ML22333A771

From kanterella
Jump to navigation Jump to search
Request for Information for an NRC Post Approval Site Inspection for License Renewal Inspection Report 05000454/2023010
ML22333A771
Person / Time
Site: Byron Constellation icon.png
Issue date: 11/29/2022
From: Nestor Feliz-Adorno
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2022010
Download: ML22333A771 (1)


See also: IR 05000454/2023010

Text

November 29, 2022

Mr. David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Officer (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION

REPORT 05000454/2023010

Dear Mr. Rhoades:

On March 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval

Site Inspection for License Renewal at Byron Unit 1 Station. This inspection will be performed

in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus on outage

related activities to verify license conditions added as part of your renewed license and a

sample of license renewal commitments have been implemented.

In order to minimize the inspection impact on the site and to ensure a productive inspection for

both parties, we have enclosed a request for information needed for the inspection. It is

important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into two groups:

The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspector will identify as

much as possible the information and activities to be reviewed during the inspection. This

information should be provided to the inspector by January 23, 2023.

The second group includes the additional information required for the inspector to review the

selected activities. This information should be available to the inspector onsite March 6,

2023. It is also requested that corrective action documents and/or questions developed

during the inspection be provided to the inspector as the documents are generated.

The inspector for this license renewal inspection is Matt Domke. We understand that our

primary contact for this inspection is Ms. Cox of your organization. If there are any questions

about the inspection or the material requested in the enclosure, please contact the lead

inspector at 630-829-9562 or via e-mail at Matthew.Domke@nrc.gov.

D. Rhoades 2

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRCs document system (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Signed by Feliz-Adorno, Nestor

on 11/29/22

Néstor Féliz-Adorno, Chief

Engineering Reactor Projects Branch

Division of Operating Reactor Safety

Docket No. 50-454

License No. NPF-37

Enclosure:

Document Request for

Post-Approval Site Inspection

for License Renewal

cc w/encl: Distribution via LISTSERV

D. Rhoades 3

Letter to David Rhoades from Néstor Féliz-Adorno dated November 29, 2022.

SUBJECT: BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC

POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION

REPORT 05000454/2023010

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

John Giessner

Julio Lara

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML22333A771

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII RIII

NAME MDomke:gmp NFéliz-Adorno

DATE 11/29/2022 11/29/2022

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

Inspection Report: 05000454/2023010

Inspection Dates: March 6, 2023 - March 24, 2023

Inspection Procedure: IP 71003 Post-Approval Site Inspection for License Renewal

Inspector: Matt Domke

630-829-9562

Matthew.Domke@nrc.gov

I. Information Requested Prior to the On-Site Inspection Week

The following information is requested by January 23, 2023, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the inspector as soon as possible. Filenames should be descriptive and indexed to

facilitate ease of use. Information lists should contain enough information to be easily

understood by someone who has knowledge of light water reactor technology.

1. Provide a list of your license renewal commitments with an approximate

completion status of each.

2. Provide a list of your Aging Management Programs (AMPs), copies of the

program basis documents for each, and a listing of the action tracking items for

each.

3. For AMPs that are one-time inspection programs, provide a list of completed

work order numbers for inspections that have been completed. This may be

incorporated with the previous item and should include identification of the

inspected component.

4. Provide a list of the one-time inspections credited for license renewal that will be

completed during your outage. This list should include at least the system,

component, work order number, and type of inspection.

5. Provide a listing of other planned inspections which will be conducted during the

outage, that are credited for license renewal. Of particular interest are those that

provide observations of areas that are generally inaccessible at power, (e.g., tank

internal inspections, drywell liner inspections and containment coating

inspections). Include work order numbers where applicable.

6. Provide an outage schedule, sufficiently detailed as to list the work orders noted

in Items 4 and 5.

Enclosure

DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL

7. Provide current management and license renewal organizational charts.

8. Provide electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

9. Provide copies of any internal/external self-assessments and associated

corrective action documents generated in preparation for the inspection.

II. Information Requested to be Available When the Inspectors Arrive On-Site on

March 6, 2023

1. Copies of the work orders requested during the preparation week. This will

include work orders of inspections to be observed and completed work orders to

be reviewed by the inspector.

2. Contact information for the Outage Control Center to facilitate inspector

observation of the selected work orders.

3. Documentation demonstrating completion of license renewal commitments which

are complete as of the inspection date. For example, this may be in the form of a

binder for each commitment which includes the implementing documentation and

references.

III. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

If you have questions regarding the information requested, please contact the inspector.

2