Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000454/2020011; 05000455/2020011
ML20162A096
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/10/2020
From: John Bozga
NRC/RGN-III/DRS/EB1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2020011
Download: ML20162A096 (6)


See also: IR 05000454/2020011

Text

June 10, 2020

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR NRC

TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS

(50.59) BASELINE INSPECTION; INSPECTION REPORT 05000454/2020011;

05000455/2020011

Dear Mr. Hanson:

On August 31, 2020, the U.S. Nuclear Regulatory Commission (NRC) will begin a

50.59 Baseline Inspection at the Byron Station. This inspection will be performed

in accordance with the NRC baseline Inspection Procedure 71111.17T. The onsite portion of

the inspection will take place during the week of August 31, 2020.

Experience has shown that these baseline inspections are extremely resource intensive, both

for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the

site and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into three groups:

  • The first group of information is necessary to ensure that the inspection team is

adequately prepared for the inspection. This information should be made available via

CD (or alternative) and delivered to the regional office no later than July 20, 2020. The

inspection team will review this information and, by August 3, 2020, will request specific

items that should be provided for review in the regional office by August 17, 2020.

  • The second group of requested documents contains additional items that the team

will review, or need access to, during the inspection. Certain documents contained

within Group II (i.e., Item (1)), will be requested for review in the regional office prior

to the inspection by August 17, 2020, as identified above. The remaining documents

should be available by the first day of the onsite inspection, August 31, 2020.

  • The third group lists information necessary to aid the inspection team in tracking

issues identified as a result of the inspection. It is requested that this information be

provided to the lead inspector as the information is generated during the inspection.

It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation

and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. John V. Bozga. We understand that our licensing

contact for this inspection is Ms. Zoe Cox of your organization. If there are any questions about

B. Hanson -2-

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9613.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

John V. Bozga, Senior Reactor Inspector

Engineering Branch 1

Division of Reactor Safety

Docket Nos. 50-454; 50-455

License Nos. NPF-37; NPF-66

Enclosure:

Document Request for 50.59

Inspection cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from John V. Bozga dated June 10, 2020.

SUBJECT: BYRON STATION, UNITS 1 AND 2INFORMATION REQUEST FOR NRC

TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS

(50.59) BASELINE INSPECTION; INSPECTION REPORT 05000454/2020011;

05000455/2020011

DISTRIBUTION:

Jessie Quichocho

Omar Lopez-Santiago

RidsNrrDorlLpl3

RidsNrrPMByron Resource

RidsNrrDroIrib Resource

John Giessner

Kenneth OBrien

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML20162A096

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JBozga:mb via

e-mail

DATE 06/10/2020

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR 50.59 INSPECTION

Inspection Report: 05000454/2020011; 05000455/2020011

Inspection Dates: August 31, 2020-September 4, 2020

Inspection Procedures: 71111.17T, Evaluations of Changes, Tests, and Experiments

Lead Inspector: John V. Bozga

630-829-9613

I. Information Requested for In-Office Preparation Week

The following information is requested by July 20, 2020, or sooner, to facilitate the selection of

specific items that will be reviewed during the onsite inspection week. The inspection team will

select specific items from the information requested below and submit a list to your staff by

August 3, 2020. We will request that certain items be made available to the regional office prior

to the inspection by August 17, 2020. We request that the remaining items selected from the

lists be available and ready for review on the first day of inspection. All requested information

should identify the associated system and cover the time frame from the receipt of information

for the last MOD/50.59 inspection to the present.

The required information identified below should be provided on CD (or alternative). Please

provide three copies of each CD (or alternative) submitted (i.e., one for each inspector). The

preferred file format is a searchable pdf file. The CDs (or alternative) should be indexed

and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding

this information, please call the inspection team leader as soon as possible.

(1) List of all Title 10 of the Code of Federal Regulations (CFR), Part 50.59 completed

evaluations involving (a) calculations, (b) procedure revisions, (c) changes to the

facility (modifications), (d) non-routine operating configurations, or (e) departures in

methods of analyses. This list should include 50.59 evaluations for the following:

a. Changes that have been made under the provisions of 10 CFR 50.59 that have

been updated in accordance with 10 CFR 50.71(e)(4) since the last MOD/50.59

inspection;

b. Modifications that are field work complete; and

c. Changes to calculations (or initiation of new calculations) that have been issued.

The list should contain the number and title of each document, a brief

description of the change, and the corresponding number and type of the

affected document (i.e., the modification or procedure to which the evaluation

applies). The list should NOT include any evaluations in which prior

U.S. Nuclear Regulatory Commission approval was sought and obtained.

(2) A list of all 10 CFR 50.59 changes that have been screened out as not requiring a full

evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the

facility (modifications); (d) non-routine operating configurations; or (e) departures in

Enclosure

DOCUMENT REQUEST FOR 50.59 INSPECTION

methods of analyses.

The list should contain the number and title of each document, and the

corresponding number and type of the affected document (i.e., the modification or

procedure to which the evaluation applies).

(3) A list of any modifications, procedure revisions, or Updated Final Safety Analysis

Report (UFSAR) changes where it was determined that 10 CFR 50.59 did not apply.

(4) A list of calculation changes that have been issued for use.

(5) A list of corrective action documents (open and closed) that address 10 CFR 50.59

issues, concerns, or processes. These documents should also include the corrective

action documents associated with the modification and the 50.59 change

implementation.

The list should contain the number, title and revision (or date) of each document, the

affected system and corresponding documentation (if applicable) and should be sorted

in order of significance.

(6) Copies of procedures addressing the following: modifications, design changes, set

point changes, equivalency evaluations or suitability analyses, commercial grade

dedications, post-modification testing, 10 CFR 50.59 evaluations and screenings,

and UFSAR updates.

(7) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of

the complete submittal.

(8) Copy of the UFSAR change log or a synopsis of the changes. This should

include all of the changes made to the UFSAR that were incorporated in the last

10 CFR 50.71(e)(4) submittal.

(9) Electronic copy of the UFSAR and technical specifications, if available.

(10) Name(s) and phone numbers for the regulatory and technical contacts.

(11) Current management and engineering organizational chart.

II. Information Requested to be Available Prior to Inspection. Requests will be

Made for Specific Item (1) Documents by August 3, 2020, for Availability of

Requested Item (1) Documents in Regional Office by August 17, 2020, and Items

(2), (3) and (4) Documents on First Day of Inspection (August 31, 2020).

(1) Copies of all selected items from Section I. This includes copies of associated

documents such as calculations, modification packages (including description),

10 CFR 50.59 evaluations or screenings, and any corrective action documents.

(2) Copies of these documents do not need to be solely available to the inspection

team as long as the inspectors have easy and unrestrained access to them.

a. Updated Final Safety Analysis Report, if not previously provided;

2

DOCUMENT REQUEST FOR 50.59 INSPECTION

b. Original FSAR Volumes;

c. Original SER and Supplements;

d. Final Safety Analysis Report Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications, if not previously provided;

g. Latest IPE/PRA Report;

h. Vendor Manuals; and

i. The latest 10 CFR 50.59 UFSAR Update Submittal.

(3) Please ensure that other supporting documents for the selected items have been

located and are readily retrievable as the inspection team will likely be requesting these

documents during the inspection. Examples of supporting documents are:

a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation.

(4) Assessment and Corrective Actions:

a. The most recent 50.59 Quality Assurance audit and/or self-assessment; and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent 50.59 Quality

Assurance audit and/or self-assessment.

III. Information Requested to be Provided throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provide daily during the inspection

to each inspection team member).

If you have any questions regarding the information requested, please contact the

inspection team leader.

3