June 21, 2019 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT BYRON STATION, UNITS 1 AND 2

Dear Mr. Hanson:

This letter is to request information to support our scheduled Problem Identification and Resolution (PI&R) inspection beginning August 5, 2019, at your Byron Station, Units 1 and 2.

This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of condition reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The information requested prior to the inspection may be provided in either CD-ROM/DVD, a web-based document repository, or hard copy format and should be ready for NRC review by July 22, 2019. Mr. Robert Ruiz, the lead inspector, will contact your staff to determine the best method of providing the requested information.

If there are any questions about the material requested or the inspection in general, please contact Mr. Robert Ruiz at 630-829-9732 or Robert.Ruiz@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.

B. Hanson The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Hironori Peterson, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66

Enclosure:

Requested Information to Support PI&R Inspection cc: Distribution via LISTSERV

B. Hanson Letter to Bryan Hanson from Hironori Peterson dated June 21, 2019

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT BYRON STATION, UNITS 1 AND 2 DISTRIBUTION:

Douglas Dodson RidsNrrDorlLpl3 RidsNrrPMByron Resource RidsNrrDirsIrib Resource Darrell Roberts John Giessner Jamnes Cameron Allan Barker DRPIII DRSIII ADAMS Accession Number: ML19172A277 OFFICE RIII RIII NAME RRuiz:bw HPeterson DATE 6/21/2019 6/21/2019 OFFICIAL RECORD COPY

Requested Information to Support Problem Identification and Resolution Inspection Please provide the information on a compact disc (one for each of four team members), if possible. Unless otherwise specified, the time frame for requested information is for the period of September 1, 2017, through the time the data request is answered. Please label any electronic files with file content information. In the case of list of condition reports requested, the list should be sortable electronically.

In addition, inspectors will require computer access to the corrective action program (CAP) database while on site.

PROGRAM DOCUMENTS

1. Copies of current administrative procedures associated with the corrective action program. This should include procedures related to: (1) corrective action process (including procedures on how to perform causal evaluations); (2) operating experience program; (3) self-assessment program; (4) operability determination process; (5) degraded/non-conforming condition process (e.g., IMC 0326); (6) system health process or equivalent equipment reliability improvement programs; and (7) operational decision making (ODMI) process.
2. A current copy of the Employee Concerns Program/Ombudsman administrative procedure(s).
3. Description of any substantive changes made to the CAP since the last Problem Identification and Resolution (PI&R) Inspection (August 2017). Please include the effective date with each listed change.

ASSESSMENTS

4. A copy of Quality Assurance (QA) audits of the corrective action programand if done, audits of the QA programfor the last two years.
5. A copy of self-assessments and associated condition reports generated in preparation for this PI&R inspection.
6. A list of all other QA audits completed in the last two years, with a brief description of areas audited. Please indicate where issues requiring corrective action were identified.
7. The schedule of future QA audits going out to no more than two years.
8. A copy of completed CAP self-assessments for the last two years and the plan/schedule for future CAP self-assessments.
9. A chronological list of department and site self-assessments completed in the last two years (include date completed).

Enclosure

10. A list of condition reports (CRs) written for findings or concerns identified in self-assessments and audits. Include a short description/title of the finding, its status, and include a cross-reference to the audit or self-assessment number.

CORRECTIVE ACTION DOCUMENTS

11. A copy of completed root cause evaluations generated since September 2017 with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the root cause package, to the documents and/or CRs directing and tracking the actions.
12. A list of all other causal evaluations completed since September 2017 with a brief description of the issue. Provide status of any actions developed as part of the evaluations. Include a reference, if not part of the apparent cause package, to the documents and/or CRs directing and tracking the actions.
13. A list of all open CRs sorted by significance level and then initiation date. Include CR number, the date initiated, a brief description/title, system affected if any, significance level, and anticipated completion date, if available.
14. A list of closed CRs since September 2017 sorted by significance level and then initiation date. Include CR number, a brief description/title, the date initiated and closed, assigned organization, system affected, cause codes assigned, and whether there was an associated operability evaluation.
15. A list of open corrective actions, sorted by significance/priority level, with a brief description/title, initiating date and due date. The list should include the number of due date extensions and be grouped by the responsible department.
16. A list of CRs generated by the corporate office September 2017 that involve or affect plant operation, sorted by significance level. Include the date initiated, a brief description/title, site(s) affected, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed).
17. A list of effectiveness reviews completed since September 2017 with a brief description of the results. Include a cross-reference to the CRs for which the effectiveness review was conducted and, if applicable, CR numbers documenting any additional follow-up actions.
18. A list of CRs initiated since September 2017 for inadequate or ineffective corrective actions. Include the date initiated, a brief description/title, significance/priority level, system affected, assigned organization, and status (if closed include date closed; if open, include scheduled date to be closed). Include a cross-reference to the CR or evaluation that generated the original corrective action.
19. A copy of any performance reports or indicators used to track CAP effectiveness.

The end-of-quarter data will suffice; monthly reports are not required.

20. A data table (or similar format) showing the total number of CRs generated per year since 2014 sortable by department (i.e. operations, engineering, security etc.). A data table showing the number of issues identified externally (NRC, INPO, other etc.) per year as compared to internally since 2014.

2

TRENDS

21. A list of CRs initiated since September 2017 for trends. Include the date initiated, a brief description/title, significance/priority level, and status (if closed include date closed; if open, include scheduled date to be closed).
22. Copies of any completed trend reports for CRs. Quarterly trend reports are acceptable; copies of all monthly reports are not required.
23. Copies of all apparent, common and/or root cause evaluations regarding adverse human performance trends.

OPERATING EXPERIENCE

24. A copy of the most recent operating experience program effectiveness review and/or assessment/audit.
25. A list of operating experience documents reviewed (after initial preliminary screening) since September 2017 and any associated CRs. Please provide identification of the originating organization, the initiating organizations document/reference number, your identification number if different than the originators, a brief description/title of the issue, and status of the review and any developed follow-up actions. Indicate the initiation date and the closure date or the anticipated closure date if available.

SYSTEMS AND COMPONENTS

26. A list of the top ten risk significant systems and top ten risk significant components.
27. A list of operability determinations/evaluations that were opened and evaluated since September 1, 2017. Include a brief description/title, date initiated, date closed or date scheduled to be closed. Also include any operability evaluations that were initiated prior to September 2017, that remain open.
28. Cause analysis, corrective actions documents, health reports, and trend analysis for systems and components considered Maintenance Rule (a)(1). Provide this information starting one year earlier from when the system or component entered (a)(1) status.

Include dates when system/components entered (a)(1) status and, if applicable, returned to (a)(2) status. For recurring reports, quarterly reports are sufficient; monthly reports are not required.

29. Copy of the Procedure containing the list of time-critical actions and the procedure that governs them.
30. A list of temporary modifications that were installed since September 2017, with a brief description/title, installation date, and current status. Include any in-place temporary modifications that were installed prior to September 2017.

SCWE

31. Copy of the results of completed safety culture and/or /safety conscious work environment (SCWE) surveys or self-assessments. Include reference to associated CRs and status of the CRs actions. Also include schedule/plans for future surveys.

3

32. Copy/list of SCWE issues identified through alternate avenues, such as the employee concerns programs. In lieu of describing issue in the data package, provide a paper copy to the lead inspector at the start of the inspection.

REGULATORY ISSUES

33. Copies of CRs, investigations/evaluations (ACE/RCE/other), and corrective actions taken for issues identified in NRC findings documented in and since the third quarter of 2017. Identify the status of the associated corrective actions and any effectiveness reviews completed or scheduled as a result. Include a copy of effectiveness reviews that were done. Include a cross-reference to the NRCs inspection report item identification number.
34. A list of CRs for licensee identified violations that have been documented in NRC inspection reports. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
35. A list and status of any corrective actions that are still open associated with greater than green findings/performance indicators.
36. A list of CRs associated with NRC identified issues. Include the CR number, brief description/title, date initiated and the status (if closed include date closed; if open, include scheduled date to be closed).
37. A list of degraded/non-conforming conditions identified since September 2017. Include the CR number, brief description/title, date initiated and date closed or projected closeout date. Include open issues that were identified prior to September 1, 2017.
38. A list of current control room deficiencies and operator work-arounds, sortable by priority, with a brief description/title and corresponding CR and/or work order number.

5-YEAR REVIEW

39. A list of CRs and WOs regarding the safety-related essential service water (SX) system that have been generated since September 1, 2014. Include the CR number, brief description/title, level of evaluation (i.e. root cause, apparent cause, common cause etc.), date initiated, and the status (if closed include date closed; if open, include scheduled date to be closed).

ADMIN

40. A copy of the latest plant organizational chart and phone listing.
41. Scheduled dates, times, and location for all meetings associated with implementing the CAP (e.g. CR screening meetings, corrective action review board meetings). Include work order screening/assessment meetings.

4

Documents Requested to be Available On-Site during the Inspection:

a. Updated Safety Analysis Report.
b. Technical Specifications.
c. Procedures and procedure index.
d. A copy of the QA manual.
e. A list of issues brought to the ECP/ombudsman and the actions taken for resolution.
f. A list of the codes used in the CAP.
g. A copy of the latest independent/offsite organization review of safety culture and or SCWE and internal equivalent assessments if not provided as part of the requested data package.

Other:

On the first day of the inspection, or early on the second day, please provide the inspection team a briefing of your CAP including an overview of your actions, if any, associated with recent industry efforts to improve the efficiency of the CAP (e.g. cumulative effects/delivering nuclear promise initiative(s)/CAP 02, etc.). Include your expectations for personnel using the program and how the work order system fits into the overall scheme for addressing identified issues. Also please demonstrate how to use a station computer to access CAP data.