ML17258B150

From kanterella
Revision as of 13:34, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Notifies That Intent of Interim Actions Specified in Encl 2 to NRC 801222 Ltr Re Control of Heavy Loads Have Been Implemented.Addl Three Months,Until 810922,requested in Order to Respond to Section 2.1 Re Deviations
ML17258B150
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/22/1981
From: MAIER J E
ROCHESTER GAS & ELECTRIC CORP.
To: CRUTCHFIELD D
Office of Nuclear Reactor Regulation
References
NUDOCS 8106300406
Download: ML17258B150 (6)


Text

REGULATORY ORMATIONDISTRIBUTION SYSOM(RIBS)ACCESSION NBR:8106300006 DOC~DATE:81/06/22NOTARIZED:.

YESDOCKETtlFACIL'50-244 RobertEmmet'inna NuclearPlant~Unit1PRochester>>

G05000244AUTH,NAMEi AUTHORAFFILIATION MAIER<J,E~Rochester Gas8ElectricCorp.RECIP~NAME',RECIPIENT AFFIIIATIONCRUTCHFIELD<D, Operating ReactorsBranch5

SUBJECT:

Notifiesthatintentofinterim'ctions" specified inEncl2'oNRC"'01222 ltrrecontrolofheavyloadshavebeen:implemented.Addi threemonths~until 810922irequestedI inordertorespondtoSection2'.1redeviations..

DISTRIBUTION CODE;:A033SCOPIESRECEIVED:LTR

'NCLgSIZE:TITLE':ConrtolofHeavyLoadsNearSpent:Fue'I(USIA-36)Operat7ng ReactorNOTES:1copy:SEPSectsLdr,05000240RECIPIENT IDCODE/NAMEY ACTION:ORB05BCCOPIESLTTRENCLRECIPIENTIDCODE'/NAME CLEMENSONtF

~00COPIESLTTRENCLINTERNAL:

A/DCORE'CS11~NRC:PDR02RADASSESSBR10.REQUAPGB'9 1=.111IEEREG.F07BR12'1EXTERNAL:

ACRSNSIC13-061611LPDR03JUL0S198l)y0TOTALNUMBEROFCOPIESREQUIRED:

LTTRPfENCLPf PfII~~~IIt1CIUkgeJ~III fIIIIIIIIIIIIII IIIIIIIII

~'IIIIIIIIIIII i!IIIIIIIII

~!~raid(/E~

IIIIIIIIIIIII

~;-...(ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.14649JOHNE.MAIERVICEPRESIDENT TELEpHONCAREACODETIE546.2700June22,1981DirectorofNuclearReactorRegulation Attention:

Mr.DennisM.Crutchfield, ChiefOperating ReactorsBranchNo.5DivisionofLicensing U.S.NuclearRegulatory Commission Washington, DC20555JUN291981~)2gDIIIIIIISSPS yENIICLEAII QEQIILh

Subject:

ControlofHeavyLoadsR.E.GinnaNuclearPowerPlantDocketNo.50-244

DearMr.Crutchfield:

ThisletterisinresponsetoaletterdatedDecember22,1980fromDarrellEisenhut, USNRC,regarding controlofheavyloads.Sincereceiptoftheletter,theintentofinterimactionsspecified inEnclosure 2toMr.Eisenhut's letterhavebeenimplemented.

Thesehaveincludeddefinition ofsafeloadpaths,plantprocedure development andimplementation, craneoperatortrainingandqualification, andcraneinspection testingandmaintenance.

Inaddition, specialattention, asdefinedinEnclosure 2wasgiventohandlingofheavyloadsoverthecoreduringourrecent,refueling.

Mr.Eisenhut's letterrequiredsubmittal ofasubstantial amountofinformation atthistime.Duetothemagnitude oftheevaluations requiredandduetothesupportrequiredforourrecentrefueling outage,wehavebeenunabletocompletetheevaluations.

Specifically, werequireanadditional threemonths,untilSeptember 22,1981torespondtoSection2.1ofEnclosure 3toMr.Eisenhut's letter.Therequested confirmation ofimplementa-tionofmodifications andthejustification ofdeviations, whichwasrequested, isdirectlyrelatedtotheevaluations requiredbySections2.2,2.3and2.4ofEnclosure 3.Sinceresponsetothesethreesectionsisnotdueforsometimeyet,wewilldeferassessment ofmodifications andjustification of'eviations untilthattime.

(hAb ROCHESTER GASANDELECTRICCORP.DATEJune22,1981To=-Mr.DennisM.CrutchfieldSHEETNO.Untilthecompletion ofourevaluations andimplementation ofanycorrective actionswhichmayberequired, theimplementation oftheinterimactionsprovidescompensatory safetyactions.Verytrulyyours,Subscribed andsworntomeonthis~4~dayofJune1981.SHARONG.CAVALER$NOTARYPUBLIC,StateofN.Y.,MonroeCountyMyCommission ExpiresMarch30le&

ke'