robert J. Adney, General Manager

Nuclear Assurance

Tennessee Valley Authority

Electronic Mail Distribution

Mark J. Burzynski, Manager

Nuclear Licensing

Tennessee Valley Authority

Electronic Mail Distribution

Pedro Salas, Manager

Licensing and Industry Affairs

Sequoyah Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

D. L. Koehl, Plant Manager

Sequoyah Nuclear Plant

Tennessee Valley Authority

Electronic Mail Distribution

Lawrence E. Nanney, Director

TN Dept. of Environment & Conservation

Division of Radiological Health

Electronic Mail Distribution

County Executive

Hamilton County Courthouse

Chattanooga, TN 37402-2801

Ann Harris

341 Swing Loop

Rockwood, TN 37854

John D. White, Jr., Director

Tennessee Emergency Management

Agency

Electronic Mail Distribution

Roy Goodman

Training Manager

Sequoyah Nuclear Plant

P. O. Box 2000

Soddy-Daisy, TN 37379-2000

TVA

3

Distribution w/encl:

R. Anand, NRR

C. Evans (Part 72 Only)

L. Slack, RII EICS

RIDSNRRDIPMLIPB

PUBLIC

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA/

/RA/

NAME

LMiller:pmd

MErnstes

SCahill

DATE

3/7/03

3/7/03

3/7/03

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

PUBLIC DOCUMENT

YES

NO

OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030690474.wpd

Enclosure 1

NUCLEAR REGULATORY COMMISSION

REGION II

Docket Nos.:

50-327, 50-328

License Nos.:

DPR-77, DPR-79

Report Nos.:

50-327/03-301, 50-328/03-301

Licensee:

Tennessee Valley Authority (TVA)

Facility:

Sequoyah Nuclear Plant Units 1 & 2

Location:

Sequoyah Access Road

Soddy-Daisy, TN 37379

Dates:

Operating Tests - February 27, 2003

Examiner:

L. Miller, Chief Examiner

Approved by:

M. Ernstes, Chief

Operator Licensing and Human Performance Branch

Division of Reactor Safety

SUMMARY OF FINDINGS

ER 05000327/2003-301, 05000328/2003-301, Tennessee Valley Authority; 2/27/2003;

Sequoyah Nuclear Plant, Units 1 and 2; Licensed Operator Examinations.

The NRC examiner conducted operator licensing initial examination retakes in accordance with

the guidance of Examiner Standards, NUREG-1021, Revision 8, Supplement 1. This

examination implemented the operator licensing requirements of 10 CFR §55.45.

The NRC administered the operating tests during the period February 27, 2003. The operator

licensing initial operating retake examinations were developed by the licensee. One reactor

operator (RO) and one senior reactor operator (SRO) applicant passed the retake of their

operating examinations and were issued operator licenses commensurate with the level of

examination administered.

No significant issues were identified.

Report Details

4.

OTHER ACTIVITIES (OA)

4OA5 Operator Licensing Initial Examinations

a.

Inspection Scope

The examiner reviewed the operating examinations developed by the licensee for

compliance with the guidelines specified in NUREG-1021, Revision 8, Supplement 1.

The examiner reviewed the licensees examination security measures while preparing

and administering the examinations to ensure examination security and integrity

complied with 10 CFR 55.49, Integrity of examinations and tests.

The examiner evaluated one RO and one SRO applicant who were being assessed

under the guidelines specified in NUREG-1021. The examiner administered the retake

operating tests on February 27, 2003. The evaluation of the applicants and review of

documentation were performed to determine if the applicants, who applied for licensees

to operate the Sequoyah Nuclear Plant, met requirements specified in 10 CFR Part 55.

b.

Findings

No findings of significance were identified.

4OA6 Meetings

Exit Meeting Summary

On February 27, 2003, the Chief Examiner discussed generic applicant performance

and examination development issues with members of licensee management.

The inspectors confirmed that proprietary information was not provided or examined

during the inspection.

Enclosure 2

PARTIAL LIST OF PERSONS CONTACTED

Licensee

M. Lorek, Assistant Plant Manager

R. Goodman, Training Manager

G. Sanders, Operations Training Manager

D. Webb, Operations Superintendent

J. Epperson, Operations Training

S. Poteet, Operations Training

J. Smith, Licensing Supervisor

R. Proffitt, Licensing Engineer