MONTHYEARML24298A1172024-10-24024 October 2024 Cycle 26, 180-Day Steam Generator Tube Inspection Report CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000327/LER-2024-001, Reactor Trip Due to a Turbine Trip2024-10-17017 October 2024 Reactor Trip Due to a Turbine Trip ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 05000328/LER-2024-001, Reactor Trip Due to an Electrical Trouble Turbine Trip2024-09-25025 September 2024 Reactor Trip Due to an Electrical Trouble Turbine Trip CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24267A0402024-09-19019 September 2024 Cycle 27 Core Operating Limits Report Revision 0 ML24185A1742024-09-18018 September 2024 Cover Letter - Issuance of Exemption Related to Non-Destructive Examination Compliance Regarding Sequoyah Nuclear Plant Independent Spent Fuel Storage Installation CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24253A0152024-09-0808 September 2024 Emergency Plan Implementing Procedure Revisions ML24247A2212024-08-29029 August 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Letter OG-21-160, NEI 03-08 Needed Guidance: PWR Lower Radial Support Clevis Insert X-750 Bolt Inspection Requirements, September 1, 2021 ML24247A1802024-08-28028 August 2024 Application to Revise the Fuel Handling Accident Analysis, to Delete Technical Specification 3.9.4, Containment Penetrations, and to Modify Technical Specification 3.3.6, Containment Ventilation Isolation Instrumentation for Sequoyah Nuclea IR 05000327/20240052024-08-26026 August 2024 Updated Inspection Plan for Sequoyah Nuclear Plant, Units 1 and 2 - Report 05000327/2024005 and 05000328/2024005 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), IR 05000327/20240022024-07-31031 July 2024 Integrated Inspection Report 05000327/2024002 and 05000328/2024002 ML24211A0572024-07-29029 July 2024 Submittal of Emergency Plan Implementing Procedure Revision ML24211A0542024-07-29029 July 2024 Operator License Examination Report ML24211A0412024-07-26026 July 2024 Unit 1 Cycle 26 Refueling Outage - 90-Day Inservice Inspection Summary Report ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24191A4652024-07-0909 July 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24177A0282024-06-25025 June 2024 Emergency Plan Implementing Procedure Revisions ML24176A0222024-06-24024 June 2024 Retraction of Interim Report of a Deviation or Failure to Comply – Transducer Model 8005N ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24145A0852024-05-30030 May 2024 1B-B Diesel Generator Failure - Final Significance Determination Letter ML24145A1052024-05-29029 May 2024 301 Exam Approval Letter ML24134A1762024-05-13013 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24128A0352024-05-0707 May 2024 Providing Supplemental Information to Apparent Violation ML24120A0582024-04-26026 April 2024 10 CFR 50.46 Annual Report for Sequoyah Nuclear Plant Units 1 and 2 ML24116A2612024-04-25025 April 2024 Interim Report of a Deviation or Failure to Comply - Transducer Model 8005N ML24114A0482024-04-23023 April 2024 Annual Radioactive Effluent Release Report for 2023 Monitoring Period CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24144A2322024-04-20020 April 2024 Tennessee Multi-Sector Permit (Tmsp), 2024 Annual Discharge Monitoring Report for Outfalls SW-3, SW-3, and SW-9 ML24144A2362024-04-20020 April 2024 Discharge Monitoring Report (Dmr), March 2024 ML24089A0882024-04-18018 April 2024 – Exemption from Select Requirements of 10 CFR Part 73; Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24102A1212024-04-18018 April 2024 Summary of Conference Call with Tennessee Valley Authority Regarding Sequoyah Nuclear Plant, Unit 1 Spring 2024 Steam Generator Tube Inspections CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000327/20240012024-04-17017 April 2024 Integrated Inspection Report 05000327/2024001 and 05000328/2024001 ML24109A0272024-04-16016 April 2024 Cycle 27 Core Operating Limits Report Revision 0 CNL-23-006, Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03)2024-04-15015 April 2024 Application to Modify Technical Specifications 3.8.1, AC Sources – Operating, and 3.8.2, AC Sources – Shutdown, for Sequoyah Nuclear Plant (SQN-TSC-22-03) ML24106A0502024-04-12012 April 2024 Discharge Monitoring Report (Dmr), February 2024 ML24100A0162024-04-11011 April 2024 Request for Regulatory Conference (Tennessee Valley Authority - Sequoyah Nuclear Plant) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 2024-09-08
[Table view] Category:License-Operator Examination Report
MONTHYEARML24211A0542024-07-29029 July 2024 Operator License Examination Report IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000327/20203012020-04-24024 April 2020 NRC Operator License Examination Report 05000327/2020301 and 05000328/2020301 IR 05000327/20173012018-02-15015 February 2018 NRC Operator License Examination Reports 05000327/2017301 and 05000328/2017301 IR 05000327/20163022016-09-12012 September 2016 NRC Operator License Examination Report 05000327/2016302 and 05000328/2016302 IR 05000327/20163012016-05-10010 May 2016 NRC Operator License Examination Report 05000327/2016301 and 05000328/2016301, March 7-11, 2016, Written Examination March 23, 2016 IR 05000327/20153012015-04-23023 April 2015 Er 05000327/2015301, 05000328/2015301, March 2-11, 2015 & March 18, 2015; Sequoyah Nuclear Plant; Operator License Examinations ML14069A5222014-03-0505 March 2014 Confirmation of Requested Initial Operator License Examinations for Sequoyah Nuclear Plant IR 05000327/20133022014-01-23023 January 2014 Er 05000327-13-302, 05000328-13-302, December 2 - 10, 2013 & December 18, 2013; Sequoyah Nuclear Plant; Operator License Examinations IR 05000327/20133012013-06-25025 June 2013 Operator License Examination Report 05000327/13-301, 05/13-16/2013, Sequoyah ML13161A0632013-06-10010 June 2013 Initial Exam 2013-301 Final RO Written Exam ML13161A0642013-06-10010 June 2013 Initial Exam 2013-301 Final SRO Written Exam IR 05000327/20123022013-02-0404 February 2013 Er 05000327-12-302, 05000328-12-302, on 12/3 - 6/2012 & 12/12/2012, Sequoyah Nuclear Plant, Operator License Examinations IR 05000327/20123012012-03-0606 March 2012 Er 05000327-12-301, 05000328-12-301, 01/17-25/2012 & 02/1/2012; Sequoyah Nuclear Plant; Operator License Examinations IR 05000327/20103022010-12-23023 December 2010 Er 05000327-10-302, 05000328-10-302, 09/13-22/2010 & 09/29/2010; Sequoyah Nuclear Plant; Operator License Examinations IR 05000237/20103012010-04-16016 April 2010 Er 05000237-10-301(DRS), 05000249-10-301(DRS), on 2/8/2010 - 3/17/2010, Exelon Nuclear Generating Company, LLC, Dresden Station, Initial License Examination Report IR 05000327/20103012010-03-29029 March 2010 Er 05000327/10-301 and 05000328/10-301 on 02/16/10 - 02/22/10 for Sequoyah, Unit 1 & 2, Operator License Examination ML0907200372009-03-13013 March 2009 Operator License Exam Report 05000327-09-301 and 05000328-09-301 on 01/20/09 - 01/29/09 for Sequoyah Nuclear Plant, Units 1 & 2 ML0805703882008-02-25025 February 2008 Er 05000327-08-301, 05000328-08-301, on 1/28-2/8/2008, Sequoyah Nuclear Power Plant, Units 1 and 2; Licensed Operator Examinations ML0716602712007-06-15015 June 2007 Er 05000327-07-301, 05000328-07-301; 4/9-5/9/2007; Sequoyah Nuclear Power Plant, Units 1 and 2; Licensed Operator Examinations ML0526601132005-09-20020 September 2005 Preparation and Scheduling of Operator License Examinations - NRC Regulatory Issue Summary (RIS) 2005-19 ML0306904742003-03-0707 March 2003 NRC Examination Report 50-327/03-301 and 50-328/03-301 2024-07-29
[Table view] |
See also: IR 05000327/2008301
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
February 25, 2008
Tennessee Valley Authority
ATTN: Mr. William R. Campbell
Chief Nuclear Officer and
Senior Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT: SEQUOYAH NUCLEAR PLANT - NRC EXAMINATION REPORT
NOS. 05000327/2008301 AND 05000328/2008301
Dear Mr. Campbell:
During the period of January 28-30, 2008, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the Sequoyah Nuclear Plant. The chief examiner discussed examination
questions and preliminary findings related to the operating test with those members of your staff
identified in the enclosed report on January 31, 2008. The written examination was
administered by your staff on February 8, 2008.
Three Senior Reactor Operator applicants passed both the written and operating examinations.
There were no post examination comments. A Simulation Facility Report is included in this
report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading
Room).
TVA 2
Should you have any questions concerning this letter, please contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket No.: 50-327, 50-328
License No.: DPR-77, DPR-79
cc: See page 3
Enclosures: 1. Report Details
2. Simulation Facility Report
TVA 3
cc w/encls: Robert H. Bryan, Jr., General Manager
Ashok S. Bhatnagar Licensing and Industry Affairs
Senior Vice President Sequoyah Nuclear Plant
Nuclear Generation Development Tennessee Valley Authority
and Construction 4X Blue Ridge
Tennessee Valley Authority 1101 Market Street
Electronic Mail Distribution Chattanooga, TN 37402-2801
Preston D. Swafford David A. Kulisek, Plant Manager
Senior Vice President Sequoyah Nuclear Plant
Nuclear Support Tennessee Valley Authority
Tennessee Valley Authority Electronic Mail Distribution
Electronic Mail Distribution
Lawrence E. Nanney, Director
Walter M. Justice, II TN Dept. of Environment & Conservation
Interim Vice President Division of Radiological Health
Nuclear Engineering & Electronic Mail Distribution
Technical Services
Tennessee Valley Authority
Electronic Mail Distribution County Mayor
Hamilton County Courthouse
Randy Douet Chattanooga, TN 37402-2801
Site Vice President
Sequoyah Nuclear Plant Ann Harris
Electronic Mail Distribution 341 Swing Loop
Rockwood, TN 37854
General Counsel
Tennessee Valley Authority James H. Bassham, Director
Electronic Mail Distribution Tennessee Emergency Management
Agency
John C. Fornicola, General Manager Electronic Mail Distribution
Nuclear Assurance
Tennessee Valley Authority Mr. Thomas Wallace
Electronic Mail Distribution Training Manager
Sequoyah Training Center
Beth A. Wetzel, Manager Igou Ferry Road
Corporate Nuclear Licensing and Soddy-Daisy, TN 37379
Industry Affairs
Tennessee Valley Authority
4X Blue Ridge
1101 Market Street
Chattanooga, TN 37402-2801
Glenn W. Morris, Manager
Licensing and Industry Affairs
Sequoyah Nuclear Plant
Tennessee Valley Authority
Electronic Mail Distribution
_________________________
OFFICE RII:DRS RII:DRS RII:
SIGNATURE / RAG.Lasks for/ /RA/ /RA/
NAME M.Widmann M. Bates R. Nease
DATE 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008 2/ /2008
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
NUCLEAR REGULATORY COMMISSION
REGION II
Docket No.: 50-327, 50-328
License No.: DPR-77, DPR-79
Report No.: 05000327/2008301 and 05000328/2008301
Licensee: Tennessee Valley Authority (TVA)
Facility: Sequoyah Nuclear Plant Units 1 & 2
Location: Sequoyah Access Road
Soddy-Daisy, TN 37379
Dates: Operating Tests - January 28 - 30, 2008
Written Examination - February 8, 2008
Examiners: M. Bates, Chief, Senior Operations Engineer
B. Caballero, Operations Examiner
P. Capehart, Operations Examiner
Approved by: Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Enclosure 1
SUMMARY OF FINDINGS
ER 05000327/2008301, 05000328/2008301; 1/28-2/8/2008; Sequoyah Nuclear Power Plant,
Units 1 and 2; Licensed Operator Examinations.
The NRC examiners conducted operator licensing initial examinations in accordance with the
guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for Power
Reactors. This examination implemented the operator licensing requirements of 10 CFR
§55.41, §55.43, and §55.45.
The NRC administered the operating tests during the period of January 28-30, 2008. Members
of the Sequoyah Nuclear Plant training staff administered the written examination on February
8, 2008. The operator licensing initial written examinations and operating tests were developed
by the licensee. Three Senior Reactor Operator (SRO) applicants passed both the written and
operating examinations and were issued SRO licenses.
There were no post examination comments.
No findings of significance were identified.
Enclosure 1
Report Details
4. OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a. Inspection Scope
The Sequoyah training staff developed the operating test and written examinations in
accordance with NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9. The licensees examination team reviewed the proposed
examinations. Examination changes agreed upon between the NRC and the licensee
were made according to NUREG-1021 and incorporated into the final version of the
examination materials.
The examiners reviewed the licensees examination security measures while preparing
and administering the examinations to ensure examination security and integrity
complied with 10 CFR 55.49, Integrity of Examinations and Tests.
The examiners evaluated three SRO applicants who were being assessed under the
guidelines specified in NUREG-1021. The examiners administered the operating tests
during the period of January 28-30, 2008. Members of the Sequoyah training staff
administered the written examination on February 8, 2008. The evaluations of the
applicants and review of the documentation were performed to determine if the
applicants, who applied for licenses to operate the Sequoyah Nuclear Power Plant, met
requirements specified in 10 CFR 55, Operators Licenses.
b. Findings
No findings of significance were identified.
The NRC determined that the details provided by the licensee for the walkthrough and
simulator tests were within the range of acceptability expected for the proposed tests.
Three SRO applicants passed both the operating test and written examination.
The final RO and SRO written examinations with knowledge and abilities (K/As),
question references/answers and examination references may be accessed in the
ADAMS system (ADAMS Accession Numbers, ML080440381 and ML080440386).
4OA6 Meetings
Exit Meeting Summary
On January 31, 2008, the chief examiner discussed generic issues with
Mr. T. Cleary and members of the Sequoyah staff. The inspectors asked the licensee
whether any materials examined during the inspection should be considered proprietary.
No proprietary information was identified.
Enclosure 1
4
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
T. Cleary, Sequoyah Vice President
T. Wallace, Training Manager
M. Palmer, Operations Manager
J. Capriani, Nuclear Assurance Manager
R. Bruno, Senior Accreditation Manager
B. Picchiottino, Operations Training Manager
C. Church, Project Manager
J. Addison, Initial License Training Supervisor
T. Jones, Operations Instructor
J. Proffitt, Licensing Engineer
NRC personnel
S. Freeman, Senior Resident Inspector
M. Speck, Resident Inspector
Enclosure 1
SIMULATION FACILITY REPORT
Facility Licensee: Sequoyah Nuclear Plant
Facility Docket Nos.: 05000327/05000328
Operating Tests Administered on: January 28-30, 2008
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with IP
71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is
required in response to these observations.
While conducting the simulator portion of the operating tests, examiners did not observe any
simulation fidelity issues.
Enclosure 2