ML20132D666
| ML20132D666 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 07/11/1985 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20132D670 | List: |
| References | |
| NUDOCS 8508010318 | |
| Download: ML20132D666 (2) | |
See also: IR 05000456/1985023
Text
s
5
$N
,
.<
p
.
,,2taGo
UNITED STATES
f(
's,
NUCLEAR REGULATORY COMMISSION
y i T e ( l'
REGION 111
o
g
j
7ss noosevetr aoao
g.g j
ou ~ mu ~. ,<a ~o,,
. i n
'JUL 1 1 1985
Docket No. 50-456
Docket No. 50-457
Comonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
t
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. D. Schulz,
L. G. McGregor, W. J. Kropp, and R. N. Gardner of this office on May 9 through
June 21, 1985, of activities at Braidwood Nuclear Power Station, Units 1 and 2,
authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to
the discussion of our findings with Mr. M. Wallace at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, one of your activities appeared to be in noncompliance
with NRC requirements, as specified in the enclosed Appendix. A written
response is required.
In accordar.ce with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosure (s) will be placed in the NRC's Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
.
I
8500010318 850711
DR
ADOCK 05000456
g
10L
- - - -
-
.
.
-.
. - _ . . -
_ _ - _ _ _ _ .
-
,
f
a
Comonwealth Edison Company
2
'JtJL' 1 1 1985
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
W. S. Little, Director-
t
Braidwood Project
Enclosures:
1.
Appendix.- Notice-of
Violation-
- 2.
Inspection Reports
No.50-456/85023(DRP);
No.50-457/85024(DRP)
cc w/ enclosures:
D. L. Farrar, Director
of. Nuclear Licensing
M.' Wallace, Project Manager
D. Shamblin, Construction
Superintendent
J. F. Gudac, Station
Superintendent
C. W. Schroeder, Licensing and
Compliance Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
. Phyllis Dunton, Attorney
General's Office, Environmental-
'
Control Division
D. W. Cassel, Jr., Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J.-Stevens, NRR
.,
e