Byron, Units 1 & 2, EOC Annual Assessment Inspection/Activity Plan
ML100610236
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/03/2010
From: West S K
Division Reactor Projects III
To: Pardee C G
Exelon Generation Co, Exelon Nuclear
References
Download: ML100610236 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010

Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2, 05000454/2010001 AND 05000455/2010001

Dear Mr. Pardee:

On February 10, 2010, the NRC staff completed its performance review of Byron Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Byron Station, Units 1 and 2, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). While plant performance for the last three quarters was in the Licensee Response column of the Action Matrix, there was a safety significant inspection finding in the Initiating Events Cornerstone classified as having low-to-moderate safety significance (White) that affected the first quarter of the assessment period.

The White finding was closed in the first quarter of 2009 and both units returned to the Licensee Response column in the second quarter of 2009.

Therefore, the NRC plans to conduct reactor over sight process (ROP) baseline inspections at your Byron Station. The NRC also plans to conduct several special and infrequently performed inspection procedures (IPs), which include inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation.

C. Pardee

The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. Please note that we plan on conducting two infrequently performed IPs:

IP 60854.1, "Preoperational Testing of an Independent Spent Fuel Storage Facility Installation at Operating Plants," and IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," this year at your Byron Station. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of our inspectors' arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard A. Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/ Steven West, Director Division of Reactor Projects

Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan

cc w/encl: Distribution via ListServ Inspection / Activity Plan Page 1 of 2 02/24/2010 Report 22 03/01/2010

-06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron ISFSI-ISFSI INSPECTION 1 1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 60854.1 03/01/2010 06/30/2010 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 06/01/2010 08/31/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/12/2010 04/16/2010 1 IP Occupational ALARA Planning and Controls 71124.02 04/12/2010 04/16/2010 BI ENG-ENGINEERGIN INSERVICE INSPECTION 1 2 IP Reactor Coolant System Dissimiliar Metal Butt Welds 2515/172 04/19/2010 05/07/2010 2 IP Inservice Inspection Activities - PWR 7111108P 04/19/2010 05/07/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiation Monitoring Instrumentation 71124.05 07/12/2010 07/16/2010 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION 2 1 IP Radiological Environmental Monitoring Program 7111402 07/12/2010 07/16/2010 1 IP Emergency Response Organization Augmentation Testing 7111403 07/12/2010 07/16/2010 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/12/2010 07/16/2010 1 IP Drill/Exercise Performance 71151-EP01 07/12/2010 07/16/2010 1 IP ERO Drill Participation 71151-EP02 07/12/2010 07/16/2010 1 IP A lert & Notification System 71151-EP03 07/12/2010 07/16/2010 BI ENG-TRIENNIAL HEAT SINK INSPECTION 2 1 IP Heat Sink Performance 7111107T 08/09/2010 08/13/2010 OL PREP-BYRON INIT PREP - SEPT. 2010 3 1 OL - INITIAL EXAM - SEPT/OCT 2010 - BYRO W90216 09/06/2010 09/10/2010 OL EXAM-BYRON INIT EXAM - SEPT.-OCT. 2010 3 1 OL - INITIAL EXAM - SEPT/OCT 2010 - BYRO W90216 09/27/2010 10/08/2010 HEAD-POLAR CRANE SINGLE FAILURE PROOF UPGRADE 1 1 IP Refueling and Other Outage Activities 7111120 10/05/2010 10/22/2010 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION 3 1 IP Fire Protection [Triennial]

7111105T 10/18/2010 11/05/2010 BI ENG-TRIENNIAL FIRE INS INFO GATHERING TRIP 5 1 IP Fire Protection [Triennial]

7111105T 10/04/2010 10/08/2010 BI OL-LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2 1, 2 IP Licensed Operator Requalification Program 7111111B 10/25/2010 10/29/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 11/29/2010 12/03/2010 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Inspection / Activity Plan Page 2 of 2 02/24/2010 Report 22 03/01/2010

-06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Byron BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/29/2010 12/03/2010 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 11/29/2010 12/03/2010 1 IP Reactor Coolant System Activity 71151-BI01 11/29/2010 12/03/2010 1 IP Occupational Exposure Control Effectiveness 71151-OR01 11/29/2010 12/03/2010 1 IP RETS/ODCM Radiological Effluent 71151-PR01 11/29/2010 12/03/2010 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 01/10/2011 01/14/2011 1 IP Occupational Dose Assessment 71124.04 01/10/2011 01/14/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/14/2011 03/18/2011 1 IP Occupational ALARA Planning and Controls 71124.02 03/14/2011 03/18/2011 BI ENG-ENGINEERING INSERVICE INSPECTION - U1 1 1 IP Inservice Inspection Activities - PWR 7111108P 03/14/2011 04/09/2011 BI RP-RADIATION PROTECTION BASELINE INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 04/11/2011 04/15/2011 1 IP Public Radiation Safety 71124.07 04/11/2011 04/15/2011 BI ENG-TRIENNIAL ENGINEERING PERM MODS/50.59 3 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 05/09/2011 05/27/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

C. Pardee

The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. Please note that we plan on conducting two infrequently performed IPs:

IP 60854.1, "Preoperational Testing of an Independent Spent Fuel Storage Facility Installation at Operating Plants," and IP 60855.1, "Operation of an Independent Spent Fuel Storage Installation at Operating Plants," this year at your Byron Station. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of our inspectors' arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC

=s A Rules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard A. Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely, /RA/ Steven West, Director Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via ListServ See Previous Concurrences DOCUMENT NAME: G:\1-Secy\1-Work in Progress\2009 EOC Letters\Byron 2009 EOC Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RSkokowski:dtp

  • RN for SWest DATE 02/25/10 03/03/10 OFFICIAL RECORD COPY

Letter to C. Pardee from S. West dated March 3, 2010.

SUBJECT:

ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2, 05000454/2010001 AND 05000455/2010001

DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource

RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker

Carole Ariano

Linda Linn

DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource