ML17251A135

From kanterella
Revision as of 14:43, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Corrected Tech Spec 1.4, Operable-Operability, Adding Word Supports After Word Lubrication & Explanation of Addl Issues Re Monitoring & Documentation,Per Util 870724 Application for Amend to License DPR-18
ML17251A135
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/21/1988
From: SNOW B A
ROCHESTER GAS & ELECTRIC CORP.
To: STAHLE C
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17251A136 List:
References
NUDOCS 8806300083
Download: ML17251A135 (3)


Text

,ACCELERATED DFRIBUTION DEMONSTRATION SYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:8806300083 DOC.DATE:

88/06/21NOTARIZED:

NODOCKETFACIL:50-244 RobertEmmet,GinnaNuclearPlant,Unit1,Rochester G05000244'UTH.NAMEAUTHORAFFILIATION SNOW,B.A.

Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)

SUBJECT:

RequeststhatTechSpec1.4beamendedtoincludeword"supports" afterword"lubrication."

DISTRIBUTION CODE:AOOIDCOPIESRECEIVED:LTR (ENCL~SIZE:3+2TITLE:ORSubmittal:

GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).

05000244RECIPIENT IDCODE/NAME PD1-3LASTAHLE,CINTERNAL:

ARM/DAF/LFMB NRR/DEST/CEB 8HNRR/DEST/MTB 9HNRR/DOEA/TSB 11STRACTREGF01EXTERNAL:

LPDRNSICCOPIESLTTRENCL10111011111111111111RECIPIENT IDCODE/NAME PD1-3PDNRR/DEST/ADS 7ENRR/DEST/ESB 8DNRR/DEST/RSB 8ENRR/PMAS/ILRB12 OGC15-B-18RES/DE/EIB NRCPDRCOPIESLTTRENCL55111111111011118ADD8D:,"AD9~TOTALNUMBEROFCOPIESREQUIRED:

LTTR22ENCL19It e

ISIIIFIIIIZIEifAIVOiIIIIIIIIIIII IIIIIIIIIIII ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649-0001 June21,1988TELEPHONE AREACODE716546-2700U.S.NuclearRegulatory Commission DocumentControlDeskAttn:Mr.CarlStahlePWRProjectDirectorate No.1Washington, D.C.20555

Subject:

Technical Specification TestingRequirements forSnubbersR.E.GinnaNuclearPowerPlantDocketNo.50-244

DearMr.Stahle:

AsaresultofaJune7,1988teleconbetweenRG&EandNRCpersonnel, RG&EwishestoclarifyoneaspectofthesubjectTechnical Specification Changerequest,assubmitted byletterdated.July24,1987.Operability ofcertainsnubbersundercoldshutdownconditions isrequired, astheresultofthepresentsystemoperability requirements ofTechnical Specification 3.1.1.1.e.

Toensureclarity,werequestthatTechnical Specification 1.4beamendedtoincludetheword"supports" aftertheword"lubrication",

asshowninAttachment 1andthatthispagebecomeapartofourApplication submitted onJuly24,1987.InAttachment 2,RG&Eisproviding anexplanation oftwoadditional issues:steamgenerator snubbersealservicelifemonitoring, maintenance anddocumentation; andmechanical snubberdegradation monitoring andpreventive maintenance.

Theseexplanations providethereasonsfordifferences betweentheGinnaStationsnubberTechnical Specifications andthe"Standard Technical Specifications".

Attachments Verytrulyyours,d~BruceA.SnowSuperintendent NuclearProduction goeI8806300083 88062iPDRADOCK05000244PDCD