ML100610236

From kanterella
Jump to navigation Jump to search
EOC Annual Assessment Inspection/Activity Plan
ML100610236
Person / Time
Site: Byron  Constellation icon.png
Issue date: 03/03/2010
From: Stephanie West
Division Reactor Projects III
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
Download: ML100610236 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 March 3, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555

SUBJECT:

ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2, 05000454/2010001 AND 05000455/2010001

Dear Mr. Pardee:

On February 10, 2010, the NRC staff completed its performance review of Byron Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the Security Cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at Byron Station, Units 1 and 2, was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). While plant performance for the last three quarters was in the Licensee Response column of the Action Matrix, there was a safety significant inspection finding in the Initiating Events Cornerstone classified as having low-to-moderate safety significance (White) that affected the first quarter of the assessment period.

The White finding was closed in the first quarter of 2009 and both units returned to the Licensee Response column in the second quarter of 2009.

Therefore, the NRC plans to conduct reactor oversight process (ROP) baseline inspections at your Byron Station. The NRC also plans to conduct several special and infrequently performed inspection procedures (IPs), which include inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation.

C. Pardee The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. Please note that we plan on conducting two infrequently performed IPs:

IP 60854.1, Preoperational Testing of an Independent Spent Fuel Storage Facility Installation at Operating Plants, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, this year at your Byron Station. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of our inspectors arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard A. Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

Byron Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site ISFSI - ISFSI INSPECTION 1 03/01/2010 06/30/2010 IP 60854.1 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 06/01/2010 08/31/2010 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/12/2010 04/16/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/12/2010 04/16/2010 IP 71124.02 Occupational ALARA Planning and Controls BI ENG - ENGINEERGIN INSERVICE INSPECTION 1 04/19/2010 05/07/2010 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/19/2010 05/07/2010 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 07/12/2010 07/16/2010 IP 71124.05 Radiation Monitoring Instrumentation BI EP - EP ROUTINE INSPECTION / PI VERIFICATION 2 07/12/2010 07/16/2010 IP 7111402 Radiological Environmental Monitoring Program 07/12/2010 07/16/2010 IP 7111403 Emergency Response Organization Augmentation Testing 07/12/2010 07/16/2010 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/12/2010 07/16/2010 IP 71151-EP01 Drill/Exercise Performance 07/12/2010 07/16/2010 IP 71151-EP02 ERO Drill Participation 07/12/2010 07/16/2010 IP 71151-EP03 Alert & Notification System BI ENG - TRIENNIAL HEAT SINK INSPECTION 2 08/09/2010 08/13/2010 IP 7111107T Heat Sink Performance OL PREP - BYRON INIT PREP - SEPT. 2010 3 09/06/2010 09/10/2010 W90216 OL - INITIAL EXAM - SEPT/OCT 2010 - BYRO OL EXAM - BYRON INIT EXAM - SEPT.-OCT. 2010 3 09/27/2010 10/08/2010 W90216 OL - INITIAL EXAM - SEPT/OCT 2010 - BYRO HEAD - POLAR CRANE SINGLE FAILURE PROOF UPGRADE 1 10/05/2010 10/22/2010 IP 7111120 Refueling and Other Outage Activities BI ENG - TRIENNIAL FIRE PROTECTION INSPECTION 3 10/18/2010 11/05/2010 IP 7111105T Fire Protection [Triennial]

BI ENG - TRIENNIAL FIRE INS INFO GATHERING TRIP 5 10/04/2010 10/08/2010 IP 7111105T Fire Protection [Triennial]

BI OL - LIC. OPERATOR REQUAL. PROGRAM EVALUATION 2 10/25/2010 10/29/2010 IP 7111111B Licensed Operator Requalification Program BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/29/2010 12/03/2010 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS

Byron Inspection / Activity Plan 03/01/2010 - 06/30/2011 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 11/29/2010 12/03/2010 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 11/29/2010 12/03/2010 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 11/29/2010 12/03/2010 IP 71151-BI01 Reactor Coolant System Activity 11/29/2010 12/03/2010 IP 71151-OR01 Occupational Exposure Control Effectiveness 11/29/2010 12/03/2010 IP 71151-PR01 RETS/ODCM Radiological Effluent BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 01/10/2011 01/14/2011 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 01/10/2011 01/14/2011 IP 71124.04 Occupational Dose Assessment BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/14/2011 03/18/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/14/2011 03/18/2011 IP 71124.02 Occupational ALARA Planning and Controls BI ENG - ENGINEERING INSERVICE INSPECTION - U1 1 03/14/2011 04/09/2011 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/11/2011 04/15/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/11/2011 04/15/2011 IP 71124.07 Public Radiation Safety BI ENG - TRIENNIAL ENGINEERING PERM MODS/50.59 3 05/09/2011 05/27/2011 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications

C. Pardee The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2011. Please note that we plan on conducting two infrequently performed IPs:

IP 60854.1, Preoperational Testing of an Independent Spent Fuel Storage Facility Installation at Operating Plants, and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, this year at your Byron Station. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of our inspectors arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard A. Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via ListServ See Previous Concurrences DOCUMENT NAME: G:\1-Secy\1-Work in Progress\2009 EOC Letters\Byron 2009 EOC Letter.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RSkokowski:dtp SWest

  • RN for DATE 02/25/10 03/03/10 OFFICIAL RECORD COPY

Letter to C. Pardee from S. West dated March 3, 2010.

SUBJECT:

ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2, 05000454/2010001 AND 05000455/2010001 DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource