Rept of Test on Philadelphia Gear Corp SMBO-15 Limitorque. Prepared by Lockheed Electronics CoML17053A855 |
Person / Time |
---|
Site: |
Nine Mile Point ![Constellation icon.png](/w/images/b/be/Constellation_icon.png) |
---|
Issue date: |
07/31/1968 |
---|
From: |
FRANKLIN INSTITUTE |
---|
To: |
|
---|
Shared Package |
---|
ML17053A854 |
List: |
---|
References |
---|
2120-4594, NUDOCS 7907300166 |
Download: ML17053A855 (12) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17059C7911999-09-30030 September 1999 Proposed Tech Specs Re Rev B to Conversion of Unit 2 Current TS to ITS ML20211P5931999-09-10010 September 1999 Marked-up Tech Specs Pages Reflecting Conforming Administrative License Amend Associated with Proposed Transfer of Facilities to Amergen Energy Co,Llc ML20211H2231999-08-26026 August 1999 Proposed Tech Specs,Supporting Implementation of Noble Metal Chemical by Raising Reactor Water Conductivity Limit in TSs 3.2.3.a,3.2.3.c.1 & 3.2.3.b ML18041A0731999-07-27027 July 1999 Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2. ML20206P2661998-12-30030 December 1998 Proposed Tech Specs Making Application of Emergency Condenser Vent Ng Activity Monitor Channel Operability Requirement & Daily Sensor Check SR Consistent with Conditions Stated in LCO 3.1.3.a Re Emergency Cooling Sys ML20197K1041998-12-0404 December 1998 Revised Proposed TS Bases Reflecting Previous Removal of Condenser Low Vacuum Scram Function from TS as Well as Plant Design & Changes to EDG Ratings,Design Basis Load Limits & Loading Profiles ML20196H0671998-11-30030 November 1998 Proposed Tech Specs,Correcting LCO & Associated Bases for TS Section 3.1.2, Liquid Poison Sys, That Had Been Incorporated Into TS as Part of NMP Unit 1 TS Amend 101 ML20196D2081998-11-24024 November 1998 Proposed Tech Specs B 2.1.1, Fuel Cladding - Safety Limit, B 3.2.5 & 4.2.5, Reactor Coolant Sys Leakage Rate ML20154R1101998-10-16016 October 1998 Proposed Ts,Revising LCO 3.7.1.1 & Associated Actions & SRs to Provide Assurance That Four SW Pumps Are Operable & Are Operating within Acceptable Sys Parameters,With Divisional Cross Connect Valves Open ML20217N7911998-04-24024 April 1998 Revised Pages 2-1,3/4 4-1 & B2-1 to Replace Previously Submitted Pages Contained within Attachment a of 971215 Proposed Change to TS to License NPF-49 ML20202G3751998-02-0505 February 1998 Proposed Tech Specs Pages,Reflecting References to 10CFR50.55a(f) & (G) as Well as Terminology Used in Second Ten Year Isi/Ist,Beginning on 980405 ML20197H3371997-12-15015 December 1997 Proposed Tech Specs Revising SLMCPR from 1.07 to 1.09 for Two Recirculation Loop Operation & from 1.08 to 1.10 for Single Loop Operation ML20211M5231997-10-0707 October 1997 Proposed Tech Specs Section 4.9.6,reflecting New Setpoints Due to Difference in Weights of Two Existing Triangular Refueling Platform Masts ML20217G9011997-07-31031 July 1997 Proposed Tech Specs Changing Wording in Action 36 of TS Table 3.3.3-1, Emergency Core Cooling Sys Actuation Instrumentation ML20148A7751997-04-30030 April 1997 Proposed Change to Tech Specs,Removing Section 3.3.7.3 & Associated Surveillance Section 4.3.7.3,associated Tables 3.3.7.3-1 & 4.3.7.3-1,Bases Section 3.4.3.7.3 & Revising Section 0.0 (Index) Pages VII & Xvii ML17059B2911996-09-0404 September 1996 NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. ML20116D8121996-07-26026 July 1996 Proposed Tech Specs Re Option B of App J to 10CFR50 ML20115H1521996-07-12012 July 1996 Proposed Tech Specs Section 6.2.2.i Re App a ML20117F9501996-05-15015 May 1996 Proposed Tech Specs Section 3/4.3.2 Re Isolation Actuation Instrumentation ML20101F4281996-03-20020 March 1996 Proposed TS 3/4.3.1 Re RPS Instrumentation,Deleting Operability Requirements for APRM Neutron flux-upscale, Setdown & Inoperative Functions in Operational Conditions (Oc) 3 & 4 & Modifying Operability Requirements in Oc 5 ML20101D7551996-03-15015 March 1996 Proposed Tech Specs Section 4.6.2 Re Depressurization Sys - Suppression Pool ML20097D2391996-02-0707 February 1996 Proposed Tech Specs Re Administrative Controls ML20100C1021996-01-25025 January 1996 Proposed Tech Specs Table 3.3.3-1 Re Emergency Core Cooling Sys Actuation Instrumentation ML20096G8401996-01-17017 January 1996 Proposed Tech Specs,Representing Revs to Specs 3/4.3.1, 3/4.3.2,3/4.3.3,3/4.3.4.2 & Associated Bases to Relocate Response Time Limit Tables from TSs to Plant USAR ML20094B5421995-10-25025 October 1995 Proposed Tech Specs Re Position Title Changes & Reassignments of Responsibilities at Upper Mgt Level ML20091Q9571995-08-28028 August 1995 Proposed TS 3.6.1.7,increasing Time 12-inch & 14-inch Containment Purge Sys Supply & Exhaust Valves May Be Open in Operational Condition 1,2 & 3 from 90 H Per 365 Days to 135 H Per 365 Days & Deleting Expired Footnotes for Clarity ML20081E2491995-03-0909 March 1995 Proposed Tech Specs,Revising SR 4.6.1.2.a,allowing Second Primary Containment ILRT (Type a) to Be Performed at Refueling Outage 5 or 72 Months After First Type a Test ML17059B0221995-02-15015 February 1995 Rev 0 to UT-NMP-311V0, Procedure for Manual Ultrasonic Exam of Nozzles Inner Radius & Bore. ML17059B0211995-02-10010 February 1995 Rev 0 to UT-NMP-309V0, Procedure for Manual Ultrasonic Exam of Planar Flaw Sizing for Nozzle Inner Radius & Bore Regions. ML17059B0201995-02-10010 February 1995 Rev 0 to UT-NMP-703V0, Procedure for Geris 2000 Ultrasonic Exam of RPV Nozzle Inner Radius & Bore Regions. ML17059A8881995-01-18018 January 1995 Rev 0 to Field Disposition Instruction 0245-90800, Shroud. ML20077N1591995-01-0606 January 1995 Proposed Tech Specs Re Min Gallons of Fuel Oil Required in Day Tanks & Storage Tanks ML20077N2071995-01-0606 January 1995 Proposed Tech Specs Re Deletion of Certain Instruments Not Classified as Category 1 ML20078Q9241994-12-13013 December 1994 Proposed Tech Specs Re Change to Table 3.6.1.2-1 That Will Allow Maximum Leakage of 24.0 Scfh for Each of Eight MSIVs ML20077E1561994-12-0202 December 1994 Proposed TS Page 3/4 1-20,reflecting Rev of SLCS Relief Valve Setpoint to Show Influence of Back Pressure & Rev of Bases Page B3/4 5-2 to Show That Hpsc Sys Designed to Supply 517 Gpm Flow Rate at 1,200 (Instead of 1,175) Psid ML20078J3781994-11-14014 November 1994 Proposed Tech Specs Reducing Leak Rate Test Pressure for Safety Related ADS Nitrogen Receiving Tanks from 385 Psig to 365 Psig ML17059A5661994-11-0909 November 1994 Rev 2 to Emergency Plan Maint Procedure EPMP-EPP-08, Maint, Testing & Operation of Oswego County Prompt Notification Sys. ML20078E0331994-10-28028 October 1994 Proposed Tech Specs 1.0, Definitions, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.9.3, Control Rod Position ML20078B9841994-10-21021 October 1994 Proposed Tech Specs SR 4.8.1.1.2.e.8,reflecting Addition of Footnote Re 24 H Functional Test of DGs ML20073L8781994-10-0505 October 1994 Proposed TS Table 3.3.7.1-1 Re Radiation Monitoring Instrumentation ML20072U3491994-09-0202 September 1994 Proposed Tech Specs Re 18 Month Operability Test of Svc Water Pumps Sys & Resistance Test of Intake Deicing Heater Sys ML17059A4471994-09-0101 September 1994 Proposed Tech Specs Section 3.2.2, Minimum Reactor Vessel Temperature for Pressurization, & Associated Bases ML20072P6211994-08-26026 August 1994 Proposed TS 3/4.6.1.3, Primary Containment Air Locks, Allowing Continued Plant Operation If Interlock Becomes Inoperable as Long as Operable Door Locked Shut & Periodically Checked as Being Locked Shut ML17059A4241994-07-0606 July 1994 Rev 14 to Nine Mile Point Nuclear Station Unit 1 Odcm. ML20071G2771994-07-0101 July 1994 Proposed Tech Specs Surveillance Requirements 4.6.5.1.c.1 & 4.6.5.1.c.2 ML20029D4001994-04-27027 April 1994 Proposed Tech Specs Re Drawdown Time Testing & Inleakage Testing for Secondary Containment Integrity ML18040A2941993-12-17017 December 1993 Rev 13 to Nine Mile Point Nuclear Station Unit 1 Odcm. ML20058N3491993-12-14014 December 1993 Proposed Tech Specs 3/4.8.2, DC Sources, 3/4.8.4, Electrical Equipment Protective Devices & Bases for 3/4.6.3, Primary Containment Isolation Valves ML17059A0971993-10-25025 October 1993 Rev 4 to NMP2-IST-001,NMP,Nine Mile Point Nuclear Station, Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan. ML20056G9391993-09-0202 September 1993 Proposed Tech Specs Section 3/4.1.3.5, CR Scram Accumulators 1999-09-30
[Table view] Category:TEST REPORT
MONTHYEARML18040A2801993-04-0404 April 1993 Rcb Integrated Leakage Rate Test Final Rept, for NMPNS, Unit 1.W/930702 Ltr ML18038A3461991-03-28028 March 1991 NMP Nine Mile Point,Unit 2 First Refueling Outgage Reactor Containment Bldg Integrated Leak Rate Test. W/910402 Ltr ML17056A2741989-09-30030 September 1989 1,Restart Readiness Rept. ML20245H9471989-02-28028 February 1989 Rev 1 to Power Ascension Test Program,Final Startup Rept ML20245H9421989-02-15015 February 1989 Supplemental Final Startup Rept ML20112E3021985-03-0505 March 1985 Equipment Dynamic Qualification:12 Inch,150-lb Motor-Operated Gate Valve ML17053A8531969-01-0202 January 1969 Rept Re Limitorque Valve Operator Test for Meeting General Requirements of Electrical Valve Actuator in Nuclear Reactor Containment Environ.Prepared by Philadelphia Gear Corp ML17053A8551968-07-31031 July 1968 Rept of Test on Philadelphia Gear Corp SMBO-15 Limitorque. Prepared by Lockheed Electronics Co 1993-04-04
[Table view] |
Text
.4 '. "".;. ",,: '.: < '".".;".:-:::-" ';,,"- Test Report No. 2120-0590 C
I l;" ':::. ~ ~
'.-"'KPV~T'j Y~SY ~ ~
I C
~
C
."- GA
~ e PHXLADELPHXA GEAR CORPORATION I '=:-..'-".:;: .'" ~ ~
SMBO-15 LEIIXTORQUE I
~,
~ 1' Report Vfriter: ~
Soltis
~
F. C
- Te st, Engine er;
/4i'!'~
I r.l ~~<./~
I
,. V. A. Black .
~~
~
. I
' ~
e
~ C
~: .G~"-K<=3'-""-' KE.~CY~iQ '.3~6. CG '3PA~3'V
~ '-." LIILlTAAY 5YQTEMS DIVISION ~" PLAINI'I LDe NQYf JKAGQY ~
C i'
':" July
~
~ "'... '- '."': '" ' ~, ' '
31, 1968
' l
~ ~ ~
~
Approved by:
C' N. Johnson, Sup rvisor
~ Environmental. mboratory C
CC
- i. f =".(c=.-
~ ~
\ ~
,~~
IC
~'
~ ~
LEG 197P
~ \
C
) ~
( 5 ~
t~'4 c ~
C ~
~ ~ r
~
~
l.
I
L: 'o- ...~ ", '. ~ '-. '::, ":.: i'.;.".,,'.'..', ': ..."-'i'..).: Tes t Report No ~
2120- 559 PURPOSE-OF TEST: '.. ':. '.. 'o 'subject the test specimen to the
';: .. Vibration Test r'eferenced in. Philad.elphla
.'..'Gear Corporation Purchase Order No. 600198.
-' " .:.'..':.;, '.Philadelphia Gear Corporation KQfUFACTURER: I
- l,'..=.:.:; .:::,.;: King of Prussia, Pa.
I
. SPECIiIENS TESTD: -'.': SIIBO-15 Limigorque (Reliance Motor S/N 435571-MS)
J APPLICABLE DOCUiIENTS: Philadelphia Gear Corporation CASE 'UMBER:,
QUANTITY OF
~ ~ J
)
~ ~
- ..
- Purchase Order No. 600198
'" 24-8001-0594
~ r SPECIiIENS TESTED ' One (1,) .
) ) ~
~ ~
SECURITY CLASSIFICATlON OF SPECIMEifS TESTED: 'nclassif led.
DgTE TEST COMPLETED: . 7/30/68 TEST CONDUCTED BY: . LOCKHEED ELECTRONICS COiIPANY ZNVIRONiIENTAZ LABORATORY ISPOSITION OF SPECIMENS TESTED: ...Returned. t'o.'ranklin Institute, Applied Mechanics Laboratory pe r the rea ue s t of
".'..."Philadelphia Gear Corooraiion per Lockheed Electronics Company Packing Silo No. 41775
.':::;"..':.::-".-::., dated. 7/31/68.
a )
" :.-...':Reaction-Type Vibration Machine, TEST APPARATUS: .
LAB Company i!odel RVH-72-5000, S/N 51401
~
) )
Vibration Meter, MB Company
'odel M-6, S/N 539
~ ~
1
~4
~
J
- , ,.:;Vibration Pickups, MB Company Type 120,
.',', 'S/N 14187 (vertical) .and S/N 11263
".. (horizontal)
~
' ~
J TEST PROCEDURE: ..":The test soecimen was secured to the vibration machine, as sho>>n in Figures 1
- .'and. 2, and sub] cted. to five (5) cycles of
.." vibration in 'ooth the vertical axis and
.:'-..:the horizontal axis rrith the mounting flange
.:.. -',"-in the horizontal plane.
V
)
o
~ ~ ~
J
- q Form LEC 197F
~ ~ ~
~
~ '
Pape 1 o" . P-
~
C i
~
.;.-. -'::;"::."::-:- -.:-. '.-'.':'-'-:.'"'-'-:-."'.",: Test Report No. ~12O-~59~
.,':-..',: '. .':. Each: cycle consisted of two (2) minutes TEST PROCEDURE:
(Cont'd.) ....:
=.;:
'..""'::.'".'.";"-: ':.of. vibration at a freauency of twenty (20}
.:.;:.:,.'.":,-.-::.cps. and. a acceleration level of 'one (1}
followed, by. one (1.) m1nute of no vibration.
.'.Visual inspections for evidence of any
-.-;-.::..'::":external 'physical damage were conducted.
'::.'":;.:: throughout v bration testing.
TEST RESULTS::
' ".'.":The Vibration Test was completed with no
- .'visible evidence of any external physical
'" f ~
RECOtPilEÃ3ATIONS:
4
~ ~ ~
..". None.'.
i Data merely submitted..
e, I, i r :- .:.:..":,:::::, ": -:.:..'-::::::.: ~
'r
'.. Test Engineer: F>~ -' ~~/~
A. Black i
rt p
4 i
~ ' 'L ' ~
~~ i
~ i ~
i
. Form LEC 197F. ~ ~
Pa~e 2 o"
~~
~ g
~ r
~ I~ r ~
~
~ ~
~ .
'v~
s rv t~ )
vt ~ + t ~ 'IO 1 r'
l ~
lr \
~ r4 1
', ~
A '
~ ~ ~
~
'f v$
~
~" .'. L
=- ~
r~
1
~, ~ r" ~
If vf
~ ~
I I~
rI I
~~ ~
a ~
~ ~
'I
, I I. ~
$'I
~ f,f I QQ +I~I, I
~ -.]i 4 Iy~ ~
~ I
,~ ~ J
~:.
r
...) ~ ~ -s ~ '
J'
~
Y
'4P
~ ~, J 1g \ ~ ~ I ~ r: .~ ~
~ I
) J'r"
'..pl~.
~ - ~
r
~ ~
."y:,;.": '"
4 ~ '. ' . r '
f ~
~ ~
g
'4 ~
~
'1~~
~
~ ~
r,'
~ ~
~ ~ I V
I
)~
I
~ ~
~
l A
~ ~
. ~ ~ ~
~ ~ ~
~
~r/
~ ~
~ r . ~
~ ~
~ g t
~ ~ a~
~
~ ~ ~ 1 e.
r op
< rtar
~ 1:'.:>>
I i'...
. ~
At~