, o i

Appendix NOTICE OF VIOLATION Comonwealth Edison Company Docket No. 50-456 Docket No. 50-457 As a result of the inspection conducted on May 9 through June 21, 1985, and in accordance with the General Policy and Procedures for NRC Enforcement Actions (10 CFR Part 2, Appendix C), the following violation was identified:

10 CFR 50, Appendix B, Criterion XIII, states in part, that measures shall be established to control the storage and preservation of material and equipment to prevent damage or deterioration. The Commonwealth Edison Company Quality Assurance Program contains in Quality Requirement (QR)

2.0 a commitment to Regulatory Guide 1.39, Revision Regulatory Guide 1.39, Revision 2, endorses the requirements of ANSI N45.2.3-1973, " Housekeeping During the Construction Phase of Nuclear Power Plants". ANSI N45.2.3, Section 3.2.1, requires that scrap and excess materials shall be collected and disposed of in accordance with specified requirements. Such excess material shall not be allowed to accumulate and create conditions that will adversely affect qualit Contrary to the above: Nails, washers, bolts, screws, wire, metal brackets and a grinding wheel were found in cable trays which had installed cable, The upper cable spreading room was noted as having debris in cable trays and empty aerosol cans which had contained a highly flammable liqui High strength bolting material, (A490 and A325 galvanized bolts, which cannot be reused per the AISC Code) were found laying in various work areas of the plant, not controlled or stored in a material staging are This is a Severity Level IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance: (1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause show kbr Datef~

ffMA W. 5. Little( Director "

Braidwood Project

-

8508010333 850711 PDR ADOCK 05000456 G PDRs