Mr. David Rhoades
Senior Vice President
Constellation Energy Generation, LLC
President and Chief Nuclear Officer (CNO)
Constellation Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION
REPORT 05000454/2023010
Dear Mr. Rhoades:
On March 6, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval
Site Inspection for License Renewal at Byron Unit 1 Station. This inspection will be performed
in accordance with NRC Inspection Procedure (IP) 71003. This inspection will focus on outage
related activities to verify license conditions added as part of your renewed license and a
sample of license renewal commitments have been implemented.
In order to minimize the inspection impact on the site and to ensure a productive inspection for
both parties, we have enclosed a request for information needed for the inspection. It is
important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in-office
preparation activities. During the in-office preparation activities, the inspector will identify as
much as possible the information and activities to be reviewed during the inspection. This
information should be provided to the inspector by January 23, 2023.
The second group includes the additional information required for the inspector to review the
selected activities. This information should be available to the inspector onsite March 6,
2023. It is also requested that corrective action documents and/or questions developed
during the inspection be provided to the inspector as the documents are generated.
The inspector for this license renewal inspection is Matt Domke. We understand that our
primary contact for this inspection is Ms. Cox of your organization. If there are any questions
about the inspection or the material requested in the enclosure, please contact the lead
inspector at 630-829-9562 or via e-mail at Matthew.Domke@nrc.gov.
November 29, 2022
D. Rhoades
2
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRCs Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRCs document system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Néstor Féliz-Adorno, Chief
Engineering Reactor Projects Branch
Division of Operating Reactor Safety
Docket No. 50-454
License No. NPF-37
Enclosure:
Document Request for
Post-Approval Site Inspection
for License Renewal
cc w/encl: Distribution via LISTSERV
Signed by Feliz-Adorno, Nestor
on 11/29/22
D. Rhoades
3
Letter to David Rhoades from Néstor Féliz-Adorno dated November 29, 2022.
SUBJECT:
BYRON STATION UNIT 1 REQUEST FOR INFORMATION FOR AN NRC
POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL INSPECTION
REPORT 05000454/2023010
DISTRIBUTION:
RidsNrrDorlLpl3
RidsNrrPMByron Resource
RidsNrrDroIrib Resource
R3-DORS
ADAMS Accession Number: ML22333A771
Publicly Available
Non-Publicly Available
Sensitive
Non-Sensitive
OFFICE
RIII
RIII
NAME
MDomke:gmp
NFéliz-Adorno
DATE
11/29/2022
11/29/2022
OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
Enclosure
Inspection Report: 05000454/2023010
Inspection Dates:
March 6, 2023 - March 24, 2023
Inspection Procedure:
IP 71003 Post-Approval Site Inspection for License Renewal
Inspector:
Matt Domke
630-829-9562
Matthew.Domke@nrc.gov
I.
Information Requested Prior to the On-Site Inspection Week
The following information is requested by January 23, 2023, or sooner, to facilitate
inspection preparation. If you have any questions regarding this information, please call
the inspector as soon as possible. Filenames should be descriptive and indexed to
facilitate ease of use. Information lists should contain enough information to be easily
understood by someone who has knowledge of light water reactor technology.
1.
Provide a list of your license renewal commitments with an approximate
completion status of each.
2.
Provide a list of your Aging Management Programs (AMPs), copies of the
program basis documents for each, and a listing of the action tracking items for
each.
3.
For AMPs that are one-time inspection programs, provide a list of completed
work order numbers for inspections that have been completed. This may be
incorporated with the previous item and should include identification of the
inspected component.
4.
Provide a list of the one-time inspections credited for license renewal that will be
completed during your outage. This list should include at least the system,
component, work order number, and type of inspection.
5.
Provide a listing of other planned inspections which will be conducted during the
outage, that are credited for license renewal. Of particular interest are those that
provide observations of areas that are generally inaccessible at power, (e.g., tank
internal inspections, drywell liner inspections and containment coating
inspections). Include work order numbers where applicable.
6.
Provide an outage schedule, sufficiently detailed as to list the work orders noted
in Items 4 and 5.
DOCUMENT REQUEST FOR POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL
2
7.
Provide current management and license renewal organizational charts.
8.
Provide electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.
9.
Provide copies of any internal/external self-assessments and associated
corrective action documents generated in preparation for the inspection.
II.
Information Requested to be Available When the Inspectors Arrive On-Site on
March 6, 2023
1.
Copies of the work orders requested during the preparation week. This will
include work orders of inspections to be observed and completed work orders to
be reviewed by the inspector.
2.
Contact information for the Outage Control Center to facilitate inspector
observation of the selected work orders.
3.
Documentation demonstrating completion of license renewal commitments which
are complete as of the inspection date. For example, this may be in the form of a
binder for each commitment which includes the implementing documentation and
references.
III.
Information Requested to be Provided Throughout the Inspection
1.
Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2.
Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
If you have questions regarding the information requested, please contact the inspector.