Notice of Violation from Insp on 880828-1015.Violation Noted:On 880914,radiation/chemistry Dept Personnel Not Notified of Secondary Sampling Panel/Sink Trouble Condition When Indicated by Alarms
ML20205N035
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/27/1988
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20205N024 List:
References
50-456-88-26, 50-457-88-26, NUDOCS 8811030415
Download: ML20205N035 (1)


Text

  • O NOTICE OF VIOLATION Corrnonwealth Edison Company Docket No. 50-456 Docket No. 50-457 As a result of the inspection conducted from August 28 through October 15, 1988, and in accordance with the "General Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the following violatior was identified:

Braidwood Station Technical Specifications Scction 6.8.1.a requires that written procedures be established, implemented, and maintained to cover applicable activities recommended in Appendix A of Regulatory Gu'de 1.33 Revision 2. February 1978. Procedures for abnormal, of f-nomal, ir alam conditions are recormended in Appendix A of Regulatory Guide 1.33.

Braidwood Alam Response Procedere BwAR 1-1-B7, "Secondary Sampling Panel / Sink Trouble," Revision 52, April 1987, requires that operators ircediately notify the Radiation Chemistry Department in respunse to a secondary sampling panel / sink trouble condition (Alarm No.1-1-B?).

Contrary to the above requirement, on September 14, 1988, Rad / Chem Department personnel were not notified of a secondary senpling panel /

sink trouble condition when indicated by alams which began about 9:43 p.m. on Unit I and remained unaware of the condition until approximately 11:00 p.m. on September 14, 1988, when a Radiation Chemistry Technician discovered the condition.

This is a Severity Level IV violation (Supplement I),

(50-456/88026-01(DRSS);50-457/88026-01(DRSS))

Fursuant to the provisions of 10 CFR 2.201, you are required to submit to this offic.e within thirty days of the date of this Notice a written statement or explanation in reply, including for each violation: (1) the corrective actions that have been taker. and the results achieved; (2) the corrective actions that will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response tire for good cause noown, ner ii m \ D O R L<dEE Dt + -

Dated W. L. FoToey, Acting DeputyNirector Division of Reactor Projects 8811030415 sg30s,