O NOTICE OF VIOLATION Corrnonwealth Edison Company Docket No. 50-456 Docket No. 50-457 As a result of the inspection conducted from August 28 through October 15, 1988, and in accordance with the "General Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the following violatior was identified:
Braidwood Station Technical Specifications Scction 6.8.1.a requires that written procedures be established, implemented, and maintained to cover applicable activities recommended in Appendix A of Regulatory Gu'de 1.33 Revision 2. February 1978.
Procedures for abnormal, of f-nomal, ir alam conditions are recormended in Appendix A of Regulatory Guide 1.33.
Braidwood Alam Response Procedere BwAR 1-1-B7, "Secondary Sampling Panel / Sink Trouble," Revision 52, April 1987, requires that operators ircediately notify the Radiation Chemistry Department in respunse to a secondary sampling panel / sink trouble condition (Alarm No.1-1-B?).
Contrary to the above requirement, on September 14, 1988, Rad / Chem Department personnel were not notified of a secondary senpling panel /
sink trouble condition when indicated by alams which began about 9:43 p.m. on Unit I and remained unaware of the condition until approximately 11:00 p.m. on September 14, 1988, when a Radiation Chemistry Technician discovered the condition.
This is a Severity Level IV violation (Supplement I),
(50-456/88026-01(DRSS);50-457/88026-01(DRSS))
Fursuant to the provisions of 10 CFR 2.201, you are required to submit to this offic.e within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation:
(1) the corrective actions that have been taker. and the results achieved; (2) the corrective actions that will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response tire for good cause noown,
\\ D O R L<dEE Dt + -
ner ii m Dated W. L. FoToey, Acting DeputyNirector Division of Reactor Projects 8811030415 sg30s,
$DR ADock 0500%
FDC
.