ML17053A858

From kanterella
Revision as of 23:25, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Addendum I to Test Rept of Limitorque Valve Actuator in Nuclear Reactor Containment Environ,Prepared by Philadelpha Gear Corp.Forwarding Ltr Encl
ML17053A858
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/29/1969
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17053A854 List:
References
NUDOCS 7907300181
Download: ML17053A858 (8)


Text

PHILADELPHIA GEARCORPORATION KINGOF,PRUSSIA,PENNA.19406LIMITORQUE VALVECONTROL'ADDENDUM NUMBERNITESTOFLIMITORQUE VALVE,OPERATORTOMEETGENERALREQUIREMENTS OFAN,ELECTRICVALVEACTUATORINNUCLEARREACTORCONTAINMENT ENVIRONMENT REPORTOFJANUARY2,1969A.SHOCKScVIBRATION TESTB.TESTOFLIMITSWITCHNITHMATERIALCHANGEAPRIL29,1969<<>goi$(

/kA

~~I~~aE~(o-\TESTREPORT-.APRIL29,1969A.SHOCKANDVIBRATION TEST=Y',TheL'imitorque OperatorsizeSMB-0witha15footpound,3phase,60cycle,440voltmotor,nameplate order5338164wasshippedtoLockheedElectronics Companyenvironmental labratory andtestedonMarch10,1969.TestProcedure The.testspecimenwassecuredtoavibration machineandsubjected to-fivecyclesofvibration inboththeverticalaxisandthehorizontal axis.Eachcycleconsisted oftwominutesofvibration atafrequency ofthirty-five (35)cpsandanacceleration levelofthree(3)"G's",followedbyoneminuteofnovibration.

Vibration scanswerealsoconducted inbothaxisofvibration betweenfivetothirty-five cpstodetermine thepresenceofany'Iresonances.

Visualinspections forevidenceofanyexternalphysicaldamagewereconducted throughout thevibration testing.Thevibration testwascompleted withnovisualevidenceofanyexternalphysi-caldamage.Noresonances weredetecteddu'ringthevibration scans.<'rr.TheaboveisincludedinLockheedElectronics CompanyTestReport02268-4618.

40

~)PageApril29,1969Thepreviousshockandvibration testofaLimitorque Operatorwasextendedto'16and25cps.Theabovetestextendedthelevelto3G'sat35cps.B.'ESTOFGEAREDLIMITSNITCHNITHMATERIALCHANGE:On,theprevioustestofaLimitorque Operatorassubmitted January2,1969,afailureoccurredduetotheactionofthechemicalsprayonthematerialofthegearframeofthegearedlimit,switch.Thi,scausedthepremature, failureofthegearedlimitswitch.Thegearframematerialhasbeenchangedasprev-iouslyrecommended andanadditional testofthisrevisedgearedlimitswitchha'sbeenconducted atTheFranklinInstitute ResearchLabratories inPhiladelphia, Pennsylvania onApril9throughApril16,1969.Thegearedlimitswitchwasplacedinthesameenvironmental chamberastheprevioustestandwasusedinconjunction withstartingandstoppinganelectricmotoralsointhetestchamber.Theenvironment consisted ofasevendaytestwhereinthegearedlimitswitchwasexposedtohighsteampres'sure, temperature andchemicalenvironment similartotheprevioustest.Thenewgearedlimitswitchsuccessfully completed thetestwithnosignofwearordeterioration duetothesteampressure, 0'

Page3'pril29,1969temperature orchemicalenvironment.

Thetestwascompletely satisfactory ineveryrespect.CONCLUSION:

ThematerialchangeofthegearedlimitswitchhasbeennotedandwillbeincludedonallLimitorque Operators subjected tothisenvironmental condition whenspecified.

~Thisinformation issubmitted asanaddendumtoourTestReportdatedJanuary2,l969.Verytrulyyous,EdwardF.LawsonSalesManagerLimitorque DivisionEFL/s1s