UNITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR BYRON STATION, UNITS 1 AND 2 (REPORT 05000454/2011007 AND 05000455/2011007)

Dear Mr. Pacilio:

On February 14, 2012, the Nuclear Regulatory Commission (NRC) staff completed its end-of-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information.

A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Byron Station Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Byron Station Unit 1 during the most recent quarter, as well as the first three quarters of the assessment period, was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green).

The NRC determined the performance at Byron Station Unit 2 during the most recent quarter was within the Regulatory Response column of the NRCs ROP Action Matrix, based on one inspection finding being classified as having low-to-moderate safety significance (White) and all PIs indicated that your performance was within the nominal, expected range (Green). The White finding involved the failure to ensure that a flange connection on the upper lube oil cooler of the 2A diesel generator was correctly torqued following maintenance. This White finding was closed on August 26, 2011, as documented in our letter to you dated October 4, 2011

[ML112770516]. Unit 2 returned to the Licensee Response Column of the ROP Action Matrix in the first quarter of 2012. Therefore, the NRC plans to conduct ROP baseline inspections at your facility. We also plan to conduct several special and infrequently performed inspections related to the pre-operational testing and operation of the Independent Spent Fuel Storage Installation (ISFSI). These inspections include IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installations at Operating Plants; IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants; and IP 60856.1, Review of 10 CFR 72.212(b)

Evaluations at Operating Plants. Temporary Instruction 182, Review of the Implementation of an Industry Initiative to Control the Degradation of Underground Piping and Tanks, will also be conducted at your Byron Station. In addition, a follow-up inspection will be conducted using IP 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to evaluate your corrective actions and extent of condition review related to a Steam Generator Margin-to-Overfill Backfit

[ML110190808] that was issued.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 9 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Eric Duncan at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Steven West, Director Division of Reactor Projects Docket Nos. 50-454 and 50-455 License Nos. NPF-37 and NPF-66 Enclosure: Byron Station Inspection/Activity Plan cc w/encl: Distribution via ListServ

Page 1 of 2 Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1 01/02/2012 02/29/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S OL PREP - BYRON INIT PREP - 01/2012 4 01/02/2012 01/06/2012 W90227 OL - INITIAL EXAM - 2012 JAN - BYRO OL EXAM - BYRON INITIAL EXAM - 01/2012 4 01/23/2012 01/27/2012 W90227 OL - INITIAL EXAM - 2012 JAN - BYRO TI-182 - TI-2515/182 PHASE I - BURIED PIPING 1 01/30/2012 02/01/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping ER SIT - EVENT RESPONSE - SIT 3 01/31/2012 02/03/2012 IP 93812 Special Inspection ISFSI - ISFSI INSPECTION - SCHEDULE DEPENDENT 2 02/01/2012 02/29/2012 IP 60856.1 Review of 10 CFR 72.212(b) Evaluations at Operating Plants 02/01/2012 03/31/2012 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants FOLLOWUP - MARGIN TO OVERFILL BACKFIT CA/EOC RVW 1 11/01/2012 12/20/2012 IP 92723 Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the S BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 03/12/2012 03/16/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 03/12/2012 03/16/2012 IP 71124.02 Occupational ALARA Planning and Controls BI CDBI - COMPONENT DESIGN BASIS INSPECTION 6 05/14/2012 06/15/2012 IP 7111121 Component Design Bases Inspection BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 06/11/2012 06/15/2012 IP 71124.07 Radiological Environmental Monitoring Program 06/11/2012 06/15/2012 IP 71151-BI01 Reactor Coolant System Activity 06/11/2012 06/15/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 06/11/2012 06/15/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent BI EPR - EP ROUTINE INSPECTION / PI VERIFICATION 1 06/25/2012 06/29/2012 IP 7111402 Alert and Notification System Testing 06/25/2012 06/29/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 06/25/2012 06/29/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/25/2012 06/29/2012 IP 71151 Performance Indicator Verification BI ISI - INSERVICE INSPECTION UNIT 1 2 09/10/2012 10/05/2012 IP 7111108P Inservice Inspection Activities - PWR

Page 2 of 2 Byron Inspection / Activity Plan 01/01/2012 - 06/30/2013 Planned Dates No. of Staff Start End Inspection Activity Title on Site BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 09/17/2012 09/21/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 09/17/2012 09/21/2012 IP 71124.02 Occupational ALARA Planning and Controls BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 11/05/2012 11/09/2012 IP 7111111B Licensed Operator Requalification Program BI FIRE - FIRE PROTECTION INSPECTION & BAG TRIP 3 01/14/2013 02/15/2013 IP 7111105T Fire Protection [Triennial]

BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 12/10/2012 12/14/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 02/25/2013 03/01/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment OL PREP - BYRON INIT PREP 04/2013 3 04/01/2013 04/05/2013 W90282 OL - INITIAL EXAM - 2013 APR-MAY - BYRON BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 04/08/2013 04/12/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 04/08/2013 04/12/2013 IP 71124.02 Occupational ALARA Planning and Controls OL EXAM - BYRON INIT EXAM - 04/2013 3 04/29/2013 05/10/2013 W90282 OL - INITIAL EXAM - 2013 APR-MAY - BYRON BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 05/13/2013 05/17/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 05/13/2013 05/17/2013 IP 71124.04 Occupational Dose Assessment