Notice of Violation from Insp on 921201-930119.Violation Noted:Corrective Actions Associated W/Ler 456/90-14 Had Not Been Implemented in Timely Manner
ML20128K229
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/04/1993
From: Beverly Clayton
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20128K208 List:
References
50-456-92-25, 50-457-92-25, NUDOCS 9302180105
Download: ML20128K229 (1)


Text

- -____- - _-- _ __ _ _ ._

i t

NOTICE OF VIOLATIOR Commonwealth Edison Company Docket Nos. S0-456; 50-457 Braidwood Station License Nos. NPF-72; NPF-77 ,

As a result of an inspection condteted from December 1,1992 through

_ January 19, 1993,- a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1992), the violation is listed below:

10 CFR 50, appendix B, " Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," Criteria XVI, " Corrective Action," requires, in part, that measures shall be established to assure that conditions adverse to quality are promptly identified and corrected. '

Contrary to the above, on November 30, 1992, it was identified that corrective actions associated with Licensee Event Report 456/90014 had not been implemented in a timely manner.

This is a Severity Level IV violation (Supplement I) (50-456/92025-01(DRP);

50-457/92025-01(DRP)).

Pursuant to the provisions cf 10 CFR 2.201, Commonwealth Edison is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington D.C. 20555 with a copy to the U.S. Nuclear Regulatory Commission, Region 111,'799  ;

Roosevelt Road, Glen Ellyn, Illinois, 60137, and a copy to the NRC Resident  ;

Inspector at the Braidwood Station within 30 days of the date of the letter '

transmitting this Notice of Violation. This reply should be clearly marked as ,

a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested, the basis for disputing the violation, (2) the corrective steps that have been taken and the results achieved, (3) the corrective steps that will be taken to avoid further ,

violations, and (4) the date when full compliance will be achieved. If an adequate reply is not received within the time specified in this Notice, an

'7 order or a demand for information may be issued as to why the license should not be modified, suspended, or revoked,- or why such other action as may be.

proper should not be taken. Where good cause is shown, consideration will be given to extending the response time.

Dated at Glen Ellyn, Illinois Brent Clayton, Chief this 4 d day of February,1993 Reactor Projects Branch 1 9302180105'930204 i

PDR ADOCK 05000456 i G PDR j