MONTHYEARML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) ML23026A3272023-01-26026 January 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2023001 ML22333A7712022-11-29029 November 2022 Request for Information for an NRC Post Approval Site Inspection for License Renewal Inspection Report 05000454/2023010 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) ML22040A1442022-02-0909 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000455/2022003 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) ML21159A1382021-06-0909 June 2021 Notification of NRC Baseline Inspection and Request for Information, Inspection Report 05000454/2021003 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) ML21007A1222021-01-0707 January 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams); Inspection Report 05000454/2021011; 05000455/2021011 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information IR 05000454/20200052020-09-0101 September 2020 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2020005 and 05000455/2020005) ML20174A5672020-06-22022 June 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000455/2020003 ML20162A0962020-06-10010 June 2020 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000454/2020011; 05000455/2020011 IR 05000454/20190062020-03-0303 March 2020 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2019006 and 05000455/2019006) IR 05000454/20190052019-08-28028 August 2019 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2019005; 05000455/2019005) ML19172A2772019-06-21021 June 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Byron Station, Units 1 and 2 ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency ML19123A0362019-05-0303 May 2019 Ltr. 05/03/19 Byron Station, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000454/2019012; 05000455/2019012 (DRS ML19065A2982019-03-0505 March 2019 Ltr. 03/05/19 Byron Station, Units 1 and 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2019003 and 05000455/2019003 (DRS-L.Rodriguez) IR 05000454/20180062019-03-0404 March 2019 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2018006 and 05000455/2018006) ML18354A7012018-12-19019 December 2018 Ltr. 12/19/18 Byron Generating Station, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000454/2019011; 05000455/2019011 (DRS-A.Shaikh) IR 05000454/20180052018-08-28028 August 2018 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2018005 and 05000455/2018005) ML18170A1742018-06-19019 June 2018 Notification of NRC Inspection and Request for Information (DRS-J.Bozga) IR 05000454/20170062018-03-0202 March 2018 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2017006 and 05000455/2017006) IR 05000454/20170052017-08-28028 August 2017 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2017005 and 05000455/2017005) ML17158B1462017-06-0606 June 2017 Information Request to Support Upcoming Problem Identification at and Resolution Inspection at Byron, Units 1 and 2 ML17146A7262017-05-11011 May 2017 Inspection Plan for Byron Station, Units 1 and 2, for Evaluation of Changes, Tests, and Experiments (Triennial Review) Inspection Report 2017009 (Dxs) IR 05000454/20160062017-03-0101 March 2017 Annual Assessment Letter for Byron Station Units 1 and 2 (Report 05000454/2016006 and 05000455/2016006) IR 05000454/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2016005; 05000455/2016005) ML16225A4222016-07-29029 July 2016 Inspection Plan - Byron Station, Units 1 and 2, Triennial Fire Protection Baseline Inspection 2016 007 (Dxs) ML16091A4402016-03-31031 March 2016 Request for Information for Inservice Inspection 2016 002 (Msh) IR 05000454/20150062016-03-0202 March 2016 Annual Assessment Letter for Byron Station, Units 1 and 2 (Inspection Report 05000454/2015006 and 05000455/2015006) IR 05000454/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2015005; 05000455/2015005) IR 05000454/20140012015-03-0404 March 2015 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2014001; 05000455/2014001) ML15029A1672015-01-28028 January 2015 CDBI Request for Information ML14245A0922014-09-0202 September 2014 Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2 IR 05000454/20130012014-03-0404 March 2014 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2013001; 05000455/2013001) ML13246A1982013-09-0303 September 2013 2013 Byron MOC Letter Combined IR 05000454/20120012013-03-0404 March 2013 Annual Assessment Letter - Byron Station, Units 1 and 2, 05000454/2012001 and 05000455/2012001 ML12248A3312012-09-0404 September 2012 Mid-Cycle Assessment Letter for Byron Station Units 1 and 2 ML12179A1962012-06-26026 June 2012 ISI Request for Information- Baseline Inspection IR 05000454/20110072012-03-0505 March 2012 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2011007 and 05000455/2011007) IR 05000454/20110062011-09-0101 September 2011 Mid-Cycle Letter for Byron Station, Units 1 & 2, 05000454/2011-006; 05000455/2011-006 ML11221A1962011-08-0808 August 2011 Notification of NRC Inspection and Request for Information 2024-01-23
[Table view] Category:Letter
MONTHYEARIR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion RS-23-117, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23313A0852023-11-0909 November 2023 Submittal of 2023-301 Byron Initial License Examination Post-Examination Comments RS-23-114, Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2023-11-0101 November 2023 Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection RS-23-100, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 RS-23-093, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel.2023-09-29029 September 2023 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel. ML23251A1622023-09-29029 September 2023 Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements RS-23-094, Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 752023-09-29029 September 2023 Relief Request I4R-24, Alternative for Post-Peening Reexamination Frequency for Reactor Pressure Vessel Head Penetration Nozzle Number 75 RS-23-091, Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals2023-09-26026 September 2023 Relief Request I4R-25, Alternative Requirements for Reactor Pressure Vessel Inservice Inspection Intervals ML23226A0062023-09-19019 September 2023 Review of License Renewal Commitment Number 10 Submittal ML23180A1692023-09-11011 September 2023 Calvert Cliff Units 1 & 2, and R.E. Ginna Plant - Withdrawal of Proposed Alternatives to American Society of Mechanical Engineers (ASME) Requirements (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23242A3282023-09-0101 September 2023 Amendment No. 233 Correction IR 05000454/20235012023-08-31031 August 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000454/2023501 and 05000455/2023501 IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) IR 05000454/20230022023-08-0303 August 2023 Integrated Inspection Report 05000454/2023002 and 05000455/2023002 ML23209A7242023-07-31031 July 2023 Request for Information on the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000454/2024010 and 05000455/2024010 ML23192A0362023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23122A3022023-07-20020 July 2023 Issuance of Amendments Technical Specifications 2.1.1 and 4.2.1 to Allow a Previously Irradiated Accident Tolerant Fuel Lead Test Assembly to Be Further Irradiated in Unit No. 2 IR 05000454/20234022023-07-18018 July 2023 Baseline Security Inspection Document; 05000454/2023402; 05000455/2023402 ML23198A0372023-07-17017 July 2023 Information Request to Support Upcoming Problem Identification and Resolution (PIR) Inspection at Byron Nuclear Plant ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23172A1172023-06-22022 June 2023 Notification of NRC Fire Protection Team Inspection Request for Information RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23159A1302023-06-0808 June 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B1R25) ML23159A1542023-06-0808 June 2023 2022 Regulatory Commitment Change Summary Report RS-23-075, Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process2023-06-0707 June 2023 Application for Technical Specification Improvement to Extend the Completion Time for Condition B of Technical Specification 3.5.1, Accumulators, Using the Consolidated Line Item Improvement Process ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information BYRON 2023-0029, Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements2023-06-0101 June 2023 Response to Request for Additional Information Regarding Steam Generator Tube Inspection Reports to Reflect TSTF-577 Reporting Requirements ML23138A1342023-05-18018 May 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Braidwood Station and Byron Station ML23003A7882023-05-11011 May 2023 Report for December 12-16, 2022, Regulatory Audit Regarding Reinsertion of a High Burnup Accident Tolerant Fuel Lead Test Assembly 2024-02-02
[Table view] |
See also: IR 05000454/2020011
Text
June 10, 2020
Mr. Bryan C. Hanson
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR NRC
TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS
(50.59) BASELINE INSPECTION; INSPECTION REPORT 05000454/2020011;
05000455/2020011
Dear Mr. Hanson:
On August 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a
50.59 Baseline Inspection at the Byron Station. This inspection will be performed
in accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of
the inspection will take place during the week of August 31, 2020.
Experience has shown that these baseline inspections are extremely resource intensive, both
for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the
site and to ensure a productive inspection for both parties, we have enclosed a request for
documents needed for the inspection. These documents have been divided into three groups:
- The first group of information is necessary to ensure that the inspection team is
adequately prepared for the inspection. This information should be made available via
CD (or alternative) and delivered to the regional office no later than July 20, 2020. The
inspection team will review this information and, by August 3, 2020, will request specific
items that should be provided for review in the regional office by August 17, 2020.
- The second group of requested documents contains additional items that the team
will review, or need access to, during the inspection. Certain documents contained
within Group II (i.e., Item (1)), will be requested for review in the regional office prior
to the inspection by August 17, 2020, as identified above. The remaining documents
should be available by the first day of the onsite inspection, August 31, 2020.
- The third group lists information necessary to aid the inspection team in tracking
issues identified as a result of the inspection. It is requested that this information be
provided to the lead inspector as the information is generated during the inspection.
It is important that all of these documents are up to date and complete in order to
minimize the number of additional documents requested during the preparation
and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. John V. Bozga. We understand that our licensing
contact for this inspection is Ms. Zoe Cox of your organization. If there are any questions about
B. Hanson -2-
the inspection or the material requested in the enclosure, please contact the lead inspector at
630-829-9613.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,
/RA/
John V. Bozga, Senior Reactor Inspector
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-454; 50-455
License Nos. NPF-37; NPF-66
Enclosure:
Document Request for 50.59
Inspection cc: Distribution via LISTSERV
B. Hanson -3-
Letter to Bryan C. Hanson from John V. Bozga dated June 10, 2020.
SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR NRC
TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS
(50.59) BASELINE INSPECTION; INSPECTION REPORT 05000454/2020011;
05000455/2020011
DISTRIBUTION:
Jessie Quichocho
Omar Lopez-Santiago
RidsNrrDorlLpl3
RidsNrrPMByron Resource
RidsNrrDroIrib Resource
John Giessner
Kenneth OBrien
Jamnes Cameron
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number: ML20162A096
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
OFFICE RIII
NAME JBozga:mb via
e-mail
DATE 06/10/2020
OFFICIAL RECORD COPY
DOCUMENT REQUEST FOR 50.59 INSPECTION
Inspection Report: 05000454/2020011; 05000455/2020011
Inspection Dates: August 31, 2020-September 4, 2020
Inspection Procedures: 71111.17T, Evaluations of Changes, Tests, and Experiments
Lead Inspector: John V. Bozga
630-829-9613
I. Information Requested for In-Office Preparation Week
The following information is requested by July 20, 2020, or sooner, to facilitate the selection of
specific items that will be reviewed during the onsite inspection week. The inspection team will
select specific items from the information requested below and submit a list to your staff by
August 3, 2020. We will request that certain items be made available to the regional office prior
to the inspection by August 17, 2020. We request that the remaining items selected from the
lists be available and ready for review on the first day of inspection. All requested information
should identify the associated system and cover the time frame from the receipt of information
for the last MOD/50.59 inspection to the present.
The required information identified below should be provided on CD (or alternative). Please
provide three copies of each CD (or alternative) submitted (i.e., one for each inspector). The
preferred file format is a searchable pdf file. The CDs (or alternative) should be indexed
and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding
this information, please call the inspection team leader as soon as possible.
(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed
evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the
facility (modifications), (d) non-routine operating configurations, or (e) departures in
methods of analyses. This list should include 50.59 evaluations for the following:
a. Changes that have been made under the provisions of 10 CFR 50.59 that have
been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59
inspection;
b. Modifications that are field work complete; and
c. Changes to calculations (or initiation of new calculations) that have been issued.
The list should contain the number and title of each document, a brief
description of the change, and the corresponding number and type of the
affected document (i.e., the modification or procedure to which the evaluation
applies). The list should NOT include any evaluations in which prior
U.S. Nuclear Regulatory Commission approval was sought and obtained.
(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full
evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the
facility (modifications); (d) non-routine operating configurations; or (e) departures in
Enclosure
DOCUMENT REQUEST FOR 50.59 INSPECTION
methods of analyses.
The list should contain the number and title of each document, and the
corresponding number and type of the affected document (i.e., the modification or
procedure to which the evaluation applies).
(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis
Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.
(4) A list of calculation changes that have been issued for use.
(5) A list of corrective action documents (open and closed) that address 10 CFR 50.59
issues, concerns, or processes. These documents should also include the corrective
action documents associated with the modification and the 50.59 change
implementation.
The list should contain the number, title and revision (or date) of each document, the
affected system and corresponding documentation (if applicable) and should be sorted
in order of significance.
(6) Copies of procedures addressing the following: modifications, design changes, set
point changes, equivalency evaluations or suitability analyses, commercial grade
dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,
and UFSAR updates.
(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of
the complete submittal.
(8) Copy of the UFSAR change log or a synopsis of the changes. This should
include all of the changes made to the UFSAR that were incorporated in the last
10 CFR 50.71(e)(4) submittal.
(9) Electronic copy of the UFSAR and technical specifications, if available.
(10) Name(s) and phone numbers for the regulatory and technical contacts.
(11) Current management and engineering organizational chart.
II. Information Requested to be Available Prior to Inspection. Requests will be
Made for Specific Item (1) Documents by August 3, 2020, for Availability of
Requested Item (1) Documents in Regional Office by August 17, 2020, and Items
(2), (3) and (4) Documents on First Day of Inspection (August 31, 2020).
(1) Copies of all selected items from Section I. This includes copies of associated
documents such as calculations, modification packages (including description),
10 CFR 50.59 evaluations or screenings, and any corrective action documents.
(2) Copies of these documents do not need to be solely available to the inspection
team as long as the inspectors have easy and unrestrained access to them.
a. Updated Final Safety Analysis Report, if not previously provided;
2
DOCUMENT REQUEST FOR 50.59 INSPECTION
b. Original FSAR Volumes;
c. Original SER and Supplements;
d. Final Safety Analysis Report Question and Answers;
e. Quality Assurance Plan;
f. Technical Specifications, if not previously provided;
g. Latest IPE/PRA Report;
h. Vendor Manuals; and
i. The latest 10 CFR 50.59 UFSAR Update Submittal.
(3) Please ensure that other supporting documents for the selected items have been
located and are readily retrievable as the inspection team will likely be requesting these
documents during the inspection. Examples of supporting documents are:
a. Drawings supporting the modifications;
b. Procedures affected by the modifications; and
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.
(4) Assessment and Corrective Actions:
a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and
b. Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent 50.59 Quality
Assurance audit and/or self-assessment.
III. Information Requested to be Provided throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the
inspection teams questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provide daily during the inspection
to each inspection team member).
If you have any questions regarding the information requested, please contact the
inspection team leader.
3