ML052660113

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator License Examinations - NRC Regulatory Issue Summary (RIS) 2005-19
ML052660113
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/20/2005
From: Pace P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-05-019
Download: ML052660113 (4)


Text

- -

Tennessee Valley Authority, Post Office Box 2000. Soddy-Daisy, Tennessee 37384-2000 September 20, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 SEQUOYAH NUCLEAR PLANT (SQN) - PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS - NRC REGULATORY ISSUE

SUMMARY

(RIS) 2005-19 This letter is in response to the NRC RIS 2005-19 dated August 24, 2005. The enclosure provides the requested information.

If you have any questions, please call me at (423) 843-7170 or J. D. Smith at (423) 843-6672.

Sincerely, P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure cc: See page 2 PWved on rOcycWdpar

U.S. Nuclear Regulatory Commission Page 2 September 20, 2005 cc (Enclosure):

Dr. William D. Travers Regional Administrator, Region II ATTN: J. H. Moorman U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE SEQUOYAH NUCLEAR PLANT PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 (8-2005) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments re~!ardin bude OPERATOR LICENSING estimate adrsucsfr t0 the Records and FOIlfPrivacy Services Branch Pa'rexmilallrvicstie Bnh-5 (T5F5) U.S.

T93)u.en-S Nuclear Regulatory Commission, Washington, DC 20555-0001 or by Internet EXAMINATION DATA EXAMINATION DATA e-mail to infocollects@nrcrgovoand to the Desk Officer, Office of Information and Regulatory AfisNEB-10202, (3150-0131), Office of Management and Budget. Washington, DC 20503. If a means used to Impose an information collection does not display a currently vaMB OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACIULTY NRC REGION Sequoyah Nuclear Plant Region 11 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 06 CY 07 CY 08 CY 09 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 06 CY 07 CY 08 CY 09 NUMBER OF REACTOR 4 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR 4 0 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 4 0 4 0 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 12104/2006 09/23/2008 ALTERNATE DATE 12/11/2006 10/07/2008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 06 CY 07 PROPOSED _

NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED 1 NUMBER OF 0 0 0 0 14 0 0 0 CANDIDATES NRC FORM 536 (8 2005) PRINTED ON RECYCLED PAPER