ML081640316

From kanterella
Revision as of 16:06, 29 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fermi 2, Licensing Document Transmittal, Technical Requirements Manual - Vol. 1, Rev. 89
ML081640316
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/05/2008
From:
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML081640316 (9)


Text

DETROIT-EDISON L FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CbOTROL LIST 06/05/08, To: 00935 US NRC DOCUMENT CNTRL DESK PAGE 2 WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvi Date Sec Status TMTRM TRM VOL I 89 1 IR 06/05/08 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.Ref: cb1461 4orD LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAICREQUIREMENTS MANUAL -VOL I Revision 89 dated 06/05/08 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 88 has been inserted prior to inserting these pages....- w, Remove'In Fr6ont0o.,TRM Manuaal' .-Title. Page&-Rev 88 04/11/08 Immediately following.

List of Effective Pages.Title Page LEP-1 through LEP- 4 Rev 3.12 Fire.Protection.

TRM 3.12-4, Rev 53 02/02 B3.8 Electrical Power TRM B3.8.3-1, Rev 31 10/9 Systems Insert Title Page Rev 89 06/05/08-88 04/11/08 List of Effective Pages LEP-1 through LEP- 4 Rev 89 06/05/08, TRM 3.12-4, Rev 89 06/08 TRM B3.8.3-1, Rev 89 06/08 END Fermi 2~Technical Requirements Manual L Volume I Detroit Edison ARMS -INFORMATION DTC: TMTRM j File: 1754 DSN: TRM VOL I I Rev: 89 Date 06/05/088 Recipient FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I AqLIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i TRM ii TRM iii TRM iv TRM v *TRM vi TRM 1.0-a TRM 1.0-1 TRM ,2.0-1 TRM 3.0-a Revision Revision.- :Revision:Revision Revision Revisioný": Revision*Revision* Revision'Revision 76 73 31 76 79 31 31 31 31 31 TRM 3.3-31 TRM 3.3-32 TRM 3.3-33 TRM 3.3-34 TRM 3.3-35 TRM 3.3-36 TRM 3.3-37 TRM 3.3-38 TRM 3.3-39 TRM. 3.3-40 TEN, "3 ..-Revision 63..TEN ,3.0 -Revision 72 TEN 3'. 0-;3!.TRM 3.0-4::"TEN 3 .1-a; *TRM 3.1-1 .'" TRm 3.2-1, TRM 3.3-a TEN. 3-b.TRM 3.3-c TRM 3.3-d TRM 3.3-1 TRM 3.3-.2 TRM 3.3-13 TRM 4'TRM 3.3-L5.TRM 3..3--6 TRM 3.3-7 TRM 3.3-8 TRM 3.3-9 TRM 3.3-10 TRM 3.3-11 TRM 3.3-12 TRM 3.3-13 TRM 3.3-13a TRM 3.3-14 TRM 3.3-15.TRM 3.3-16 TRM 3.3-17 TRM 3.3-18 TRM 3.3-19 TRM 3.3-20 TRM 3.3-21 TRM 3.3-22 TRM 3.3-23 TRM 3.3-24 TRM 3.3-25 TRM 3.3-26 TRM 3.3-27 TRM 3.3-28 TRM 3.3-29 TRM 3.3-30 Revision Revision Revision 41kRevision Revision Revision Revision Revision Revisioný,Revision

.'.Revision Revision Revision.3 Revision Revision Revision-Revision Revision.Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 54.72 3.1 31 31 31 31 31'31 34 59 31 31 31 31 31 31 31 31-31 67 74 67 67 31 31 31 52 31 31 59 31 31 31 31 31 31 76 76 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.3-41 3.3-42 3.3-43 ,3.3-44 3.3-45 3.3-46 3.3-47 3.3-48 3.3-49 3.4-a 3.4-1 3.4-la 3.4-lb 3.4-2 3.4-3 3.4-4 3.4-5 3.4-6 3.4-7 3.4-8 3.4-9 3.4-10 3.5-1 3.6-a 3.6-1 3.6-2 3.6-3 3.6-4 3.6-5 3.6-6 3.6-7 3.6-8 3.6-9 3.6-10 3.6-11 3.6-12 3.6-13 3.6-14 3.6-15 3.6-16 3.6-17 3.6-18 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 60 41 72 31 31 56 56 45 62 72-, 31 31 31 31 31 31 36 71 71 31 31 31 31 31 31 31 31 31 31 70 60 67 31 55 87 33 31 31 85 31 31 31 71 31 31 31 31 31 TRM Vol. IýLEP-I REV 89 06/05/08 4: .3, -FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I-LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM TRM-TRM TRM TRM TRM TRM TRM TRM TRM* TRM TRM TRM-TRM TRM TRM TRM TRM TRM TRM TRM TRM TEN TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.6-19 3.6-20 3.6-21 3.6-22 3.6-23 3.6-24 3.6-25 3.6-26 3.6-27 3.6-28 3.6-29 3.6-30 3.6-31 3.6-32 3.6-33 3.6-34 3.6-35 3.7-a 3.7-b 3.7-1 3.7-2 3.7-3 3.7-4 3.7-5 3.7-6 3.7-7 3.7-8 3.7-91 3.7-10 3.7-11 3 .7-12 3.7-13 3.7-14 3.7-15 3.7-16 3.7-17 3.7-18 3.7-19 3.7-20 3.8-a 3.8-1 3.8-2 3.8-3 3.8-4 3.8-5 3.8-6 3.8-7 3.8-8 3.8-9 3.8-10 3.8-11 3.8-12 Revision Revision Revision Revision Revision Revision Revision Revision-Revision Revision*Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision.Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision* Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 31 31 58 31 31 31 31 31 31 31 70 31 31 31 73 31 60 70 70 73 31-31 31 31 31 44 31 72 31 31 83 31 31 77 31 79 31 31 31 73 31 31 50 50 50 50 50 50 31 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM 3.8-13.3.8-14 3.8-15 3.8-16 3.8-17 3.8-18 3.9-a 3.9-1 3.9-2 3.9-3".3.9-4K 3.9-5S 3.10-1 3.11-a.3.11-1 3.12-a 3.12-1 3.12-2 3.12-3 3.12-4 3.12-5 3.12-6 3.12-7 3.12-8 3.12-9 3.12-10 3.12-11 3.12-12 3.12-13 3.12-14 3.12-15 3.12-16 3.12-17 3.12-18 3.12-19 3.12-20 3.12-21 3.12-22 3.12-23 3.12-24 3.12-25 3.12-26 3.12-27 3.12-28 3.12-29 3.12-30 4.0-1 5.0-a 5.0-1 5.0-2 5.0-3 5.0-4 Revision 61 Revision 46 Revision 31.: Revision 31'Revision 43 Revision 33 Reyision .31 Revision'-31 Re vision :650 Revision .80 Revision8,8 1 8, Revis.ion q31:.Revis'ion 317 'Revision 31, Revision .31 Revision 75 Revision531 Revision 31 Rev.ision.389-Revisi on 53 .5 -Revision -,53 Rev-ision 9-31 Revision Revision ,30.Revision _31.Revision 49 Revision-31.

Revision T75 Revision 31 Revision 3-1 Revision T5 Revision-,31 Revision 75 Revision 31 Revision :75 Revision 31 Revision 31 Revision 31 Revision 31 Revision 3-1 Revision 75 Revision 31 Revision 31 Revision 78 Revision 31 Revision 31 Revision 31 Revision Revision Revision Revision 31 31 31 31 TRM Vol. I LEP-2 REV 89 06/05/08 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM TRM....TRM.TRM TRM TRM TRME TRME TRM 5.0-5 5.0-6 5:.0-7 5ý. 0- 8 5.0-9 B1.0-1 B2.0-1 B3.0-1 B3. 0-2 Revision Revision Revision Revision Revision Revision Revisi,3-On 31 31 31 31 31 31 31 63 63 ,TEN- 33.0-2a-ý.i:,,;.Re~vislion 72:;-TRM.. 33'.0-2b': Revisi"on ,.I TRM. B3.0 -2C.:.. I.: Revis4ion.72 TRM 33. 0-3 :.Re'v is-in 3'i -TRME B3.0-4 Revision .3 1 TEN` I33. 0-5 Revisi.on

-54 TRME TRME TRM TRM TRM TRM'TRM B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3.1-1 33.3.1-2 B3.3.2-1 Revision".72 Revision 72 Revision 31 Revision"31_.

Revisi6n:

31 Revision.31,-Reviaion 3 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.4.6-1 B3.4.7-1 33.5-1 33.6.1-1 33.6.2-1 B3.6.3-1 33.6.4-1 33.6.5-1 B33 6.6-1 B3.6.7-1 33.6. 8-'1.33.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 33.7.5-1 33.7.6-1 B3.7.7-1 33.7.8-1 33.7.9-1 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 33.8.5-1 33.8.6-1 B3.9.1-1 B3.9.2-1 B3.9.3-1 33.9.4-1 B3. 10-1 B3.11.1-1 B3.12. 1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 33.12.5-I B3.12.6-1 B3.12.7-1 B3.12.8 -1 Revision 31 Revision 31 Revision 31 Revision 31 Revision 67 Revision 87 Revision 31 Revision 31 Revision 70 Revision 31 Revision 31 Revision 31 Revision 31 Revision 713 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 79 Revision 31 Revision 31 Revision 89 Revision.

31 Revision 31 Revision 43 Revision.

31 Revision 65 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 44 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 Revision 31 7` TRMEN'B33.3.2

-2.,:";.:

Revision .31 TRMN B3.3.3-1lh' Revision 67 TRMEN B3.3 4 -1, Revisiion, 31: TRM ýB343.3 4 -2 Revis~ion

-8 4 TRMEN B3. 3.5- Revision 31 TRMENB3.3.5-2-.r-, Revision.

31 TRM..B3 3.6--1 Revision 31 TRE B3.3.6-2.TREN B333.6-3.TRM 33.3.6-4 -TRM, B3.3.6-5 TRMEN33.3.6-67..

TRM B3.3.7-1.TRME B3.3.7-2 .l TRM 33.3.8-1, TRMB3N .3.9-1 TRM 33.3.10-1 TRM B3.3.11-1 TRMEB33.3.12-1 TRM 33.3.13-1 TRM B3.3.14-1 TRM B3.4.1-1 TRM B3.4.1-2 TRM B3.4.1-3 TRM B3.4.1-4 TRM B3.4.1-5 TRM 33.4.2-1 TRM B3.4.3-1 TRM B3.4.4-1 TRM 33.4.5-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision..Revision.Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 31 31 31 76','-76 , 31 70 -31 31 56 45 62 31 31 31 71 71 71 71 31 31 31 31 TRM Vol. I LEP- 3 REV 89 06/05/08 FERMI 2 -oTECHNICAL'REQUIREMENTS MANUAL VOL I Ab)LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 13, Revision 0 Page Revision Notation Page 12 3 4-15 6 7 9 12 13 14-15 16,*. 17 18*'19 20 21 22, 0 0 0 0 0 0.0 0 0 0 0 0 0 0 0 0~~0.0 0 0 0 0 t TRM Vol. I LEP-4 REV 89 06/05/08 Fire Detection Instrumentation ATR 3.12.1 TABLE TR3.12.1-1 (Page 1 of 3)Fire Detection Instrumentation FIRE ....... TOTAL NUMBER OF INSTRUMENTS(a)

DETECTION -IONIZATION PHOTOELECTRIC THERMAL INFRARED FUNCTION ZONE WYy). (X/Y) (X/Y) (X/Y)I. Reactor Building, (b) * .a. Torus area 1 8/0 b. NW corner'rooms.

RHR pump.-.....

.*c. SW corner.rooms.

RHR pump d. SE corner rooms CRD HPCI e. NE corner rooms RCIC f.. First floor g. EECW system area second floor h. Third floor i. Fourth floor...:J

..j. Refueling area,..fifth floor 2 ..... ...,.:...: 3. 4 4/.0, 4 : .:- 9/" ...0 : 5 7 10 5/0 2"770 ':;21/0 ,.8/0 15 17:17 .', l5/O 2./ 0 10/0 2. Auxiliary Building:.

a. Basement N control air equipment b. Corridors, 562 ft, 563 ft, c. First floor mezzanine cable.tray, 583 ft, 603 ft d. Switchgear room, corridor area second, floor e. Cable tunnel.4 5:, 6/0..... 2/0:.... ' o 2/0 6 lI-9 9 10/0 10/0 (continued)(a) (xlY) X is number of Function A (early-warning fire detection and notification only)instruments.

Y is number of Function B (actuation of fire suppression system and early warning and notification) instruments.(b) The fire detection instruments located within the containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.TRM Vol. I TRM 3.12-4 REV 89 06/08 AC Sources TR B3.8.3 I TR B3.8 ELECTRICAL POWER SYSTEMS-:--__.-TR B3;8.;3 AC Sources BASES See Bases for Technical Specification 3.8.1, AC Sources -Operating and 3.8.2,._AC

-Sources- Shutdown.-- TRSR 3.8.3.1 requires performing periodic Preventive Maintenance (PM) inspection of the diesel generator in accordance with established site procedures.'

The' PM': -"procedhues are established in association with manufacturer's recommendations-fbr' performing periodic' inspection.

Industry and plant-specific operating experience-historical equipment testing and performance, and other information or analyse-<s may *be used to justify plant-specific differences from manufacturer's

.:recommendations in performing the inspection.

Differences must be documented

ýand.supported by soun'd technical bases.TRM Vol.I TRM B3.8.3-1 REV. 89 06/08