ML20174A567

From kanterella
Jump to navigation Jump to search
Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000455/2020003
ML20174A567
Person / Time
Site: Byron Constellation icon.png
Issue date: 06/22/2020
From: Atif Shaikh
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020003
Download: ML20174A567 (9)


See also: IR 05000455/2020003

Text

June 22, 2020

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION, UNIT 2NOTIFICATION OF NRC BASELINE INSPECTION

AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000455/2020003

Dear Mr. Hanson:

On October 12, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This onsite inspection is scheduled to be performed

October 12, 2020 through October 23, 2020.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at the

site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be Ms. Zoe Cox, of your organization. If there are any

questions about this inspection or the material requested, please contact the lead inspector

Atif Shaikh at 630-829-9824, or via e-mail at Atif.Shaikh@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

B. Hanson -2-

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Atif Shaikh, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-455

License No. NPF-66

Enclosure:

Document Request for Inservice Inspection

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Atif Shaikh dated June 22, 2020.

SUBJECT: BYRON STATION, UNIT 2NOTIFICATION OF NRC BASELINE INSPECTION

AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000455/2020003

DISTRIBUTION:

Jessie Quichocho

Omar Lopez-Santiago

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML20174A567

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME AShaikh:mb

via e-mail

DATE 06/22/2020

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR INSERVICE INSPECTION

Inspection Report: 05000455/2020003

Inspection Dates: October 12 - 23, 2020

Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector: Atif Shaikh, DRS

630-829-9824

Atif.Shaikh@nrc.gov

A. Information for the In-Office Preparation Week

The following information (electronic copy) is requested by September 12, 2020, to

facilitate the selection of specific items that will be reviewed during the onsite inspection

week. The inspector will select specific items from the information requested below

and request a list of additional documents needed onsite to your staff. We request that

the specific items selected from the lists be available and ready for review on the first

day of inspection. The following information is applicable to the outage Unit unless

otherwise indicated. If you have any questions regarding this information, please call

the inspector as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:

a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2 Systems and

containment, performed as part of your American Society of Mechanical

Engineers (ASME) Code Inservice Inspection (ISI) Program (include edition and

addenda of Code committed to), and NDEs planned for other systems

performed as part of a Risk-Informed ISI Program, or other augmented

inspection programs (e.g., ASME Code Case N-770 examination of dissimilar

metal welds and examinations to meet an industry initiative);

b. Reactor vessel upper head examinations required by Title 10 of the Code of

Federal Regulations (CFR), Part 50.55a(g)(6)(ii)(D) and Code Case N-729;

c. Steam generator (SG) tube inspection and repair activities for the

upcoming outage or SG secondary side examinations; 1 and 0F

d. Welding on Code Class 1, 2, or 3 components. For each weld examination,

include the weld identification number, description of weld (component name),

category, class, type of exam and procedure number, and date of examination.

2. A copy of the NDE procedures, SG eddy current examination (ET) acquisition and

analysis procedures, and welding procedures used to perform the activities

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur,

and no further information is required for the items identified above requesting SG related information.

Enclosure

DOCUMENT REQUEST FOR INSERVICE INSPECTION

identified in Item A.1 (including NDE calibration and flaw characterization/sizing

procedures and Welding Procedure Qualification Records). For ultrasonic

examination procedures qualified in accordance with Appendix VIII, of Section XI of

the ASME Code, provide documentation supporting the procedure qualification

(e.g., the Electric Power Research Institute performance demonstration qualification

summary sheets). For SG tube ET this includes the acquisition and analysis

procedures.

3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations

identified in Item A.1.

4. A copy of the 10-year ISI Program showing those required exams scheduled to be

performed this outage, and those which have been completed.

5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2

Systems since the beginning of the last refueling outage.

6. List of repair/replacement welds in Code Class 1, 2 and 3 Systems, which have

been fabricated since the beginning of the last refueling outage and identify the

system, weld number, and reference applicable documentation (e.g., NIS-2 forms

with definitions of system and component acronyms).

7. List of reactor vessel weld examinations required by the ASME Code that are

scheduled to occur during the upcoming refueling outage, and please provide a

detailed description of the welds and the extent of the planned examination.

8. Corrective action list of ISI and SG-related issues such as piping or SG tube

degradation or damage (e.g., cracks, wall thinning, wear, microbiologically induced

corrosion) or errors identified during piping/SG tube examinations since the

beginning of the last refueling outage. Also, include a list of corrective actions

associated with foreign material in the reactor vessel, primary coolant system,

SG or feed systems since the beginning of the last refueling outage.

9. Title 10 CFR Part 21 reports applicable to your structures, systems, or components

within the scope of ASME Code Section XI that have been identified since the

beginning of the last refueling outage.

10. Copy of SG history documentation given to vendors performing ET of the SGs

during the upcoming outage. 1 1F

11. Copy of procedure containing screening criteria used for selecting tubes for in-situ

pressure testing and the procedure to be used for in-situ pressure testing.1

12. Copy of previous outage SG tube operational assessment completed following

ET of the SGs (provide this document even if no SG ET is planned for current

outage).

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur,

and no further information is required for the items identified above requesting SG-related information.

2

DOCUMENT REQUEST FOR INSERVICE INSPECTION

13. Copy of most recent SG Degradation Assessment (provide this document even if

no SG ET is planned for current outage).

14. Copy of most recent SG Condition Monitoring Assessments.1

15. Copy of the document defining the planned SG ET scope (e.g., 100 percent of

unrepaired tubes with bobbin probe and 20 percent sample of hot leg expansion

transition regions with rotating probe) and identify the scope expansion criteria,

which will be applied. Also identify and describe any deviations in this scope or

expansion criteria from the Electric Power Research Institute Guidelines.1

16. Copy of the document describing the ET acquisition equipment to be applied

including ET probe types. Also identify the extent of planned tube examination

coverage with each probe type (e.g., rotating probe - 0.080 inches, 0.115 inches

pancake coils and mid-range + point coil applied at the top-of-tube-sheet plus

3 inches to minus 12 inches). 1 2F

17. Provide procedures with guidance/instructions for identifying (e.g., physically

locating the tubes that require repair) and plugging SG tubes.1

18. Identify and quantify any SG tube leakage experienced during the previous

operating cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition.

19. Point of contact information (name and site number) for the following activities:

a. ISISite and vendor leads;

b. Boric Acid Inspections and Evaluations;

c. Reactor Vessel Head InspectionSite and vendor leads;

d. SG InspectionSite and vendor leads;

e. Aging Management Programs; and

f. Site Welding Engineer.

B. Onsite Information to be Provided to the Inspector on the First Day of the

Inspection (e.g., Following the Entrance Meeting). Please Provide Hard Copies

(e.g., Paper Records) of the Following Documents.

1. For welds selected by the inspector from Item A.1.d and A.6 above, provide copies

of the following documents:

a. Document of the weld number and location (e.g., system, train, branch);

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur,

and no further information is required for the items identified above requesting SG related information.

3

DOCUMENT REQUEST FOR INSERVICE INSPECTION

b. Document with a detail of the weld construction (e.g., drawing);

c. Applicable portions of the Design Specification and applicable Code of

construction for the weldment (e.g., B31.1 or ASME Section III);

d. Applicable Code Edition and Addenda for weld procedure qualification;

e. Applicable weld procedure specifications and weld data sheets used to fabricate

the welds;

f. Copies of procedure qualification records supporting the weld procedure

specifications;

g. Copies of welders performance qualification records;

h. Copies of mechanical test reports identified in the weld procedure qualification

records above;

i. Copies of the nonconformance reports for the selected welds;

j. Access to radiographs and equipment to view radiographs of the selected

welds;

k. ASME Code Section XI repair replacement plan and reconciliation for

replacement components/materials;

l. Certified Material Test Reports for replacement pressure boundary materials;

and

m. Copies of the NDE required by the construction Code and the pre-service

examination records required by the ASME Code Section XI for the selected

welds.

2. For the ISI-related corrective action issues selected by the inspector from Item A.8

above, provide a copy of the corrective actions and supporting documentation.

3. For the NDE reports with relevant indications on Code Class 1 and 2 Systems

selected by the inspector from Item A.5 above, provide a copy of the examination

records and associated corrective action documents.

4. Updated schedules for Item A.1 (including schedule showing contingency repair

plans if available).

5. Fabrication Drawings (D size) of the reactor vessel welds (including vessel head

J-groove welds) if any are to be examined during the outage. Also provide any

drawings used by NDE vendors to locate these welds.

6. Copy of the procedures which govern the scope, equipment used, and

implementation of the inspections required to identify boric acid leakage from

systems and components above the vessel head.

4

DOCUMENT REQUEST FOR INSERVICE INSPECTION

7. Copy of:

a. Engineering evaluations/assessments of boric acid related deposits and

associated wastage or corrosion for safety-related components; and

b. Corrective action records for coolant leakage including boric acid deposits on

safety-related components identified since the beginning of the last refueling

outage.

8. Copy of the plant procedures used to perform inspections to identify reactor coolant

system leaks or boric acid deposits and the procedures for resolution of leaks or

boric acid deposits.

9. Copy of the documents which demonstrate that the procedures to be used for

volumetric examination of the reactor vessel head penetration J-groove welds were

qualified by a blind demonstration test in accordance with

10 CFR 50.55a(g)(6)(ii)(D).

10. Copy of volumetric, surface and visual examination records for the prior inspection

of the reactor vessel head and head penetration J-groove welds.

11. Provide a copy of the Electric Power Research Institute Examination Technique

Specification Sheets and vendor related documents, which support qualification of

the ET probes to be used during the upcoming SG tube inspections. 1 3F

12. Provide a copy of the guidance to be followed if a loose part or foreign material is

identified in the SGs.1

13. Identify the types of SG tube repair processes which will be implemented for

defective SG tubes (including any U.S. Nuclear Regulatory Commission

reviews/evaluation/approval of this repair process). Provide the flaw depth sizing

criteria to be applied for ET indications identified in the SG tubes.1

14. Copy of document describing actions to be taken if a new SG tube degradation

mechanism is identified.1

15. Provide document which defines the scope of SG secondary side examinations (if

any are planned) and identify site specific operational history related to degradation

of SG secondary side components (if any).

16. Provide procedures with guidance/instructions for identifying (e.g., physically

locating the tubes that require repair) and plugging SG tubes.1

17. Provide copies of the following standards at the onsite U.S. Nuclear Regulatory

Commission inspection location for the duration of the inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to the

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur,

and no further information is required for the items identified above requesting SG related information.

5

DOCUMENT REQUEST FOR INSERVICE INSPECTION

ISI Program and the Repair/Replacement Program;

b. Copy of the performance demonstration initiative (PDI) generic procedures with

the latest applicable revisions that support site qualified ultrasonic examination

of piping welds and components (e.g., PDI-UT-1, PDI-UT-2, PDI-UT-3,

PDI-UT-10 etc.);

c. Electric Power Research Institute and industry standards referenced in the site

procedures used to perform the SG tube ET, which includes Electric Power

Research Institute documents: SG Examination Guidelines, SG Integrity

Assessment Guidelines, SG In-Situ Pressure Test Guidelines; 1 and 4F

d. Boric Acid Corrosion Guidebook Revision 1Electric Power Research Institute

Technical Report 1000975.

18. Provide training (e.g., Scaffolding, Fall Protection, Foreign Material Exclusion) if

required to access the non-destructive examinations selected by the inspector for

observation.

If you have questions regarding the information requested, please contact the lead inspector.

1 Note 1- If no SG examinations are planned for this outage, please confirm when the next SG examination will occur,

and no further information is required for the items identified above requesting SG related information.

6