ML13339A335

From kanterella
Revision as of 19:55, 13 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Licensing Document Transmittal Fermi 2 Technical Requirements Manual - Vol I
ML13339A335
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/21/2013
From:
DTE Energy
To:
Office of Nuclear Reactor Regulation
References
00935, cb1461
Download: ML13339A335 (11)


Text

DETROIT EDISON -FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 11/21/13 PAGE 1 WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 105 1 IR 11/21/13 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.

Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.Ref: cb1461 4oo/

LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL REQUIREMENTS MANUAL -VOL I Revision 105 dated 11/21/13 Immediately, upon receipt of the item(s) below, please insert and/or remove the pages indicated.

Destroy the removed pages. Be sure that Revision 104 has been inserted prior to inserting these pages.SECTION REMOVE and DESTROY INSERT In Front of TRM Manual Immediately following Title Page Title Page Rev 104 03/16/13 List of Effective Pages LEP-1 through LEP-4 Rev 104 03/16/13 Title Page Rev 105 11/21/13 List of Effective Pages LEP-1 through LEP-4 Rev 105 11/21/13 Table of Contents 5.0 Administrative Controls TRM-iii Rev 99 09/10 TRM 5.0-a Rev 99 09/10 TRM 5.0-1 Rev 99 09/10 TRM 5.0-2 thru TRM 5.0-7 Rev 99 09/10 TRM 5.0-8 Rev 99 09/10 TRM-iii Rev 105 11/13 TRM 5.0-a Rev 105 11/13 TRM 5.0-1 Rev 105 11/13 N/A TRM 5.0-2 Rev 105 11/13 END Fermi 2 Technical Requirements Manual Volume I DTE Energy ARMS -INFORMATION DTC: TMTRM [File: 1754 I DSN: TRM VOL I I Rev:105 Date 11/21/2013 Recipient q.6S FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM i Revision 76 TRM 3.3-31 Revision 31 TRM ii Revision 73 TRM 3.3-32 Revision 31 TRM iii Revision 105 TRM 3.3-33 Revision 31 TRM iv Revision 76 TRM 3.3-34 Revision 31 TRM v Revision 79 TRM 3.3-35 Revision 60 TRM vi Revision 31 TRM 3.3-36 Revision 104 TRM 1.0-a Revision 31 TRM 3.3-37 Revision 72 TRM 1.0-1 Revision 31 TRM 3.3-38 Revision 31 TRM 2.0-1 Revision 31 TRM 3.3-39 Revision 31 TRM 3.0-a Revision 31 TRM 3.3-40 Revision 56 TRM 3.0-1 Revision 63 TRM 3.3-41 Revision 56 TRM 3.0-2 Revision 72 TRM 3.3-42 Revision 45 TRM 3.0-3 Revision 54 TRM 3.3-43 Revision 62 TRM 3.0-4 Revision 72 TRM 3.3-44 Revision 72 TRM 3.1-a Revision 31 TRM 3.3-45 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-46 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-47 Revision 31 TRM 3.3-a Revision 31 TRM 3.3-48 Revision 31 TRM 3.3-b Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-c Revision 31 TRM 3.4-a Revision 31 TRM 3.3-d Revision 31 TRM 3.4-1 Revision 36 TRM 3.3-1 Revision 34 TRM 3.4-la Revision 71 TRM 3.3-2 Revision 59 TRM 3.4-lb Revision 71 TRM 3.3-3 Revision 31 TRM 3.4-2 Revision 31 TRM 3.3-4 Revision 31 TRM 3.4-3 Revision 31 TRM 3.3-5 Revision 31 TRM 3.4-4 Revision 31 TRM 3.3-6 Revision 31 TRM 3.4-5 Revision 31 TRM 3.3-7 Revision 31 TRM 3.4-6 Revision 31 TRM 3.3-8 Revision 31 TRM 3.4-7 Revision 31 TRM 3.3-9 Revision 31 TRM 3.4-8 Revision 31 TRM 3.3-10 Revision 31 TRM 3.4-9 Revision 31 TRM 3.3-11 Revision 31 TRM 3.4-10 Revision 31 TRM 3.3-12 Revision 67 TRM 3.5-1 Revision 31 TRM 3.3-13 Revision 74 TRM 3.6-a Revision 70 TRM 3.3-13a Revision 67 TRM 3.6-1 Revision 60 TRM 3.3-14 Revision 67 TRM 3.6-2 Revision 67 TRM 3.3-15 Revision 31 TRM 3.6-3 Revision 31 TRM 3.3-16 Revision 31 TRM 3.6-4 Revision 55 TRM 3.3-17 Revision 31 TRM 3.6-5 Revision 87 TRM 3.3-18 Revision 100 TRM 3.6-6 Revision 33 TRM 3.3-19 Revision 31 TRM 3.6-7 Revision 31 TRM 3.3-20 Revision 31 TRM 3.6-8 Revision 31 TRM 3.3-21 Revision 59 TRM 3.6-9 Revision 85 TRM 3.3-22 Revision 31 TRM 3.6-10 Revision 31 TRM 3.3-23 Revision 31 TRM 3.6-11 Revision 31 TRM 3.3-24 Revision 31 TRM 3.6-12 Revision 31 TRM 3.3-25 Revision 31 TRM 3.6-13 Revision 71 TRM 3.3-26 Revision 31 TRM 3.6-14 Revision 31 TRM 3.3-27 Revision 31 TRM 3.6-15 Revision 31 TRM 3.3-28 Revision 76 TRM 3.6-16 Revision 31 TRM 3.3-29 Revision 76 TRM 3.6-17 Revision 31 TRM 3.3-30 Revision 31 TRM 3.6-18 Revision 31 TRM Vol. I LEP-I REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-19 Revision 31 TRM 3.8-13 Revision 61 TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.8-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 65 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 80 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 88 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TRm 3.6-32 Revision 70 TRM 3.11-a Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1 Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 75 TRM 3.7-a Revision 73 TRM 3.12-2 Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 102 TRM 3.7-2 Revision 70 TRM 3.12-5 Revision 53 TRM 3.7-3 Revision 70 TRM 3.12-6 Revision 53 TRM 3.7-4 Revision 73 TRM 3.12-7 Revision 31 TRM 3.7-5 Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31 TRM 3.7-8 Revision 31 TRM 3.12-11 Revision 49 TRM 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 75 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 72 TRM 3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 75 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 Revision 98 TRM 3.12-18 Revision 75 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 75 TRM 3.7-18 Revision 77 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 Revision 31 TRM 3.7-20 Revision 79 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 75 TRM 3.8-3 Revision 96 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 96 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 78 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 105 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 105 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 105 TRM 3.8-11 Revision 50 TRM 3.8-12 Revision 31 TRM Vol. I LE P- 2 REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B1.0-1 B2.0-1 B3.0-1 B3.0-2 B3.0-2a B3.0-2b B3.0-2c B3.0-3 B3.0-4 B3.0-5 B3.0-6 B3.0-7 B3.1-1 B3.2-1 B3.3. 1-1 B3.3.1-2 B3.3.2-1 B3.3.2-2 B3.3.3-1 B3.3.4-1 B3.3.4-2 B3.3.5-1 B3.3.5-2 B3.3.6-1 B3.3.6-2 B3.3.6-3 B3.3.6-4 B3.3.6-5 B3.3.6-6 B3.3.7-1 B3.3.7-2 B3.3.8-1 B3.3.9-1 B3.3.10-1 B3.3.11-1 B3.3.12-1 B3.3.13-1 B3.3.14-1 B3.4.1-1 B3.4.1-2 B3.4.1-3 B3.4.1-4 B3.4.1-5 B3.4.2-1 B3.4.3-1 B3.4.4-1 B3.4.5-1 B3.4.6-1 B3.4.7-1 B3.5-1 B3.6.1-1 B3.6.2-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Page 31 31 63 63 72 72 72 31 31 54 72 72 31 31 31 31 31 31 67 31 84 31 31 31 31 31 31 76 76 31 31 31 31 56 45 62 31 31 31 71 71 71 71 31 31 31 31 31 31 31 31 67 TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM TRM B3.6.3-1 B3.6.4-1 B3.6.5-1 B3.6.6-1 B3.6.7-1 B3.6.8-1 B3.7.1-1 B3.7.2-1 B3.7.3-1 B3.7.4-1 B3.7.4-2 B3.7.5-1 B3.7.6-1 B3.7.7-1 B3.7.8-1 B3.7.9-1 B3.8.1-1 B3.8.2-1 B3.8.3-1 B3.8.4-1 B3.8.5-1 B3. 8. 6-1 B3.9.1-1 B3.9.2-1 B3.9.3-1 B3.9.4-1 B3.10-1 B3.11.1-1 B3.12.1-1 B3.12.2-1 B3.12.3-1 B3.12.4-1 B3.12.5-1 B3.12.6-1 B3.12.7-1 B3.12.8-1 Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision Revision 87 31 31 70 31 31 31 31 73 31 31 31 31 99 31 79 31 31 96 31 31 43 31 65 31 31 31 31 31 44 31 31 31 31 31 31 TRM Vol. I LEP-3 REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 16, Revision 1 Page Revision Notation Page 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 TRM Vol. I LEP-4 REV 105 11/21/13 FERMI 2 -TECHNICAL REQUIREMENTS MANUAL VOL I Table of Contents (Cont'd)Section and TR 3.9 TR 3.9.1 TR 3.9.2 TR 3.9.3 TR 3.9.4 Title REFUELING OPERATIONS Communications

...................................

Refueling Platform ...............................

Crane Travel -Spent Fuel Storage Pool ...........

Reactor Pressure Vessel Water Level -Refueling

..Page TRM TRM TRM TRM 3.9-1 3.9-2 3.9-4 3.9-5 TR 3.10 TR TR 3.11 3.11.1 TR 3.12 TR TR TR TR TR TR TR TR TR TR 3.12.1 3.12.2 3 .12 .3.12.3 3.12.4 3.12.5 3.12.6 3.12.7 3 .12.8 4.0 5.0 TR 5.1 TR 5.1.1 TR 5.2 TR 5.2.1 SPECIAL OPERATIONS (Blank) ..........................

RADIOACTIVE EFFLUENTS Temporary Outdoor Storage Tank Radioactivity

.....FIRE PROTECTION Fire Detection Instrumentation

...................

Fire Suppression Water System ....................

Spray and Sprinkler Systems ......................

C0 2 Systems .......................................

Halon Systems ....................................

Fire Hose Stations ...............................

Yard Fire Hydrants and Hydrant Hose Houses .......Fire Rated Assemblies

............................

DESIGN FEATURES (Blank) .................................

ADMINISTRATIVE CONTROLS Programs Inservice Inspection and Testing Program for Snubbers Reports Startup Reports .....................................

BASES USE AND APPLICATION Definitions (Blank) .............................

SAFETY LIMITS (SLs) (Blank) ........................

Limiting Condition for Operation (TRLCO)Applicability

......................................

Surveillance Requirement (TRSR) Applicability

......REACTIVITY CONTROL SYSTEMS Control Rod Drive Housing Support ...............

POWER DISTRIBUTION LIMITS (Blank) ..................

TRM 3.10-1 TRM 3.11-1 TRM TRM TRM TRM TRM TRM TRM TRM TRiM TRM TRM 3.12-1 3 .12-8 3.12-13 3.12-16 3.12-18 3.12-20 3.12-26 3.12-29 4.0-1 5.0-1 5.0-2 TR TR TR TR TR TR TR TR B1. 0 B1 .1 B2. 0 B3 .0 B3 .0 B3 .1 B3 .1. 1 B3 .2 TRM B1.0-1 TRM B2.0-1 TRM B3.0-1 TRM B3.0-3 TRM B3. 1-1 TRM B3.2-1 (continued)

TRM VOL I TRM-iii REV 105 11/13 1 SECTION 5.0 DETAILED INDEX OF SECTION Page TR 5.1.1 Inservice Inspection and Testing Program for Snubbers ..........................................

TRM 5.0-1 TR 5.2.1 Startup Reports ...................................

TRM 5.0-2 (Reporting Requirements)

TI~ Vol. I TRM 5.0-a REV. 105 11/13 I TRM Vol. I TRM 5. 0-a REV. 105 11/13 1 Programs TR 5.1 TR 5.0 ADMINISTRATIVE CONTROLS TR 5.1 Programs TR 5.1.1 Inservice Inspection and Testing Program for Snubbers The Snubber Program specified in ISI-NDE Program, Part C implements the requirements of the ASME OM Code, Subsection ISTA and ISTD, 2004 Edition, as allowed by 10CFR50.55a(b)(3)(v) in lieu of ASME Section XI, IWF-5200(a) and (b) and IWF-5300(a) and (b), which applies to preservice and inservice examination and testing requirements for snubbers.TRN Vol. I TRI'I 5.0-1 REV 105 11/13 TRM Vol. I TRM 5. 0-1 REV 105 11/13 1 Reports TR 5.2 TR 5.0 ADMINISTRATIVE CONTROLS TR 5.2 Reports In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the Regional Administrator of the Regional Office of the NRC unless otherwise noted.TR 5.2.1 Startup Report a. A summary report of plant startup and power escalation testing shall be submitted following:

1. Receipt of an Operating License;2. Amendment to the license involving a planned increase in power level;3. Installation of fuel that has a different design or has been manufactured by a different fuel supplier; and 4. Modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the unit.b. The startup report shall address each of the tests identified in Subsection 14.1.4.8 of the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.

Any corrective actions that were required to obtain satisfactory operation shall also be described.

Any additional specific details required in license conditions based on other commitments shall be included in this report.c. Startup reports shall be submitted within: 1. 90 days following completion of the startup test program;2. 90 days following resumption or commencement of commercial power operation; or 3. 9 months following initial criticality, whichever is earliest.If the startup report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 months until all three events have been completed.

TRM Vol. I TRM 5.0-2 REV 105 11/13 I TRM Vol. I TRM 5. 0-2 REV 105 11/13 1