ML14262A252

From kanterella
Revision as of 09:20, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Initial Operator Licensing Operating Test Approval (Millstone Power Station, Unit 2)
ML14262A252
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/17/2014
From: Jackson D E
Operations Branch I
To: Heacock D A
Dominion Resources
Jackson D E
Shared Package
ML14043A009 List:
References
Download: ML14262A252 (4)


Text

D. Heacock UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL (MILLSTONE POWER STATION UNIT 2)

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Millstone Power Station Unit 2. Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. John Palmer, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1 on September 17, 2014. The NRC staff will administer the operating tests during the week of September 29, 2014. This examination has und ergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (partial or complete operating test) specified for each applicant.

Sincerely,

/RA/ Donald E. Jackson, Chief

Operations Branch

Division of Reactor Safety September 17, 2014 D. Heacock 2

Docket No. 50-336 License No. DPR-65

cc: Distribution via ListServ

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT:

INITIAL OPERATOR LICENSING OPERATING TEST APPROVAL (MILLSTONE POWER STATION UNIT 2)

Dear Mr. Heacock:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations for the operating test at the Millstone Power Station Unit 2. Please note that written examination approval will be communicated under separate correspondence.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. John Palmer, Manager - Nuclear Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC approved the subject operating test in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1 on September 17, 2014. The NRC staff will administer the operating tests during the week of September 29, 2014. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5306.

Please contact your Chief Examiner, Mr. Peter Presby at (610) 337-5392, if you have any questions or identify any errors or changes in the license level Reactor Operator (RO) or Senior Reactor Operator (SRO) or type of examination (

partial or complete operating test) specified for each applicant.

Sincerely,

/RA/ Donald E. Jackson, Chief

Operations Branch

Division of Reactor Safety Distribution: See next page. DOCUMENT NAME: G:\DRS\Operations Branch\Presby\Exam FY15-MS2 Oct 14 (U01891)\ExamApproval-O-Ltr.docx ADAMS PKG: ML14043A009 ADAMS ACCESSION NO.: ML14262A252 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME PPresby/DEJ for CBixler/CB DJackson/DEJ DATE 09/17/2014 09/16/2014 09/17/2014 OFFICIAL RECORD COPY

D. Heacock 3 Distribution: W. Dean, RA (R1ORAMAIL RESOURCE) D. Lew, DRA (R1ORAMAIL RESOURCE) H. Nieh, DRP (R1DRPMAIL RESOURCE M. Scott, DRP (R1DRPMAIL RESOURCE J. Trapp, DRS (R1DRSMAIL RESOURCE)

B. Welling, DRS (R1DRSMAIL RESOURCE)

R. McKinley, DRP S. Shaffer, DRP J. DeBoer, DRP J. Ambrosini, DRP, SRI B. Haagensen, DRP, RI L. McKown, DRP, RI J. Jandovitz, RI OEDO RidsNrrPMMillstone Resource

RidsNrrDorlLpl1-1 Resource ROPreports Resource D. Jackson, DRS P. Presby, Chief Examiner, DRS Distribution: DRS Master Exam File (C. Bixler) (w/concurrences)